Greenwich · SE10 SE3

Worktop installation in Maze Hill

Fitting day: protected route, back edges scribed to the real wall line, joins pulled flush, sink and hob sealed.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Alaska quartz running round a U-shaped kitchen in taupe handleless units, the sink under the window and a peninsula beyond

Maze Hill kitchens

The kitchens we meet in Maze Hill

You can plan worktop installation in Maze Hill from a floor plan, but the plan and the room have a habit of disagreeing once the tape comes out. Larger Georgian and Victorian houses on the park side, many divided into maisonettes. Whole houses tend to have a rear kitchen-diner running the full width of a back extension, while the converted flats keep a small galley squeezed into a former bedroom or the return. If that sounds like guesswork, it is not: it is measured on the day, in your kitchen, before anything is cut.

Chimney breasts are often taken out at ground level and left standing above, so the middle of the run is newer wall than the two ends of it. Protection down, dry-lay, scribe, then bond: the order matters more in a difficult room than an easy one. A bad floor is corrected under the carcass, never with sealant.

Electrics went in at conversion, some in surface trunking and some chased into lath and plaster, so no cable route in these rooms is safe to assume. Pieces are stood on edge for the turns and carried flat for the straights, and that sequence is agreed before anything comes off the van. Lath and plaster is not a fixing, and is treated accordingly.

What we are measuring in, mostly, is Georgian house, Victorian villa, Edwardian terrace and flat conversion. That mix is why two jobs on the same road can run completely differently.

Polished stone edge profile close up
  • Georgian house
  • Victorian villa
  • Edwardian terrace
  • flat conversion

True everywhere

Worktop installation, in short

  • One visit. A straightforward run is a morning; an island and splashbacks take most of the day.
  • Every piece is carried in by hand, and stone does not bend.
  • We seat and seal the sink and hob. We do not connect water, waste, gas or electrics.
  • Floors and units are protected before anything comes through the door.
Borough
Greenwich
Postcodes
SE10, SE3
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Maze Hill is its own job

A worktop is made to fit one kitchen, and in Maze Hill the kitchen and the way into it are what we work from. The hill is the problem, steep gradients up from the park gate, few dropped kerbs, and long paths behind front railings, so a two-man carry uphill on wet steps needs planning. Flat conversions here often put the kitchen on the first or second floor with no lift, so pricing has to reflect a stair carry rather than a doorstep drop. Both are settled at the template visit and written into the quote, so nothing about the day is discovered on your doorstep.

The work

What worktop installation involves

Installation is quoted on its own line, separately from the stone, so you can see what the fitting day costs rather than reading it off a rate per square metre. Every piece comes in through the house by hand, so the route is walked before the van is opened and the tight turn is found then rather than with three metres of stone in the air. You end up with a run fitted by the same firm that templated it, and with the offcuts, packaging and old sealant taken away rather than left in the front garden.

The fitting day is the day the templating either pays off or does not, and almost nothing that makes it hard belongs to the stone. Joins are drawn together with clamps and set flush, then cleaned off before the resin goes hard rather than sanded back afterwards. The hall turn is usually what decides whether a long piece arrives whole, and that is settled at template rather than discovered on the doorstep. The room is left clean and the offcuts go with us.

Edge profiles See the options

The money

What it costs in Maze Hill

What makes a fitting day expensive is almost never the stone. It is the building. Two facing runs mean two sets of edges and two scribes in a small span, which is why a compact galley rarely prices as cheaply as its area suggests. Material runs from £110 to £550 per square metre supply only, and the template, fabrication and fitting are quoted on their own lines. One visit, and what it covers is written down.

period detached houses and villas

What Maze Hill asks for

This is the work these streets generate. Worktop replacement follow it.

period detached houses and villas

The carry, and what it rules out

Counting hands matters more than counting metres on a staircase, because a piece two people lift off a van still wants three on the flight and a fourth watching the trailing corner. Protection goes down first, and what gets protected is decided by the route rather than by habit. The crew size follows from it.

period detached houses and villas

Maze Hill in the housing figures

Around here the twenties and thirties barely register, so the standard semi galley is not the shape we are fitting. The slow part is the scribe, and it is slow for a reason. Any adjustment happens before adhesive, never after.

Access

Getting stone into a Maze Hill kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Maze Hill is covered on our south east London run, along with the rest of Greenwich.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Maze Hill

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Is Maze Hill far enough out to be a problem for you?

Yes. Maze Hill is on the patch, and the postcodes we work here are SE10, SE3. It is worked on our south east London run, along with the rest of Greenwich. A free-parking street with cars both sides can still leave the van forty metres away, and that distance is carry, not driving. The fitting slot is set around it, which is why we ask about it when the date is booked and not before we leave the yard. A crew waiting for a space is a crew being paid to wait. Nothing needs visiting and nothing needs collecting: the template is in your kitchen and so is the fit.

02

What is different about worktop installation in Maze Hill?

The combination boiler hangs on whichever wall happened to be external, and that decision has already used up a stretch of the only wall the run wanted. The day is planned backwards from the hall. One datum, taken off the highest point of the floor. A run can measure dead right at both ends and still belly out in the middle, which only appears once the template plots the intermediate points. On the day it means dry-laying, marking, and cutting the scribe on site before anything is bonded. It is the slow part of the day and it should be.

03

Is access a problem in Maze Hill?

Suction lifters earn their keep on a straight flight and become a liability on a winder, where a handle standing out from the face is one more thing to catch on a wall. The fitting day is planned backwards from that point, before anything comes off the van. Protection goes down along it first. Where the van can pull up level with the gate the pieces are handled the fewest times, which is what actually protects them. A van that has to move mid-fit costs the best part of an hour and takes a man off the tools to do it. The carry length sets the number of hands on the job.

04

Is Maze Hill mostly worktop installation work for you?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop replacement. Party-wall and lease conditions in a converted building set when noisy work can happen, which shapes the fitting day more than the kitchen does. The fitting day is scheduled to suit that rather than to suit the diary. A slipped slot takes the next one with it. Several units in one building are fitted out to the same drawing, so an error on that drawing is an error repeated in every flat. Where the window is fixed there is no second day to fall back on, so the prep list matters more than usual. Six flats, six days, one kitchen at a time.

05

What makes one Maze Hill kitchen dearer than the next?

Galley runs are usually short enough to come out of a single slab, so the material band you choose does more to the total than the room shape does. On the day that means dry-laying the whole layout first and only then pulling and bonding the joins. The laying order follows the shape. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

06

What holds a template up more often than anything else?

Where a corner is a couple of degrees off, a mitre cut to a theoretical ninety degrees opens on the wall side and there is no closing it afterwards. Rushing that is what leaves a gap you look at every morning for fifteen years. Offered up twice, bonded once. Clear the full hall and stairs route of furniture, bikes, coats and stair-gates, and keep the front door propped and unobstructed for the carry. Flats bought out of managed stock keep the original kitchen dimensions long after the ownership changed, so the layout says very little about who is paying for the work. The fitting day is arranged with whoever can actually give us access for the whole slot. A cleared crew arrives with its paperwork done.

07

What if a worktop will not physically fit through the building?

A join added to get stone into the room is a different thing from a join added because the slab ran out, and the quote says which is which. Every piece goes in by hand and stone does not bend, so the tightest turn on the route sets the longest piece. Timber nosings chip under a slipped edge, so the treads are covered along the whole flight rather than only at the landings. Finding it out on the morning costs the whole slot, because there is no second route to fall back on. Every piece is staged to it before fitting starts.

08

Is one material less trouble than another for a Maze Hill kitchen?

Marble is the one people underestimate. It is porous, like granite, and wants sealing. Upkeep is settled when the slab is chosen, since it belongs to the material rather than the fabrication. Day to day all three want soap and water; abrasive creams and scouring pads are what dull a polished surface. The front door of the building sits at the top of a step off a tiled path, so the carry starts outside the building rather than at the door of the flat. Scribing takes longer than the carry does, so the quiet half of the day is the half that runs over. Settlement is packed out, never levered out.

09

Is taking the old top off part of the job?

An old stone top is heavier coming out than the new one is going in, and leaves in sections. If you want the old top kept for a garage or a utility, say so and it stays on site. The carcasses stay. Only the surface changes. Unrestricted does not mean empty, and a street that is clear at seven is usually full by nine. Two men and a long carry is a different day from two men and a drive, and the crew is sized on that. Moving the van mid-fit costs an hour nobody budgeted.

10

Do you do undermounted sinks in Maze Hill?

Each cut-out is priced on its own line, so a range, a bowl and a half, a boiling tap and a drainer are four items rather than one. Undermount bowls are cut and polished in the workshop and dry-fitted to the stone on the bench before anything is loaded. The walkway between the two runs is fixed by the units either side, so any overhang added to one worktop comes straight off the space somebody has to stand in. A layout that has been packed and levelled run by run instead of to one datum shows as a step where two pieces meet. Scribed one piece at a time.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Karem did a fantastic job at installing my antique bronze mirror for my coffee/drinks unit. He was really professional and his communication throughout was clear.”
KalsGoogle review
★★★★★
“We have a new kitchen. Our builder recommended Worktop Worx for our worktop. Now we have an amazing worktop very good price too. Really recommend. They were really good to us. 10/10”
j thomasGoogle review
★★★★★
“We recently had the Arctic Starburst worktop installed by Worktop WorX and it looks amazing. The subtle sparkle really catches the light and gives the kitchen a clean, modern feel. The Arctic Starburst surface feels high quality, durable, and is easy to keep clean. The finish and installation from Worktop WorX were spot on. Really happy with the result and would definitely recommend both Arctic Starburst and Worktop WorX to anyone upgrading their kitchen.”
Han LeeGoogle review · Arctic Starburst

Next step

Worktop installation in Maze Hill, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.