An under-stairs cupboard eats one end of most of these kitchens, and the run stops at a door that has to keep opening. The old tops come off in pieces, and what is under them decides whether the units need levelling before anything new goes on. Twenty years of settlement is measured, not argued with.
Heavy flat-conversion territory, so a lot of kitchens are the rear half of a first-floor conversion or a lower-ground room off a light well, which keeps runs to 2.4-3.2m single-wall or a shallow L with the sink under the window. Where a whole house is refitted, the room tends to allow a rear knock-through with a 3m run and a peninsula rather than a full island.
Most drops are a shared front door then a turn onto a narrow converted landing, so a 3m slab often cannot be carried flat past the newel post. The CPZ runs seven days near the markets, the streets around the Lock are pedestrianised or clogged with market traffic until late, and Camden Road and Kentish Town Road are constant bus routes with nowhere to sit a van. Getting material up a converted staircase can mean planning a join for that reason alone, and we check the floor first, because conversion floors above a shop or a pub can bounce under 30mm quartz.
The archetypes on this patch are early Victorian terrace, Georgian-style stucco terrace, post-war ex-local-authority block and canal-side new build. The floor datum is the thing that changes most between them.