Islington · N1 N16

Worktop replacement in Mildmay

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Open-plan room with a navy feature wall, the Arctic Starburst peninsula and bar stools at the far end beyond the sofa

Mildmay kitchens

The kitchens we meet in Mildmay

No two streets in Mildmay throw up the same problem, and the replacements we book there are priced off what is actually behind the units rather than off a floor plan. Uniform Victorian terraces mostly divided into flats, so the recurring job is a rear-addition kitchen of about 3m in an L with the sink under a window onto a shared garden. Whole-house owners tend to build a small rear infill rather than a full side return, because the plots are narrow. Nothing above needs settling before you get in touch. It gets settled with a tape measure, in your kitchen, in Mildmay.

Nothing in a house of this age is square, and the kitchen is usually the part that has been altered most often. A kitchen that has stood twenty years has settled into a shape of its own, and the new stone is cut to that shape rather than the original one. Chipboard carcasses get bracing before stone lands on them.

The meters sit in the hall or under the stairs on the way through, so the carry passes a cupboard door that has to be shut and protected before anything moves. Carcasses are checked for square and fixed back before a stone top goes on them. The old top hid it; the new one will not.

What the surveys keep coming back to is Victorian terrace, Edwardian terrace, conversion flat and post-war infill. The run length that is easy in one is a join in another.

Mitred waterfall edge detail on a quartz island
  • Victorian terrace
  • Edwardian terrace
  • conversion flat
  • post-war infill

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • The carcasses have to be sound: stone is far heavier than laminate.
  • Templating happens in the room, and it is the measurement everything else is cut from.
  • A run longer than a single slab arrives in pieces, with a join between them.
Borough
Islington
Postcodes
N1, N16
Covered on
our north London run
Fitted
5–10 working days from template

The place

Why Mildmay is its own job

Before we quote a length in Mildmay we want to know how the stone gets in and what it will be sitting against. A filtered-street scheme closes several through routes so the approach has to be planned street by street, and parking is permit-only Monday to Friday and tight all day. The terraces are shallow-set with two or three front steps and a hall under a metre wide. Narrow rear additions here often will not take a 600mm run plus a walkway, so check clearances at template and be ready to advise a 560mm depth instead. We would rather lose the job at the quote than lose your morning on the day of the fit.

The work

What worktop replacement involves

The fitting workmanship carries the same five year guarantee as a new kitchen, because setting stone is the same work whether the units went in last month or a decade ago. The template and the fit are separate visits with three to seven working days between them, so the kitchen is only out of action on the day the old surface comes off. You are left with a kitchen that did not have to be emptied, replanned or lived without, and one new element in a room that otherwise did not change at all.

Replacement is the job where the tiling, the sink and the wall behind them all get settled at the same time as the worktop. The carcasses are read for swelling, soft ends and any fall along the length once the top is off, and that reading is what the day gets costed against. Original cabinets are long gone here, and what comes out is a flat-pack run that has spent fifteen years on a cold solid floor. Nothing is taken apart that does not have to be.

Waterfall ends See the options

The money

What it costs in Mildmay

What the old worktop was fixed to matters more to the price than what goes on top of it. An L has a return, and a return rarely nests neatly on a slab, so the yield question arrives earlier than it does on a straight run. A per square metre figure of £110 to £550 describes stone, not a worktop. What turns one into the other is machining and a fitting day, and both are listed as themselves. The strip-out and the disposal are their own lines.

Victorian and Edwardian terraces

What Mildmay asks for

More of our week goes on this than on worktop installation put together.

Victorian and Edwardian terraces

The shape of the run

The return piece is the awkward one on a slab: short, full depth, and rarely nesting neatly against the long lengths, so yield rather than area is what moves the material figure. Old laminate has often been holding a run square for years, and taking it off shows what the units were really doing. Any overhang gets underpinned first.

Victorian and Edwardian terraces

Mildmay in the housing figures

On the Mildmay streets we cover, converted and purpose-built flats make up most of the stock. A stone top leaves in sections, and getting those sections down the stairs is where the labour goes. Priced on the units we find, not the ones on the drawing.

Access

Getting stone into a Mildmay kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

North London patch

Mildmay is covered on our north London run, along with the rest of Islington.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Mildmay

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you actually work in Mildmay, or just list it?

Yes. Mildmay is on the patch, and the postcodes we work here are N1, N16. It is worked on our north London run, along with the rest of Islington. Where the nearest legal space is a couple of streets back, the walk with each piece becomes the job, and the crew is sized for walking rather than wheeling. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. The old tops have to go somewhere as well. Template and fit both happen at the property, so there is nothing to drive to and nothing to collect.

02

What should I expect from worktop replacement in a Mildmay kitchen?

The back addition is a narrow two-storey outrigger with a single external wall, and the kitchen galley runs the length of it. In most Victorian terraces the kitchen sits in the back addition, so you get a narrow galley with one outside wall and nothing square to work off. The wall behind the old top has not been seen in years. Two walls each a degree out give an internal corner two degrees out, and the whole of that error lands in the mitre. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. The laminate has been covering it up.

03

How would you get a worktop into a property in Mildmay?

A tiled hall floor takes a dropped corner badly, so boards go down over the tiles before anything comes through the door. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. It decides whether the old top leaves whole. Applying for a suspension means naming a length of kerb and a date, and moving the date generally means applying for it again. We stage the strip-out so the old tops leave in one trip rather than trickling out across the afternoon. Access out counts as much as access in.

04

Does worktop replacement come up more than anything else in Mildmay?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop installation. A converted flat is measured off the original house, so no two units in the same building have quite the same kitchen run. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. A plumber either side of us. Kitchens go in near the end of a conversion, behind the plastering and the flooring, by which point the programme has already absorbed whatever slipped earlier. The carcasses have to be sound, because stone is several times the weight of what is coming off. The fastest upgrade a sound kitchen has.

05

What moves the number on a quote around here?

An L can be mitred at the corner for a continuous look or butt-jointed over the gable, and the two are different money and different risk. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. The shape is measured again, not copied off the old top. Material runs £110 to £550 per square metre supply only, and templating, fabrication and fitting each get their own line.

06

What state does a Mildmay kitchen have to be in before you template?

A scribe has a working limit, and past twenty millimetres or so the back edge starts eating depth the run cannot spare. This is the commonest reason a replacement turns out to need more than a straight swap. Found at template, not on fit day. Have a plumber booked to disconnect the sink, tap and waste first thing and reconnect after we have gone, and clear the hallway and stairs completely so we can carry slabs through the house. Whoever manages the block controls the lift booking, the bin store and the visitor parking, and none of that sits in the gift of the household whose kitchen it is. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Owners phase this work; a void period cannot.

07

Will you fit stone onto units that are not level?

Stone does not flex, so a run that rocks on its carcasses rocks just as badly once it is stone. Units have to be fixed down as well as levelled. A loose carcass moves under stone. An island is where this usually shows, standing free with no wall to level against. Walls that bow along their length are the normal condition rather than the exception, and a straight-cut back edge will show a shadow gap at one end and touch at the other. We would rather find it at template than on the morning, which is why the templater looks behind the units. It is the usual surprise, and it is a known one.

08

Do you take on fitting-only work in Mildmay?

The quote is itemised, so a job where you already hold the slab is the same job with the material line taken off it. How much slab you hold matters: upstands and any remake have to come out of the same batch. Studio and one-bed conversions put the whole kitchen against a single wall, so the job is one run and everything depends on that one length. Old tops out in the morning, new stone down and sealed the same afternoon. One flat out of use at a time.

09

What if the stone cannot get up the stairs in a Mildmay flat?

The carry route is measured before anything is cut, so a piece that will not make the turn is split at the drawing stage rather than discovered on the day. A piece travels on edge, never flat, because on edge is how stone of that length carries its own weight. Every internal doorway on the way through is another frame to clear, and internal doors come off their hinges rather than being propped open. With no room to turn, the old top gets cut up in the kitchen instead, which is dusty work and needs the room emptied first. Both movements are planned as one.

10

Where will the joins be?

What you get is a line rather than a step, because the pieces are levelled to each other first. A mitred join at a corner is a different job from a butt join along a run, and they are not priced the same. A finished join is typically two to three millimetres, colour-matched and sanded flush. Where the return runs into a wall that is out of square, the corner is templated as the angle it really is rather than as ninety degrees. Going from a 38mm laminate to 20mm or 30mm stone drops the surface, which shows against tiles, a window board and any freestanding appliance. Laminate hides what the gables are really doing.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Kareem did the countertops dur8ng my kitchen remodel, and I was so impressed that I had him back to do the laundry room as well, which tells you everything you need to know. He is an absolute gem. Shows up when he says he will (which, let’s be honest, is rarer than it should be), does beautifully work, and clearly takes real pride in what he does. The countertops look fantastic, and he even went above and beyond, using leftover quartz to create an extra counter in my bathroom. Genius. He’s kind, professional, reasonably priced, and just gets on with it. No fuss, no drama, just a job very well done. I wouldn’t hesitate to recommend him and will absolutely be using him again if the need arises. Happy to answer any questions.”
Susie WigginsGoogle review
★★★★★
“Karim is excellent, he did superb job with Templeting and fitting my kitchen, highly recommend”
M SgGoogle review
★★★★★
“I am really happy with the work! He fitted my kitchen granite worktop really nicely and got the job done on time, just as promised. He was friendly, professional, and made sure everything was done the way I wanted. Would definitely recommend Karam to anyone looking for a great job!”
esther boaduGoogle review · granite

Next step

Worktop replacement in Mildmay, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.