The building, and what it does to the job
Across this patch the twenties and thirties barely register, so the standard semi galley is not the shape we are fitting. The awkward moment is nearly always the same one on this plan, so it is dealt with early. Fitted to the survey, checked against the room.
These kitchens are full of boxed soil stacks, gas risers and heating pipework, and the boxing usually stops short of the ceiling. The boxing round the risers is measured again with the old top off, because the last fit was often built around it. What the last fitter did to the wall shows up on strip-out.
Conversion flats above the shops have springy joisted floors - check deflection under the island position before committing to a 20mm slab.
