The place
Why Covent Garden is its own job
What makes Covent Garden its own case is not the stone, it is getting to it and what it has to sit against. Pedestrianised streets, timed vehicle bans, Congestion Charge and delivery windows that generally mean an early morning slot. The last stretch is almost always on foot from a loading point, then a narrow street door and steep stairs above a shop or restaurant. Plan for a barrow carry of fifty metres or more and pieces short enough to handle without swinging them, because the walk-in rather than the kitchen sets the maximum slab length here. Three to seven working days sit between the template and the fit, and everything difficult gets solved in that gap.

