The building, and what it does to the job
On the Somers Town streets we cover, very few homes are lived in by their owners. A boxed riser is usually somewhere in the run. Whether it is stone or tile is usually a budget decision made by someone who will never see the room. Templated after the top is in, never before.
The kitchen is a small square room off a narrow entrance lobby, and the turn out of that lobby is the real limit on piece length. A short band of wall over the sink is often better filled by one panel than by an upstand and a strip of tile above it. The age of the plaster decides the fixing, not the finish.
Larder and meter recesses in these blocks generate a lot of small returns and cut-outs, so the fabrication list runs longer than the overall run lengths suggest.
