The housing stock
What we are usually working with in Stamford Hill
Original quarry tile is often still down under two or three later floor coverings, which is why the finished floor height is rarely what anyone expects. A run that has to be scribed twice takes an hour longer than one that does not, and the day is costed with that hour in it. The room is swept and the offcuts leave with us.
Very long runs and heavy daily use push the specification here, so thicker material, fewer joins and a hard-wearing finish matter more than they do anywhere else in the borough. Most houses have front paths and side access though, which makes the carry easier than the parking situation suggests.
The rear extension is frequently original rather than added, which means it is solidly built and just as far out of square as the rest of the house. The day is planned backwards from the hall. The shell has the last word on fitting day.
On these streets the housing is large Victorian house, Edwardian house, 1930s block and post-war estate. None of them is harder than the others; they are awkward in different ways.
Access. Stamford Hill itself is on the A10 red route with no stopping, and the residential streets are permit-only with parking pressure all day.
There is nothing to visit in Stamford Hill. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.