Islington · N5 N7

Splashbacks and upstands in Arsenal

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Capri White island with a brass bridge tap over the sink, the range cooker and lantern pendants beyond, dressed with eucalyptus

Arsenal kitchens

The kitchens we meet in Arsenal

Ask three neighbours what they paid for splashback and upstand work in Arsenal and you will get three answers, all of them correct for the kitchen they were quoting. Tight Edwardian terraces with small rear kitchens of 2.4-3m sitting a few hundred metres from converted stadium apartments with modern open-plan kitchens, fitted islands and square walls. Two completely different fits, and the terraces rarely have room to change the layout at all. If you are not sure, say so when you get in touch. It is a normal answer and we work with it.

Injected damp courses and re-rendered lower walls leave the bottom metre standing proud of everything above it. Cutting sockets and switch plates into stone is a workshop operation, so the electrics have to be final before the template. Panel joints land over a unit line, never mid-span.

Rear rooms of this date have a wide sash or a pair of garden doors, so a good deal of the wall the run wants is glass. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. Panels expose a wall; upstands forgive one.

What the research records here is Edwardian terrace, converted stadium apartment, Victorian terrace and post-war block. The floor datum is the thing that changes most between them.

Mitred waterfall edge detail on a quartz island
  • Edwardian terrace
  • converted stadium apartment
  • Victorian terrace
  • post-war block

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • The same fitters who install the worktop put the stone on the wall.
  • Wall pieces are priced by the square metre like everything else, from £110 upwards.
  • Edges are polished on every side that shows, including the top edge of an upstand.
Borough
Islington
Postcodes
N5, N7
Covered on
our north London run
Fitted
5–10 working days from template

The place

Why Arsenal is its own job

Fitting stone in Arsenal is a question of what the building will allow, and we would rather find that out early. Matchday road closures and residents-only enforcement make scheduling the real problem, since anything booked on a fixture day is effectively lost. The apartment blocks have controlled underground parking and service lifts that need booking in advance. Book template and fit dates around the fixture list, because a closed road on the day wastes the whole slot and the material comes straight back on the van. Better to know it at the design visit than to find out with a slab standing on the pavement.

The work

What worktop splashbacks & upstands involves

What these pieces do is protect the wall where water and heat land: behind the tap, behind the hob, and along the back edge where a cloth never quite reaches. Because the tops are already in, the kitchen stays in use around this stage. It is a return visit rather than another day of the room being unavailable. You end up with a joint that stays closed. It is siliconed rather than filled hard, so the wall and the surface can move against each other without opening a crack.

The panels are machined at the works and arrive finished, so nothing about them can be persuaded into place with a grinder on the day. Internal corners are butt-jointed rather than mitred, and the vertical is put where the light does not rake across it. In a house this old the wall behind the run has been skimmed over lath in one bay and dot-and-dabbed onto brick in the next, and a tall sheet finds both. A hand's width, or all of it.

Waterfall ends See the options

The money

What it costs in Arsenal

Upstands and splashbacks are priced by the metre of finished edge and the number of cut-outs, not by the area of wall they cover. The island is normally the largest single piece in the kitchen, which makes it the piece that sets the carry and sometimes the price. Supply is £110 to £550 per square metre, and it is the least interesting line on the quote, because the operations listed underneath it are what separate one job from another. The cut-outs are counted, not estimated.

Victorian and Edwardian terraces

What Arsenal asks for

This is not the local speciality and there is no point saying otherwise: worktop replacement and worktop installation is what the housing here actually asks for. It is quoted, cut and fitted exactly the same way regardless.

Victorian and Edwardian terraces

Arsenal in the housing figures

Around here converted and purpose-built flats make up most of the stock. A tall panel has to be carried on edge and cannot be tilted to clear a turn, so it is usually the splashback that will not go in, not the top. Returns and reveals set out at finished size.

Victorian and Edwardian terraces

The shape of the run

Where an overhang is too deep for steel on its own the choice is a leg at the end or a bracket underneath, and a bracket that lands where a knee goes is worse than no bracket at all. The panel behind a hob is usually the tallest piece in the kitchen, and its height is set by the extractor above it rather than by the wall cupboards either side. Scribe to the wall rather than stretch the panel.

Access

Getting stone into an Arsenal kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

North London patch

Arsenal is covered on our north London run, along with the rest of Islington.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Arsenal

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you actually work in Arsenal, or just list it?

Yes. Arsenal is on the patch, and the postcodes we work here are N5, N7. It is worked on our north London run, along with the rest of Islington. An event-day suspension can override a bay that is perfectly usable the rest of the week, so a booked space gets checked again nearer the time. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. A panel carried past a live lane gets a second pair of hands. Both visits happen in your kitchen, the template and the fit, so there is nothing to visit and nothing to collect.

02

What should I expect from worktop splashbacks & upstands in an Arsenal kitchen?

Internal walls are lath on timber studs while the flank walls are brick, so two walls in the same kitchen take a fixing completely differently. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. What the wall can take decides how tall the stone goes. Walls that bow along their length are the normal condition rather than the exception, and a straight-cut back edge will show a shadow gap at one end and touch at the other. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. The panel takes its height off the steel.

03

How would you get a worktop into a property in Arsenal?

Whether the stone can stand on end in the car is the first question, because a lift that takes 2.1m upright takes nothing like that lying flat. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Panels are carried on edge from the tail lift to the wall. Where a road is shut for filming or for works the diversion adds distance to the carry even when parking itself was never the problem. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Nothing this long gets walked while a warden is circling.

04

Is Arsenal really a worktop splashbacks & upstands area?

Honestly, no, though it would be easy to claim otherwise. What the research on this patch actually lists is worktop replacement and worktop installation. That says something about the housing round here, not about the work. Quote, cut and fit are the same here as on any other part of the patch. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Cut with the tops while the batch is open. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Cut as a set, so one can replace another.

05

What moves the number on a quote around here?

A corbel on show under an overhang is a decision about how the piece looks from a stool, so it gets settled alongside the edge profile rather than left to whoever fits it. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Tall panels are what push a job into a second slab. Material runs £110 to £550 per square metre supply only, and templating, fabrication and fitting each get their own line.

06

What state does an Arsenal kitchen have to be in before you template?

A run can measure dead right at both ends and still belly out in the middle, which only appears once the template plots the intermediate points. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. Upstands sit tight because both edges are cut. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. The same building type can arrive as a careful one-off kitchen or as a fast turnaround, and the honest answer is that they are priced differently. Full-height panels need the wall made good first, which is another trade and another timescale. Plastering finishes on somebody else’s timescale.

07

How much upkeep is a stone worktop?

Bleach and limescale remover harm a polished finish rather than clean it, whichever material is on the units. Quartz and sintered stone never need sealing: quartz is non-porous and sintered stone has effectively zero porosity. Marble is the one people underestimate. It is porous, like granite, and wants sealing. Many were built with a solid sub-floor to the rear rooms, so the kitchen floor is concrete and level while the front of the house is suspended timber. A 100mm upstand bedded on silicone is the honest answer where the plaster bows, because it rides what a tall panel exposes. Old walls lean back, and a tall panel shows it.

08

What if something breaks during the fit?

The rest of the kitchen still goes in. One damaged piece does not hold up the pieces either side. Every piece is dry-assembled on the bench before it is loaded, so a fabrication mistake is found in the workshop rather than in your kitchen. Goods lifts and passenger lifts fail differently: one has a rated load that matters, the other has a door aperture that matters more. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. The frame they travel in needs the clearance as well.

09

What happens if my units are not level?

Variation past what packing can take up has to be corrected in the carcasses before we cut, because the template records the units as they stand. Units have to be fitted, fixed and level before templating, and it is better to hear that at the template than on the fitting day. Where a corner is a couple of degrees off, a mitre cut to a theoretical ninety degrees opens on the wall side and there is no closing it afterwards. It decides whether the run gets one continuous piece or a set of separate lengths with a joint at every obstruction. A breast return is scribed on three edges.

10

Is removal and disposal included on an Arsenal job?

Take the old tops off yourself if you would rather, and the quote simply carries one line fewer. What comes out goes by the same route the new stone comes in by, which is why that route is walked before anything is lifted. What changes is the surface. The carcasses underneath stay where they are. Streets near a ground or a venue have restrictions that come and go with the fixture list rather than with the time of day. Full-height panels are the awkward thing to move, light enough to lift and long enough to flex on the way. The crate stays on the van until the route in is clear.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“I am really happy with the work! He fitted my kitchen granite worktop really nicely and got the job done on time, just as promised. He was friendly, professional, and made sure everything was done the way I wanted. Would definitely recommend Karam to anyone looking for a great job!”
esther boaduGoogle review · granite
★★★★★
“Nice work from worktop worx. Highly recommended”
Rasika KumarageGoogle review
★★★★★
“Lovely team, business and quality motivated, prompt delivery with installation. Affordable prices. Wide range of worktops available. High recommendation”
Loreta SkalisieneGoogle review

Next step

Splashbacks and upstands in Arsenal, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.