Barking and Dagenham · IG11

Splashbacks and upstands in Barking

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Induction hob set into an Enzo run below a full-height matching splashback, under the painted mantel canopy

Barking kitchens

The kitchens we meet in Barking

Half of what we get asked about splashback and upstand work in Barking could be answered by a tape measure and ten minutes in the room in question. Older terraces near the town centre have small rear kitchens in the original addition, usually a 2.4-3m single run, while the town-centre towers and newer blocks have open-plan kitchen-living rooms with the units along one wall and a peninsula dividing the space. Landlord and investor work is a real part of the mix here, which means hard-wearing plain quartz and no fuss. Nothing is payable until the template is taken, so finding out where you stand costs you nothing at all.

A hundred and forty years of alterations sit under the current kitchen, and the worktop is what has to sit flat on top of all of it. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Sockets move on paper more easily than in stone.

Wider halls make the carry noticeably easier, and that alone can remove a join that a narrower terrace would have forced into the run. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. What the wall can take decides how tall the stone goes.

What the surveys keep coming back to is Victorian terrace, Edwardian terrace, 1960s block and 2010s-2020s town-centre apartment. The join count is decided by which of those the room sits in.

Mitred waterfall edge detail on a quartz island
  • Victorian terrace
  • Edwardian terrace
  • 1960s block
  • 2010s-2020s town-centre apartment

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.
  • Upstands are small pieces, so they usually come out of the offcut the worktop leaves.
Borough
Barking and Dagenham
Postcodes
IG11
Covered on
our east London run
Fitted
5–10 working days from template

The place

Why Barking is its own job

Half of quoting a kitchen in Barking is understanding the approach to it, which is why the survey is done in person. Dense streets, heavy parking pressure, one-way sections and controlled bays, and for the blocks a lift, a booked delivery window and a security desk to get past. In the blocks we measure the lift internally before quoting a length, a 2.7m piece will not stand up in most of them, so the joint is planned around the lift, not the kitchen. The awkward conversation belongs at your kitchen table at the quote stage, not over a half-fitted worktop.

The work

What worktop splashbacks & upstands involves

The pieces are made to the wall they will stand against, so they are not stock items and cannot be ordered from a size. Each one is drawn for its own stretch of wall. These are templated after the worktop is fitted and settled, never before, so they scribe to the wall the worktop actually meets. Socket and switch positions need to be final first. You end up with a run of stone that reads as one decision rather than two, because the wall and the surface were drawn, machined and fitted as parts of the same job.

An upstand is a low strip of the same material standing on the worktop against the wall, usually about a hundred millimetres; a splashback carries on up to the wall units or the extractor. A window sill sitting lower than the surface settles the argument on its own: the strip runs into the reveal, returns, and the wall above is left alone. In a house this old the wall behind the run has been skimmed over lath in one bay and dot-and-dabbed onto brick in the next, and a tall sheet finds both. A hand's width, or all of it.

Waterfall ends See the options

The money

What it costs in Barking

Upstands and splashbacks are priced by the metre of finished edge and the number of cut-outs, not by the area of wall they cover. Short lengths nest well and waste little, so the material line is usually the kindest part of a galley quote. Nothing about the £110 to £550 supply range changes once the template is done. What the template settles is the piece count and the operations, and that is where the figure firms up. Height is a decision with a figure against it.

Victorian and Edwardian terraces

Barking in the housing figures

Taken across Barking and the roads either side of it, the banding is well below the London middle. A window return or a cooker recess turns one panel into several, and that is a fabrication question. Measured off the fitted top, not the drawing.

Victorian and Edwardian terraces

What Barking asks for

It would be overstating it to call this a speciality on this patch. Worktop replacement and worktop installation are far commoner. None of that changes the survey, the cut list or the fit.

Victorian and Edwardian terraces

The shape of the run

The walkway between the two runs is fixed by the units either side, so any overhang added to one worktop comes straight off the space somebody has to stand in. Where the run carries a join, the panel behind it is broken in the same place, so the two seams line up instead of sitting a hand-width apart. The run decides where that joint falls.

Access

Getting stone into a Barking kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

East London patch

Barking is covered on our east London run.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Barking

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do your own fitters come out to Barking?

Yes. Barking is on the patch, and the postcodes we work here are IG11. It is worked on our east London run, along with the rest of the borough. A shared-use bay allows a paid stay up to a set maximum, and that maximum is routinely shorter than the working day the job needs. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Where the van has to move, the panels come in first. Template and fit both happen at the property, so there is nothing to drive to and nothing to collect.

02

What do the kitchens in Barking do to worktop splashbacks & upstands?

Half-landings mean the back of the house sits at a slightly different level from the front, and a knocked-through kitchen crosses that line. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. Old walls lean back, and a tall panel shows it. Two walls each a degree out give an internal corner two degrees out, and the whole of that error lands in the mitre. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Upstands sit tight because both edges are cut.

03

Do you have trouble getting long pieces into Barking kitchens?

Once a long piece is in on the diagonal there is no room left for anyone else, so it travels up alone and is met on the landing above. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Panels are carried on edge from the tail lift to the wall. Camera enforcement gives nobody the chance to explain, where an officer on foot at least sees a tail lift down and stone coming off it. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. A panel carried past a live lane gets a second pair of hands.

04

Would you call Barking a worktop splashbacks & upstands area?

Not particularly. It would be easy to say yes and leave it there. What the research on this patch actually lists is worktop replacement and worktop installation. That is about what people have here rather than how it gets done. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. The person choosing the worktop is not the person using it, and that shifts the balance from appearance towards running cost. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. The cheap way to make eight kitchens look specified. Where kitchens turn over between tenancies the priority is a surface that survives a decade of being treated as a chopping board. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Wipe-down beats sealed grout on a turnaround.

05

What decides the price of a worktop in Barking?

Both runs are in view at the same time, so the two pieces are taken off the same area of slab and the veining is set to run the same way on each side. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. The panel seam sits over the worktop seam. Material runs £110 to £550 per square metre supply only, and templating, fabrication and fitting each get their own line.

06

What do I need to sort out first?

A scribe has a working limit, and past twenty millimetres or so the back edge starts eating depth the run cannot spare. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. A breast return is scribed on three edges. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. Inventories record the condition of a kitchen at both ends of a tenancy, which is a practical argument for a surface that looks the same in its fifth year as its first. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Two budgets, settled before anything is cut.

07

What happens if a piece is damaged on the fitting day?

The workmanship guarantee runs 5 years on every kitchen we fit. Our own installers do the carry, so there is nobody in the middle to argue with about it. Most breakages happen on the carry, which is why the route is walked and measured before anything comes off the van. Pieces get staged in the ground floor lobby and sent up singly, which needs somewhere to stand them where nobody will walk into them. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. The frame they travel in needs the clearance as well.

08

Who decides where a join falls?

A mitred join at a corner is a different job from a butt join along a run, and they are not priced the same. A finished join is typically two to three millimetres, colour-matched and sanded flush. Each join is an item on the drawing, so the layout and the figure move together. A galley closed at one end takes a short return across the top, and that little piece carries the same edge work, the same handling and nearly the same cost as a full length. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. External corners are mitred, not butted.

09

What if the stone cannot get up the stairs in a Barking flat?

A join forced by the route still sits over a gable, so it is no poorer a join for that. The carry route is measured before anything is cut, so a piece that will not make the turn is split at the drawing stage rather than discovered on the day. The step and the gap at the car threshold catch a trolley wheel, so the piece comes off the trolley and goes in by hand. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. A vertical break is easier to live with than a cracked panel.

10

Do most Barking kitchens take upstands or full-height splashbacks?

A full-height piece shows a wall that is out more than an upstand does, over the extra height. The joint between splashback and worktop is siliconed, never grouted, so it can move a little without cracking. Upstand or splashback, the stone is cut from the same slab run as the worktop, at the same time, so the batch actually matches. The original larder or store cupboard usually survives in a corner, and that alcove is deeper than the units and squarer than the walls around it. A 100mm upstand bedded on silicone is the honest answer where the plaster bows, because it rides what a tall panel exposes. Sockets in a stud wall move more easily than sockets in brick.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Karem did an excellent job on my kitchen. He was professional, reliable, and paid great attention to detail. The finish looks amazing and has completely transformed my kitchen. Thank you! Would highly recommend his work!”
Catalina RaduGoogle review
★★★★★
“Excellent work and highly recommend. Very professional and did an outstanding job with my worktop. Karem responded very quickly and swiftly, top guy!”
Faisal KGoogle review
★★★★★
“Perfect service,the best on this job”
Kleant IstrefiGoogle review

Next step

Splashbacks and upstands in Barking, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.