Ealing · W5

Splashbacks and upstands in South Ealing

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

South Ealing kitchens

The kitchens we meet in South Ealing

A good quote for splashback and upstand work in South Ealing reads like a description of your kitchen rather than a price list, and that is deliberate. Edwardian terraces with the standard side-return infill, producing a 5m single-wall galley plus a slim island, rooflights overhead and the run terminating at a set of bifolds. You do not need to know which one you have before you call. We work that out on the survey.

Chimney breasts and the alcoves either side of them break the run into short pieces before anyone has drawn a kitchen. Height is set off the units and the hob, not off the tile line that was there before. A bowed wall gets measured at three heights first.

The boiler has usually been moved out of the main house into the addition, and its flue, its pipework and its condensate all cross the wall the run wants. A 100mm upstand bedded on silicone is the honest answer where the plaster bows, because it rides what a tall panel exposes. The tile bed comes off before anything is measured.

What the surveys keep coming back to is Edwardian terrace, Victorian terrace, 1930s semi and small modern block. The join count is decided by which of those the room sits in.

Mitred waterfall edge detail on a quartz island
  • Edwardian terrace
  • Victorian terrace
  • 1930s semi
  • small modern block

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Edges are polished on every side that shows, including the top edge of an upstand.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
Borough
Ealing
Postcodes
W5
Covered on
our west London run
Fitted
5–10 working days from template

The place

Why South Ealing is its own job

Because we work across South Ealing rather than one street of it, we know which questions are worth asking up front. South Ealing Road is a busy bus corridor with permit parking either side, and once the side return is built out the terraces have no side access left at all. With the return infilled there is no route to the garden, so the slab either goes in before the bifold doors are hung or it does not go in. You see the drawing before we cut, and if we have read the room wrong, that is the moment to say so, not the morning the fitters arrive.

The work

What worktop splashbacks & upstands involves

What these pieces do is protect the wall where water and heat land: behind the tap, behind the hob, and along the back edge where a cloth never quite reaches. Because the tops are already in, the kitchen stays in use around this stage. It is a return visit rather than another day of the room being unavailable. You end up with a continuous run of stone from the worktop up, cut from the same slab batch so the colour matches where the two pieces meet.

The survey for these pieces is a separate visit with a separate drawing, made after the tops are in and the room has stopped changing. Behind a hob the panel usually rises higher than the rest of the run and stops at the extractor instead of at the units. A rear extension often puts the sink under a window whose sill is barely clear of the surface, and that settles the height before anyone gets a say. Stone behind the hob, not grout.

Waterfall ends See the options

The money

What it costs in South Ealing

Upstands and splashbacks are priced by the metre of finished edge and the number of cut-outs, not by the area of wall they cover. A rooflight over the run means any join is seen under raking light, which is a placement decision with a cost attached. The catalogue starts at £110 per square metre at the plainest end and reaches £550 at the top, supply only, with the same fabrication work sitting behind either choice. Height is a decision with a figure against it.

Victorian and Edwardian terraces

South Ealing in the housing figures

In South Ealing, hardly any of it is newly built, so what the old surface was fixed to matters more than what goes on top. Splashbacks are cut from the same slab run as the tops, so the decision has to be made before fabrication starts. Set out around the sockets as they actually are.

Victorian and Edwardian terraces

What South Ealing asks for

This one is uncommon here and there is no advantage in pretending otherwise. Worktop installation come up far more often. Quoting, fabrication and fitting are identical either way.

Victorian and Edwardian terraces

The shape of the run

Bi-fold or sliding doors at the end of the return mean the run finishes against a frame rather than a wall, and a frame gives nothing to scribe into and no movement to take up. The panel behind a hob is usually the tallest piece in the kitchen, and its height is set by the extractor above it rather than by the wall cupboards either side. Joint placement is a decision, not an accident.

Access

Getting stone into a South Ealing kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

West London patch

South Ealing is covered on our west London run, along with the rest of Ealing.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in South Ealing

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do your own fitters come out to South Ealing?

Yes. South Ealing is on the patch, and the postcodes we work here are W5. It is worked on our west London run, along with the rest of Ealing. Loading exemptions on red routes are narrow, time-limited and heavily camera-enforced, so we plan around them rather than relying on them. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. Nothing this long gets walked while a warden is circling. Both visits happen in your kitchen, the template and the fit, so there is nothing to visit and nothing to collect.

02

What should I expect from worktop splashbacks & upstands in a South Ealing kitchen?

The stairs come down against the wall the addition opens off, so the doorway into the kitchen is offset and the corner beside it is taken by the cupboard under the flight. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. Panels expose a wall; upstands forgive one. Where a run finishes into a reveal, the depth of that reveal is taken at worktop height and nowhere else. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. A breast return is scribed on three edges.

03

How would you get a worktop into a property in South Ealing?

Every internal doorway on the way through is another frame to clear, and internal doors come off their hinges rather than being propped open. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Nothing is leaned anywhere it could slide down. The realistic answer on a main road is an early slot, a spotter on the van and pieces staged in one movement rather than several trips. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. The crate stays on the van until the route in is clear.

04

Is worktop splashbacks & upstands what South Ealing is known for?

Not particularly. It would be easy to say yes and leave it there. What the research on this patch actually lists is worktop installation. That is about what people have here rather than how it gets done. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Extension work runs late far more often than it runs early, and the worktop is close to the last thing in, so the date agreed at the start is rarely the date that happens. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Grout lines are the first thing to fail in a let. Where a family has been living around a building site for months, the finish date carries more weight than any other part of the specification. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Six kitchens, one socket layout, one panel drawing.

05

What moves the number on a quote around here?

A join in a long run wants to sit away from the rooflight, because a seam under direct downlight shows in a way the same seam under a wall cupboard never does. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Corners get their own pieces. Reckon on £110 to £550 per square metre for the material supply only, with templating, fabrication and fitting itemised separately.

06

What state does a South Ealing kitchen have to be in before you template?

Sill height gets settled with the template on site, because it is one of the few dimensions nobody has measured before we arrive. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Set it proud on a subframe and the gap becomes deliberate. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. One owner can take a date next week while the flat below needs three weeks of notice, so several kitchens in one building end up scheduled by the slowest permission. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Two trades, two budgets, one drawing.

07

How do you cut out for an undermounted sink?

We seat and seal the sink and hob on the day; water, waste, gas and electrics are for your plumber and electrician. A sit-on sink and an undermounted one are different cut-outs, so which it is gets settled before the template. Nothing is cut out in the kitchen. Cutting a bowl on site is how worktops get cracked. The wall between the original room and the return usually carries a steel, and the plaster line above it steps, so anything full height behind the run is measured separately from the top. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. The run decides where that joint falls.

08

How much upkeep is a stone worktop?

Bleach and limescale remover harm a polished finish rather than clean it, whichever material is on the units. Granite is porous to varying degrees, so it is sealed when we fit it and topped up over the life of the worktop. Marble is the one people underestimate. It is porous, like granite, and wants sealing. The addition is a brick narrower than the house it hangs off, which leaves a stub of the original rear wall standing square to the run at the doorway end. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. What the wall can take decides how tall the stone goes.

09

What happens between the template and the fitting day?

Nothing is payable in advance of the template. The design and quotation visit comes first. It is free and carries no obligation. On the fitting day floors and door frames are protected, joins clamped flush, sink and hob sealed. The original front door is narrow and the hall is often the only way in, which puts a ceiling on the longest single piece. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Full height needs a flat wall and a finished electrician.

10

What if something breaks during the fit?

The rest of the kitchen still goes in. One damaged piece does not hold up the pieces either side. Most breakages happen on the carry, which is why the route is walked and measured before anything comes off the van. The workmanship guarantee runs 5 years on every kitchen we fit. A pendant light hanging in the middle of a hall ceiling sets the angle a piece can be tilted to, and it is the measurement nobody thinks to take. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. The break goes where a joint reads as deliberate.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“We had a fantastic experience with Worktop WorX from start to finish. The team was professional, friendly, and delivered excellent workmanship. We chose the beautiful Capri White worktop, and it has completely transformed our kitchen with its elegant, high-end look.”
NoniGoogle review · Capri White
★★★★★
“Karem did a fantastic job at installing my antique bronze mirror for my coffee/drinks unit. He was really professional and his communication throughout was clear.”
KalsGoogle review
★★★★★
“We have a new kitchen. Our builder recommended Worktop Worx for our worktop. Now we have an amazing worktop very good price too. Really recommend. They were really good to us. 10/10”
j thomasGoogle review

Next step

Splashbacks and upstands in South Ealing, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.