Southwark · SE1 SE17

Worktop replacement in Newington

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Open-plan room with a navy feature wall, the Arctic Starburst peninsula and bar stools at the far end beyond the sofa

Newington kitchens

The kitchens we meet in Newington

Worktop replacement in Newington is not one job repeated, because the kitchens here are not one kind of kitchen. A mix of narrow Georgian and Victorian houses split into flats, where each flat gets a kitchen carved out of what was a bedroom - short runs of 1.8m to 2.4m, sink under a sash window, and a lot of appliance-under-worktop planning in a small footprint. You will get a firm figure for your Newington kitchen once it has been templated, and that figure does not move afterwards.

Lath and plaster, a settled floor and a hall with a turn in it are the three things that decide how this job runs. A kitchen that has stood twenty years has settled into a shape of its own, and the new stone is cut to that shape rather than the original one. The old cut-outs rarely match where the new appliances go.

Where the kitchen has taken the bay, the end of the room is three facets of glass set at angles and there is no straight wall left to finish against. Carcasses are checked for square and fixed back before a stone top goes on them. Units kept, surface changed, one day.

What the surveys keep coming back to is Georgian terrace, Victorian terrace, Edwardian mansion flats and postwar estate. The run length that is easy in one is a join in another.

Mitred waterfall edge detail on a quartz island
  • Georgian terrace
  • Victorian terrace
  • Edwardian mansion flats
  • postwar estate

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • The carcasses have to be sound: stone is far heavier than laminate.
  • Templating happens in the room, and it is the measurement everything else is cut from.
  • A run longer than a single slab arrives in pieces, with a join between them.
Borough
Southwark
Postcodes
SE1, SE17
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Newington is its own job

A firm that has not worked in Newington tends to find out about the access on the morning of the fit, which is too late to change anything. Dense terraced streets with permit-only bays all day and no driveways, so a suspension or an early start is the only realistic way to get a slab trolley to the front door. Converted flats mean unknown floors - lift a laminate top here and you often find chipboard carcasses on a springy floor that need bracing before stone goes on. Book the free design visit and we will come to Newington, measure what is actually there, and quote against it.

The work

What worktop replacement involves

It still needs templating, because the new top is cut to the units as they stand now rather than to whatever the original worktop was cut to years ago. Where a carcass end has swollen or a run has dropped, that is put right before the new top goes on, because stone will not correct a surface that is out of true and will not forgive one either. You end up spending on the surface rather than on the cabinetry, which is where the money shows, because a worn top ages a kitchen faster than doors that are still square.

Most of a replacement happens before any stone is unwrapped, because the removal and what it exposes set everything that follows. A bonded stone top is broken down where it sits before it is taken out, because it will not come away from the cabinets whole. A kitchen in one of these has been re-fitted at least twice already, and every fit left something behind under the top. You keep the kitchen; only the top is new.

Waterfall ends See the options

The money

What it costs in Newington

A replacement is the cheapest way to change how a kitchen looks, provided the units underneath are sound. In a galley the runs are short and the cut-outs are close together, so the fixed operations carry more of the total than the stone does. Supply is £110 to £550 per square metre, and it is the least interesting line on the quote, because the operations listed underneath it are what separate one job from another. No surprises pulled out from under the old top.

period detached houses and villas

Newington in the housing figures

On the Newington streets we cover, most homes are rented rather than owned. A void week is the easiest slot to take, and it is worth asking for before a tenant moves in. No gap in the kitchen overnight.

period detached houses and villas

The carry, and what it rules out

The step and the gap at the car threshold catch a trolley wheel, so the piece comes off the trolley and goes in by hand. The old tops leave by the same route, so the carry out and the skip or van are planned alongside the carry in. The room is cleared for the way out as much as the way in.

period detached houses and villas

What Newington asks for

Most of what we are called out for around here is this rather than worktop installation.

Access

Getting stone into a Newington kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Newington is covered on our south east London run, along with the rest of Southwark.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Newington

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do your own fitters come out to Newington?

Yes. Newington is on the patch, and the postcodes we work here are SE1, SE17. It is worked on our south east London run, along with the rest of Southwark. A dedicated loading bay or service yard is the easiest arrangement in a managed building, provided the slot is booked and someone has the key to the shutter. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. A one-hour window will not hold a two-way job. There is nothing to drive to and nothing to pick up, because both visits are to the property itself.

02

What should I expect from worktop replacement in a Newington kitchen?

Cornice runs round the head of the wall, so the wall units stop under it and the splashback band is trapped between two things that are not going to move. In most Victorian terraces the kitchen sits in the back addition, so you get a narrow galley with one outside wall and nothing square to work off. Sound carcasses are the one condition. A scribe has a working limit, and past twenty millimetres or so the back edge starts eating depth the run cannot spare. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. Found at template, not on fit day.

03

How would you get a worktop into a property in Newington?

Where a basement car park is the only way up from the parking level the carry starts below ground, and two lifts in one building rarely share the same internal dimensions. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. Old material is stacked outside rather than left along the route. Bay bookings are usually an hour or two, which is fine for unloading and no use at all as a place to leave the van for a day. We stage the strip-out so the old tops leave in one trip rather than trickling out across the afternoon. The strip-out waits until the new stone has somewhere to stand.

04

Is Newington mostly worktop replacement work for you?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop installation. Party-wall and lease conditions in a converted building set when noisy work can happen, which shapes the fitting day more than the kitchen does. The carcasses have to be sound, because stone is several times the weight of what is coming off. The fastest upgrade a sound kitchen has. Several units in one building are fitted out to the same drawing, so an error on that drawing is an error repeated in every flat. Old tops out in the morning, new stone down and sealed the same afternoon. One flat out of use at a time.

05

What moves the number on a quote around here?

Handles on opposing runs meet in the middle of the aisle, so a deep edge profile specified on both sides takes width out of the standing space twice over. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. Carcasses have to be sound first. Reckon on £110 to £550 per square metre for the material supply only, with templating, fabrication and fitting itemised separately.

06

What state does a Newington kitchen have to be in before you template?

Walls that bow along their length are the normal condition rather than the exception, and a straight-cut back edge will show a shadow gap at one end and touch at the other. This is the commonest reason a replacement turns out to need more than a straight swap. It is the usual surprise, and it is a known one. Have a plumber booked to disconnect the sink, tap and waste first thing and reconnect after we have gone, and clear the hallway and stairs completely so we can carry slabs through the house. Two flats with an identical layout can want entirely different things from the same run of worktop, which is why the quote follows the run rather than the address. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Whoever owns the carcasses owns that call.

07

Does a stone worktop need sealing?

Bleach and limescale remover harm a polished finish rather than clean it, whichever material is on the units. Granite is porous to varying degrees, so it is sealed when we fit it and topped up over the life of the worktop. Marble is the one people underestimate. It is porous, like granite, and wants sealing. The chimney breast is usually still standing with the opening blocked up, and the alcoves either side of it are rarely the same width as each other. Lath-and-plaster and bowed brickwork mean we template for scribes rather than straight cuts, and each piece is offered up and eased in rather than dropped straight down. Off in the morning, on by the afternoon.

08

Where will the joins be?

Join count is a question about slab size and run length, nothing else. Veining carries through a join where both pieces come off the same slab, which is decided at nesting. A mitred join at a corner is a different job from a butt join along a run, and they are not priced the same. Older houses put the boiler or the meter on one of the two walls, and whatever is boxed in around it sets the point where that run has to stop. Old laminate has often been holding a run square for years, and taking it off shows what the units were really doing. Height change is checked before we cut.

09

What happens if my units are not level?

A long top on units that were shimmed once and never checked is the commonest version of this, and it is cheap to fix beforehand. If the carcasses are corrected, the template is taken again, since a drawing off units that then moved is worthless. A run can measure dead right at both ends and still belly out in the middle, which only appears once the template plots the intermediate points. We would rather find it at template than on the morning, which is why the templater looks behind the units. It was there long before we were.

10

Can I have stone up the wall in a Newington kitchen?

Upstand or splashback, the stone is cut from the same slab run as the worktop, at the same time, so the batch actually matches. Stone up a wall is heavier than tile and bonded rather than hung, so the wall has to be sound. Tiling and stone can meet, but where they meet is decided before the template rather than after. A top-floor conversion puts part of the kitchen under the slope of the roof, so the wall behind the run stops at head height along one side of the room. What the old top has been hiding is usually a floor that settled towards the back and units that were never fixed back to the wall. The old top hid it; the new one will not.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Really impressed with the quality and finish of these worktops. Great range of materials, precise fabrication, and smooth communication throughout. The whole process was easy and the final result looks fantastic. Highly recommend!”
Nastasia DragoGoogle review
★★★★★
“We installed new kitchen and got the worktop and splash back from them. Their professional work and commitment was wonderful. Quality of work compared to price was way too good. Thank you guys.”
MD Matinur RahmanGoogle review
★★★★★
“I am really happy with my worktop. It is beautiful and the service provided was second to none. I totally recommend.”
Magaly RGoogle review

Next step

Worktop replacement in Newington, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.