Greenwich · SE9

Splashbacks and upstands in Coldharbour

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

Coldharbour kitchens

The kitchens we meet in Coldharbour

The part of splashback and upstand work in Coldharbour that surprises people is how much of it is decided before anyone touches a slab. Postwar estate housing with small kitchens planned around a fixed sink under the window and a boiler cupboard; runs are 2m to 2.6m and worktops are usually replaced piecemeal rather than as part of a redesign. You do not have to work out which of those you have. We will look at it with you when we come to Coldharbour.

There is nearly always a boxed soil stack or a service riser in a corner of the run, and it is rarely mentioned at enquiry. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. A return into a reveal is its own scribed piece.

Whole streets went up to two or three plans, so the house next door has the same kitchen and forty years of extensions have made none of them measure the same. The rough band left where tiles took the plaster with them is covered by the upstand rather than made good twice. Nothing goes on a wall that will not hold it.

Most of what we quote on here is postwar LCC estate, 1950s-60s maisonette block and 1970s terrace. The age of the shell tells us more than the age of the kitchen does.

Worktop join finished flush against a wall
  • postwar LCC estate
  • 1950s-60s maisonette block
  • 1970s terrace

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Upstands are small pieces, so they usually come out of the offcut the worktop leaves.
  • Dekton and sintered stone are stable in heat and daylight, which is why they suit a wall behind a hob.
  • A wide wall takes more than one piece, because slab width is finite.
Borough
Greenwich
Postcodes
SE9
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Coldharbour is its own job

The part of a Coldharbour job that goes wrong is almost never the stone, it is what nobody looked at first. Estate layout with parking courts and rear footpaths, and several maisonette blocks reached by an external stair with a tight turn at the top. Those stair turns on the maisonettes cap the piece length, measure the turn, not just the doorway. Have a look at the itemised quote and you can see what the building is costing and what the stone is costing.

The work

What worktop splashbacks & upstands involves

The choice is not all or nothing. A kitchen can take slim upstands along the run and a taller piece behind the hob alone, and the two are priced as separate items. The wall is read for how flat and how plumb it is before anything is drawn, because a panel that stands off a bowed wall at one end shows it along its whole length. You end up with a wall that gets wiped down in the same pass as the worktop, because it is the same material carrying on upward rather than a different one starting.

The panels are machined at the works and arrive finished, so nothing about them can be persuaded into place with a grinder on the day. A window sill sitting lower than the surface settles the argument on its own: the strip runs into the reveal, returns, and the wall above is left alone. The kitchens are narrow and the cooker nearly always backs onto the party wall, which puts the tallest piece in the tightest part of the room. One sheet, two seams, nothing to reseal.

Corners and joins See the options

The money

What it costs in Coldharbour

It is priced as its own item so you can see what removing the grout line actually costs before deciding. In a galley the runs are short and the cut-outs are close together, so the fixed operations carry more of the total than the stone does. If you are holding two quotes, the £110 to £550 supply rate is the part they will agree on. Compare the join count, the edge profile and what the fitting line covers. Priced by the edge and the openings, not the wall.

ex-local-authority flats and estates

Coldharbour in the housing figures

Around Coldharbour, the housing predates the recent building boom almost entirely, and the units in it usually do too. Ordered later, from a different batch, the match is not reliable where the pieces meet. Same slab run, same batch.

ex-local-authority flats and estates

What Coldharbour asks for

Consent for the work sits with the freeholder or the managing body, and getting it in writing first avoids a crew arriving to a locked door. Full-height panels need the wall made good first, which is another trade and another timescale. The wall has to be ready.

This is not the local speciality and there is no point saying otherwise: worktop replacement and worktop fabrication is what the housing here actually asks for. It is quoted, cut and fitted exactly the same way regardless.

Access

Getting stone into a Coldharbour kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Coldharbour is covered on our south east London run, along with the rest of Greenwich.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Coldharbour

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do your own fitters come out to Coldharbour?

Yes. Coldharbour is on the patch, and the postcodes we work here are SE9. It is worked on our south east London run, along with the rest of Greenwich. Unrestricted kerbside is straightforward as long as the space in front of the property is actually clear when the van arrives. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Standing a panel on the pavement is the last resort. The measuring and the fitting are both done at the property, so there is nothing to visit or collect.

02

Is there anything about Coldharbour buildings that catches worktop splashbacks & upstands out?

Ceilings sit at about two point three metres and the head of the window is close under them, so a unit over the window has very little wall to hold onto. That suits a full-height piece, because a large flat panel bonded across its back is more stable on concrete than a run of small tiles ever was. The age of the plaster decides the fixing, not the finish. Boxing built in plasterboard on a light frame will take no useful fixing, so nothing bears on it and the stone is carried off the carcasses either side. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Nothing gets hidden behind a full-height panel.

03

What do you check about the route into a Coldharbour property?

A piece carried on edge up a flight has to clear the ceiling above the stairs as well as the walls either side of it. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. Break positions are chosen for the carry. On a street with no restrictions the constraint is other residents rather than a warden, so it is worth putting a cone or a car out early. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Handling is where these pieces get damaged.

04

Do you get much worktop splashbacks & upstands work in Coldharbour?

Not especially, and pretending otherwise would be simple enough. What the research on this patch actually lists is worktop replacement and worktop fabrication. It is a fact about the local housing rather than about the work. The job is quoted, cut and fitted the same way wherever on the patch it lands. A worktop replacement between tenancies is a single-day job by design, because the flat is not earning while it is empty. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Cut now, stored for the next void. Agents book this work at short notice, because the void only becomes a real date once the outgoing tenant confirms they are going. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Same batch, or the join will say so.

05

Why do two Coldharbour kitchens the same size price differently?

A window at one end and a doorway at the other means one end of the run is lit from behind and the other is interrupted, so the two ends of the same length behave differently. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Long walls break where the worktop breaks. Material alone is £110 to £550 per square metre, and templating, fabrication and fitting are never folded into that figure.

06

What has to be finished before you can template?

A stack boxed diagonally across a corner leaves a triangle of dead space, and the top is cut to that triangle rather than to a square return. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. The reveal decides where the stone dies. Any surface trunking or conduit has to be rerouted or accepted and boxed before templating, because the stone cannot be scribed around a live conduit on site. These kitchens tend to be compact and reasonably square, so the fixed template, fabrication and fitting lines are a larger share of the total than the stone is. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Upstand height taken from the specification.

07

What is the order of events on a Coldharbour kitchen?

The fitting itself is one visit: a plain run is a morning, an island with splashbacks takes most of the day. The template produces a drawing, and the workshop cuts to that drawing once you agree it. A template on a normal kitchen takes two to three hours in the room. The carry is the constraint: a single stair with tight half-landings, or deck access with a long walk from the lift. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Panel thickness changes what the sockets need behind them.

08

What if the units in a Coldharbour kitchen have moved since they went in?

Level is checked at the template, which is the point of measuring in the room rather than off a drawing. Levelling belongs in the carcasses, on their own legs and packers. Variation past what packing can take up has to be corrected in the carcasses before we cut, because the template records the units as they stand. Where the boxing stands proud of the finished wall the upstand behind it has to be broken into separate lengths, because one piece cannot pass it. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. A bowed wall shows on a panel and hides under an upstand.

09

Is taking the old top off part of the job?

Disposal means it goes in the van, not into the garden to wait for a collection. Old tops are screwed or glued from underneath, so the drawer boxes come out before the worktop does. The units below stay exactly as they are; only the surface is replaced. A free-parking street with cars both sides can still leave the van forty metres away, and that distance is carry, not driving. Full-height panels are the awkward thing to move, light enough to lift and long enough to flex on the way. One trip is always better than three.

10

Does my sink have to be on site before you template in Coldharbour?

A sit-on sink and an undermounted one are different cut-outs, so which it is gets settled before the template. A Belfast or butler sink has to be installed and at its final height before the template, because the stone is cut to sit on it. The two runs are rarely the same length, and the shorter one often carries the sink, which puts the cut-outs in the piece with the least material to spare. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Upstands follow the return round the corner.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“We recently had the Arctic Starburst worktop installed by Worktop WorX and it looks amazing. The subtle sparkle really catches the light and gives the kitchen a clean, modern feel. The Arctic Starburst surface feels high quality, durable, and is easy to keep clean. The finish and installation from Worktop WorX were spot on. Really happy with the result and would definitely recommend both Arctic Starburst and Worktop WorX to anyone upgrading their kitchen.”
Han LeeGoogle review · Arctic Starburst
★★★★★
“Great work, super helpful team. I'd definitely recommend!”
Andreea TanaseGoogle review
★★★★★
“Great experience from this company, I am happy with the materials, fitting and the team.”
Rrahim BratiGoogle review

Next step

Splashbacks and upstands in Coldharbour, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.