The building, and what it does to the job
Across this patch landlords hold the greater part of the stock. Recent units sit on a developer module. The whole job is one day by design, because an empty kitchen is not earning. Measured after the old surface is off, where it matters.
Boxed soil stacks and ventilation ducts run behind the units, and the boxing depth changes between floor level and worktop height. A full-height panel is bonded across its back and carried on the upstand line rather than left hanging on adhesive alone. A chimney breast breaks the run and the panels follow it.
Stair carries in walk-up blocks decide the cut list, so template with the turn on the half-landing in mind and split at a sink or hob cut-out where possible.
Anything that has to stay accessible, a stopcock, a gas meter, a riser panel, is marked on the template so the stone is cut around it instead of over it. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. Packing the carcasses is part of the replacement.