Greenwich · SE10 SE3

Worktop replacement in Maze Hill

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Capri White island with a brass bridge tap over the sink, the range cooker and lantern pendants beyond, dressed with eucalyptus

Maze Hill kitchens

The kitchens we meet in Maze Hill

The honest way to talk about worktop replacement in Maze Hill is to talk about kitchens first and worktops second, because one sets the terms for the other. Larger Georgian and Victorian houses on the park side, many divided into maisonettes. Whole houses tend to have a rear kitchen-diner running the full width of a back extension, while the converted flats keep a small galley squeezed into a former bedroom or the return. Send a few photographs of the run and we will tell you which of those you are dealing with before we come out to Maze Hill.

Chimney breasts are often taken out at ground level and left standing above, so the middle of the run is newer wall than the two ends of it. The old tops come off in pieces, and what is under them decides whether the units need levelling before anything new goes on. Laminate hides a level that stone will not.

Kitchens in the upper flats often sit in the return wing at half-landing level, so there are three or four steps inside the flat before the room is reached at all. In most Victorian terraces the kitchen sits in the back addition, so you get a narrow galley with one outside wall and nothing square to work off. Nothing goes back on carcasses the building has pulled out of square.

The stock behind these kitchens runs to Georgian house, Victorian villa, Edwardian terrace and flat conversion. Which of those you have decides most of what follows.

Undermounted sink cut-out in a quartz worktop
  • Georgian house
  • Victorian villa
  • Edwardian terrace
  • flat conversion

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
  • The carcasses have to be sound: stone is far heavier than laminate.
  • Templating happens in the room, and it is the measurement everything else is cut from.
Borough
Greenwich
Postcodes
SE10, SE3
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Maze Hill is its own job

We would rather tell you what a fit in Maze Hill is going to involve now than discover it with a slab in the hallway. The hill is the problem, steep gradients up from the park gate, few dropped kerbs, and long paths behind front railings, so a two-man carry uphill on wet steps needs planning. Flat conversions here often put the kitchen on the first or second floor with no lift, so pricing has to reflect a stair carry rather than a doorstep drop. Anything about the Maze Hill job that adds work is on the quote as its own line, not buried in a total.

The work

What worktop replacement involves

Replacement suits a kitchen that works but has a surface past saving, burnt, swollen at the joints, or lifting where water has found its way into the board underneath. The template and the fit are separate visits with three to seven working days between them, so the kitchen is only out of action on the day the old surface comes off. You are left with a kitchen that did not have to be emptied, replanned or lived without, and one new element in a room that otherwise did not change at all.

Replacement is two jobs in one visit: taking the old surface out, and setting the new one on what is left behind. The carcasses are read for swelling, soft ends and any fall along the length once the top is off, and that reading is what the day gets costed against. Original cabinets are long gone here, and what comes out is a flat-pack run that has spent fifteen years on a cold solid floor. Nothing is taken apart that does not have to be.

Sink cut-outs See the options

The money

What it costs in Maze Hill

What the old worktop was fixed to matters more to the price than what goes on top of it. Short lengths nest well and waste little, so the material line is usually the kindest part of a galley quote. The supply rate of £110 to £550 per square metre reads the same for a small kitchen and a large one. Everything that makes them different jobs appears further down the quote. Priced on the kitchen you have, not the one on the plan.

period detached houses and villas

The carry, and what it rules out

A communal flight is out of use while a piece is on it, so the carry is timed so nobody is trying to pass on a half-landing. With no room to turn, the old top gets cut up in the kitchen instead, which is dusty work and needs the room emptied first. The old top leaves by the route the new one arrives on.

period detached houses and villas

What Maze Hill asks for

It comes up regularly here without being the commonest job, which is worktop installation. The visit, the workshop and the crew are identical either way.

period detached houses and villas

Maze Hill in the housing figures

Taken across Maze Hill and the roads either side of it, the twenties and thirties barely register, so the standard semi galley is not the shape we are fitting. The old top usually tells us what the next one on the street will be hiding. Disposal is a line on the quote, not a surprise.

Access

Getting stone into a Maze Hill kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Maze Hill is covered on our south east London run, along with the rest of Greenwich.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Maze Hill

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Is Maze Hill far enough out to be a problem for you?

Yes. Maze Hill is on the patch, and the postcodes we work here are SE10, SE3. It is worked on our south east London run, along with the rest of Greenwich. With no scheme to work with there is nothing to book and nobody to ring, so the only levers left are an early arrival and a word with the neighbours. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. Waste needs a space of its own and the street rarely offers one. The work comes to you. We template in your kitchen and fit in your kitchen, with nothing to visit or collect.

02

What should I expect from worktop replacement in a Maze Hill kitchen?

The partitions put in at conversion are studwork standing on the old floor, so they take a fixing well but carry nothing, and a heavy end panel needs a different answer. Lath-and-plaster and bowed brickwork mean we template for scribes rather than straight cuts, and each piece is offered up and eased in rather than dropped straight down. What is under the old top is the real question. A room can be out of square in both directions at once, so the wall that leans is also the wall that runs downhill, and one scribe cannot answer both. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. The laminate has been covering it up.

03

How would you get a worktop into a property in Maze Hill?

A fitted stair carpet is either lifted or covered, because grit trodden into it under work boots does more harm than the carry itself. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. Where it will not come out whole it comes out in sections. Unrestricted kerbside is straightforward as long as the space in front of the property is actually clear when the van arrives. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. A timed bay does not cover a strip-out and a fit.

04

Is there a lot of worktop replacement work in Maze Hill?

Often enough. It is one of the three, behind worktop installation. The template, the workshop and the installers are the same either way. Party-wall and lease conditions in a converted building set when noisy work can happen, which shapes the fitting day more than the kitchen does. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. A plumber either side of us. Several units in one building are fitted out to the same drawing, so an error on that drawing is an error repeated in every flat. The carcasses have to be sound, because stone is several times the weight of what is coming off. The fastest upgrade a sound kitchen has.

05

What moves the number on a quote around here?

The two runs are rarely the same length, and the shorter one often carries the sink, which puts the cut-outs in the piece with the least material to spare. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. The units stay, the surface changes. The supply-only figure for material runs £110 to £550 per square metre, and templating, fabrication and fitting are lines of their own.

06

What state does a Maze Hill kitchen have to be in before you template?

Plaster thickness varies over the height of a wall, so the line at worktop height is not the line at skirting level, and the units decide which one matters. We would rather find it at template than on the morning, which is why the templater looks behind the units. Found at template, not on fit day. Have a plumber booked to disconnect the sink, tap and waste first thing and reconnect after we have gone, and clear the hallway and stairs completely so we can carry slabs through the house. The same building type can arrive as a careful one-off kitchen or as a fast turnaround, and the honest answer is that they are priced differently. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Owners phase this work; a void period cannot.

07

Can you machine drainer grooves into the stone?

Where there is no room for a separate drainer, grooves are usually what gets specified instead. The alternative stands on the surface, so the choice is losing worktop permanently or only while you are draining. The bowl position has to be settled before templating, since the grooves are set out from it. An under-stairs cupboard eats one end of most of these kitchens, and the run stops at a door that has to keep opening. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. Chipboard carcasses get bracing before stone lands on them.

08

How much upkeep is a stone worktop?

Quartz carries resin, so a hot pan wants a trivet, while granite and sintered stone will take one without complaint. Day to day all three want soap and water; abrasive creams and scouring pads are what dull a polished surface. Topping a seal up is a wipe-on job with a cloth. The flat entrance door is a certified fire door on a closer, and taking it off for an hour means dealing with the seals and the closer before the day ends. Carcasses are checked for square and fixed back before a stone top goes on them. Sound carcasses are the one condition.

09

What do you need from me for the sink and hob cut-outs?

If the sink or hob changes after the template, the drawing changes first and nothing is cut meanwhile. The tap hole is drilled in the workshop too, and its position depends on how far the tap has to swing. Where the hob lands is set out against the units and the wall behind, not off the kitchen plan. A tall bank of housings at one end takes a chunk out of the working run, so the usable length of that side is always less than the length of the wall behind it. Going from a 38mm laminate to 20mm or 30mm stone drops the surface, which shows against tiles, a window board and any freestanding appliance. Carcasses have to be sound first.

10

Will I be able to see the joins?

Each join is an item on the drawing, so the layout and the figure move together. Veining carries through a join where both pieces come off the same slab, which is decided at nesting. Join count and position are settled from the template drawing rather than improvised on the fitting day. A full-depth tall unit projects past the worktop line, and the run has to be scribed against its side panel instead of carrying on past it. The shape is already there to be measured, which makes the template straightforward and leaves the strip-out as the part that actually needs planning. Height change is checked before we cut.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Really impressed with the quality and finish of these worktops. Great range of materials, precise fabrication, and smooth communication throughout. The whole process was easy and the final result looks fantastic. Highly recommend!”
Nastasia DragoGoogle review
★★★★★
“We installed new kitchen and got the worktop and splash back from them. Their professional work and commitment was wonderful. Quality of work compared to price was way too good. Thank you guys.”
MD Matinur RahmanGoogle review
★★★★★
“I am really happy with my worktop. It is beautiful and the service provided was second to none. I totally recommend.”
Magaly RGoogle review

Next step

Worktop replacement in Maze Hill, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.