Camden · NW1

Kitchen worktops in Regent's Park

Two extremes within a few hundred metres: listed Nash terraces where the kitchen is in the basement or lower ground with vaulted ceilings and a service stair, and the neighbouring post-war estate with small standard galleys. In the listed houses the room is deep, cool and awkwardly shaped, and the layout works around structural walls that cannot be touched.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Open-plan room with a navy feature wall, the Arctic Starburst peninsula and bar stools at the far end beyond the sofa

The housing stock

What we are usually working with in Regent's Park

An under-stairs cupboard eats one end of most of these kitchens, and the run stops at a door that has to keep opening. A run that has to be scribed twice takes an hour longer than one that does not, and the day is costed with that hour in it. Door fronts and stone edges get checked against each other first.

In the Nash terraces you are working under listed consent against vaulted, uneven basement walls where nothing is square, so template on site and expect a scribe on every back edge. The Outer Circle has strict waiting restrictions and no loading in front of the terraces, so access to the listed houses is by an area stair or a rear service entrance.

The closet wing is a narrow projection at the back with windows on two sides, which leaves very little continuous wall for a run. Scribing takes longer than the carry does, so the quiet half of the day is the half that runs over. What the building will take decides how it is fixed.

The stock behind these kitchens runs to Nash stucco terrace, Regency villa, post-war estate and mansion block. The one you have sets the piece length before the kitchen does.

Access. The post-war estate has its own internal roads and lifts, which is a completely different set of rules on the same day.

There is nothing to visit in Regent's Park. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.

Borough
Camden
Postcodes
NW1
Covered on
our central and north London run
Lead time
5–10 working days from template

Get a fixed quote Free samples

  • Nash stucco terrace
  • Regency villa
  • post-war estate
  • mansion block

Camden

The building, and what it does to the job

The bathroom upstairs sits directly over the kitchen, so its waste comes down in a boxed corner from floor to ceiling that no worktop is going to move. Old skirting behind the carcasses is checked at worktop height, since that is what decides whether the top can go back tight. A structure this old is worked with, not corrected.

Getting stone into the room

The top step is rarely the end of it, because a door swinging out onto the landing has to be held back before a piece can come off the flight. We walk the route with a tape and protect it end to end before the first piece is lifted. That is what the morning is planned around.

Regent's Park in the housing figures

Locally an unusually large share of homes fall in the upper council tax bands. Stair turns and landing widths decide the piece list. It decides how many hands the day needs, which is the part people find out late. What the survey found is what gets carried in.

Corners and joins See the options

Nearby

We also work around Regent's Park

Regent's Park is one of 23 places we cover in Camden. Camden in full

The whole Watford patch

Questions

Working in Regent's Park

01

Do you take on Regent's Park kitchens?

Yes. Two extremes within a few hundred metres: listed Nash terraces where the kitchen is in the basement or lower ground with vaulted ceilings and a service stair, and the neighbouring post-war estate with small standard galleys. In the listed houses the room is deep, cool and awkwardly shaped, and the layout works around structural walls that cannot be touched. Where the frontage is a clearway the unload happens away from the door and the carry gets longer, which is a crew and time question rather than a stone one. The fitting slot is set around it, which is why we ask about it when the date is booked and not before we leave the yard. The van does not stay on a main road once it is empty.

02

What is the housing like from a worktop point of view in Regent's Park?

Nash stucco terrace, Regency villa, post-war estate and mansion block. Original panelling and shutter boxes stand out from the structural wall, so the face the units meet is joinery rather than plaster. The day is planned backwards from the hall. The age of the house sets the pace of it.

03

Is getting the worktop in the hard part in Regent's Park?

The Outer Circle has strict waiting restrictions and no loading in front of the terraces, so access to the listed houses is by an area stair or a rear service entrance. The post-war estate has its own internal roads and lifts, which is a completely different set of rules on the same day. Counting hands matters more than counting metres on a staircase, because a piece two people lift off a van still wants three on the flight and a fourth watching the trailing corner. The fitting day is planned backwards from that point, before anything comes off the van. It gets checked before the first piece is lifted.

04

What do you get asked for most in Regent's Park?

Worktop installation, in that order. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. The fitting day is scheduled to suit that rather than to suit the diary. One kitchen out of use, never the whole house. In the Nash terraces you are working under listed consent against vaulted, uneven basement walls where nothing is square, so template on site and expect a scribe on every back edge.

05

Why do Regent's Park quotes vary so much?

A run that stops in mid-air at the open end needs a finished end rather than a cut one, and that end takes the same edge work as the whole front. On the day that means dry-laying the whole layout first and only then pulling and bonding the joins. Support first, stone second. Two walls each a degree out give an internal corner two degrees out, and the whole of that error lands in the mitre. On the day it means dry-laying, marking, and cutting the scribe on site before anything is bonded. The overhang is checked again once the feet are set. Material is from £110 per square metre supply only, and the templating, the fabrication and the fitting are each quoted on their own line.

06

Is a leasehold flat in Regent's Park any harder to do?

One owner can take a date next week while the flat below needs three weeks of notice, so several kitchens in one building end up scheduled by the slowest permission. The fitting day is arranged with whoever can actually give us access for the whole slot. A void between tenancies has no spare days in it. If we know the building when you book, the lift, the stair turn and any freeholder notice are worked into the day rather than found on it.

07

What if the base units are out of level?

A sloping floor is not the problem. The plane the unit tops finish in is. The check comes before the measuring rather than after, because the whole drawing is set out from that plane. Levelling belongs in the carcasses, on their own legs and packers. A scribe has a working limit, and past twenty millimetres or so the back edge starts eating depth the run cannot spare. Rushing that is what leaves a gap you look at every morning for fifteen years. A scribe is a cut. It is not an adjustment.

08

Are drainer grooves cut on site or in the workshop?

Grooves and an undermounted bowl are usually specified together, since the grooves are run to the bowl edge. On a porous stone the grooved area is sealed with the rest, and it gets wet more than anything else. Nothing in a house of this age is square, and the kitchen is usually the part that has been altered most often. The fitting day is planned backwards from all of it, before the first piece comes off the van. The whole run is dry-fitted before any adhesive is opened.

09

Does a stone worktop need sealing?

Upkeep is settled when the slab is chosen, since it belongs to the material rather than the fabrication. Sealing is the one maintenance job that genuinely differs by material, and it is worth knowing which you are buying before the slab is chosen. Day to day all three want soap and water; abrasive creams and scouring pads are what dull a polished surface. A basement is often reached by its own door under the front steps, and that door is smaller than anything else on the route. We measure the front door, the hall width and the turn into the kitchen before anything comes off the van, because a 3m piece has to swing through that corner on edge and stone does not bend to help you. Walked, measured, protected, then lifted.

10

Is a full-height splashback practical in a Regent's Park kitchen?

Socket and switch positions have to be final before templating, because the openings are machined rather than chopped out on the wall. A full-height piece behind the hob has to allow for the extractor, so that gets settled first. The joint between splashback and worktop is siliconed, never grouted, so it can move a little without cracking. Georgian houses put the kitchen in a basement or a rear closet wing, and the stairs down to it are the tightest part of the whole route. Pieces are stood on edge for the turns and carried flat for the straights, and that sequence is agreed before anything comes off the van. The slow parts are slow for a reason.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Really impressed with the quality and finish of these worktops. Great range of materials, precise fabrication, and smooth communication throughout. The whole process was easy and the final result looks fantastic. Highly recommend!”
Nastasia DragoGoogle review
★★★★★
“We installed new kitchen and got the worktop and splash back from them. Their professional work and commitment was wonderful. Quality of work compared to price was way too good. Thank you guys.”
MD Matinur RahmanGoogle review
★★★★★
“I am really happy with my worktop. It is beautiful and the service provided was second to none. I totally recommend.”
Magaly RGoogle review

Next step

Get your Regent's Park kitchen priced

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.