Tower Hamlets · E14

Splashbacks and upstands in Cubitt Town

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Capri White island with a brass bridge tap over the sink, the range cooker and lantern pendants beyond, dressed with eucalyptus

Cubitt Town kitchens

The kitchens we meet in Cubitt Town

Nothing about splashback and upstand work in Cubitt Town is decided by us alone, since the units, the walls and the way you get through the door all get a say. Family houses here have a ground-floor kitchen at the rear with a garden door, usually a U or L of 3m to 4m total run, and a fair number have been extended sideways for a small island. Riverside apartments have compact kitchens with the run interrupted by a balcony door. Send a few photographs of the run and we will tell you which of those you are dealing with before we come out to Cubitt Town.

Everything arrives through one controlled entrance with a booking sheet, and a delivery that misses its slot waits. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Full height needs a flat wall and a finished electrician.

The kitchen usually sits along the internal spine of the plan with the glazing at the far end, so the run itself has no window and no daylight on it. The plasterboard is genuinely flat here, so a full-height splashback sits well and a slim upstand looks almost redundant, but the sockets are the problem, because they are set out to the developer's original kitchen and often land at odd heights or right on a joint line. Old plaster rarely gives you a flat metre.

The archetypes on this patch are 1980s-90s riverside terrace and townhouse, post-war estate and recent riverside apartment. They are not interchangeable, and a worktop finds the differences quickly.

Mitred waterfall edge detail on a quartz island
  • 1980s-90s riverside terrace and townhouse
  • post-war estate
  • recent riverside apartment

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Edges are polished on every side that shows, including the top edge of an upstand.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
Borough
Tower Hamlets
Postcodes
E14
Covered on
our east London run
Fitted
5–10 working days from template

The place

Why Cubitt Town is its own job

Having worked in Cubitt Town regularly, we already know what to check before a template is booked and a slab is ordered. This is the easiest part of the peninsula for a van, with off-street parking and driveways on many of the 1980s houses and level access to the front door. Riverside blocks are the exception, with gated courtyards and lifts sized for furniture rather than 3m slabs. Houses here allow a single-piece run straight through the front door, which is worth taking advantage of instead of defaulting to a joint. The point of the free visit is that we see the Cubitt Town job for ourselves rather than guessing at it from an email.

The work

What worktop splashbacks & upstands involves

The work carries the same five year workmanship guarantee as the worktop and is done by the same installers, which is why it is booked as part of the same job. Because the tops are already in, the kitchen stays in use around this stage. It is a return visit rather than another day of the room being unavailable. You end up with a wall that gets wiped down in the same pass as the worktop, because it is the same material carrying on upward rather than a different one starting.

Splashbacks and upstands are the part of the job that takes the grout line out of the kitchen, which is what most people are really asking for when they ask about stone behind the hob. Openings in a tall sheet are given a radiused internal corner rather than a square one, because a sharp internal corner in thin material is where a crack begins. The hob is usually a small induction unit on a stud partition, which makes a tall sheet a question of wiping down rather than of heat. Stone behind the hob, not grout.

Waterfall ends See the options

The money

What it costs in Cubitt Town

A full-height splashback costs more than an upstand for the obvious reason and one less obvious one: there is more to scribe and more to machine around. The island is normally the largest single piece in the kitchen, which makes it the piece that sets the carry and sometimes the price. Multiplying your worktop area by something between £110 and £550 gives you a material bill rather than a job cost, and the two are far enough apart to be worth keeping separate. Height is a decision with a figure against it.

Victorian and Edwardian terraces

What Cubitt Town asks for

The research on this patch does not put this among the three commonest jobs. Worktop installation do. That changes how often we are here, not how the work is done.

Victorian and Edwardian terraces

Cubitt Town in the housing figures

Across this patch houses are the minority and blocks are the norm. The rooms therefore start closer to true than in most of London. Where the route is tight the panel is broken at a natural vertical joint rather than forced through in one. The stone follows the wall, not the other way round.

Victorian and Edwardian terraces

The carry, and what it rules out

Everything comes through the front door and down the hall, so the tightest point on the route is usually the newel post at the foot of the stairs. Panels travel on edge in a frame, and the frame needs the same clearance the finished piece does. Break positions are chosen for the carry.

Access

Getting stone into a Cubitt Town kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

East London patch

Cubitt Town is covered on our east London run, along with the rest of Tower Hamlets.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Cubitt Town

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you actually work in Cubitt Town, or just list it?

Yes. Cubitt Town is on the patch, and the postcodes we work here are E14. It is worked on our east London run, along with the rest of Tower Hamlets. Where the van cannot turn on the plot it has to arrive already facing the right way, so the approach along the street is part of the plan. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. A short bay slot is when the tall pieces get damaged. There is nothing to drive to and nothing to pick up, because both visits are to the property itself.

02

What do the kitchens in Cubitt Town do to worktop splashbacks & upstands?

These flats are built with a floating floor over a concrete slab for acoustic reasons, and it deflects slightly under the weight of a stone island. Every socket, switch and any USB point has to be cut out of the stone to the actual measured position, so the template has to be taken with the faceplates off and the back boxes visible. The wall gets made good first or the gap shows. Stud centres are almost never where the brackets would like to be, so fixing positions get set from the framing and the stone is designed to suit. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Nothing gets hidden behind a full-height panel.

03

Do you have trouble getting long pieces into Cubitt Town kitchens?

A narrow entrance hall with a turn into the back of the house caps the longest piece we can physically get in, whatever the run itself measures. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. A tall panel cannot be tilted to clear a turn, so it is sized not to need to. A drive behind an electric gate depends on somebody being in to open it and on the gate staying open while the load comes off. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Kerb to kitchen is measured before the panels are unstrapped.

04

Do you get much worktop splashbacks & upstands work in Cubitt Town?

Honestly, no, though it would be easy to claim otherwise. What the research on this patch actually lists is worktop installation. That says something about the housing round here, not about the work. Quote, cut and fit are the same here as on any other part of the patch. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Six kitchens, one socket layout, one panel drawing. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. The annexe gets the same panel as the main run.

05

What decides the price of a worktop in Cubitt Town?

Power and waste come up through the floor, and where they surface decides which cabinet can hold a sink and which one cannot. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. The panel seam sits over the worktop seam. Material runs £110 to £550 per square metre supply only, and templating, fabrication and fitting each get their own line.

06

What do I need to sort out first?

A partition that gives when you lean on it will give under someone sitting at an overhang, and a bonded mitre nearby is where that movement shows first. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. The reveal decides where the stone dies. Any socket you intend to move must be moved and re-plastered before templating, because a cut-out in the wrong place means a new piece of stone. Owner-occupied kitchens are usually being done once, which is why the edge profile, the vein direction and where a join falls are worth the conversation. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Low maintenance is the honest choice for a let.

07

Will you fit stone onto units that are not level?

A long top on units that were shimmed once and never checked is the commonest version of this, and it is cheap to fix beforehand. Levelling belongs in the carcasses, on their own legs and packers. Level is checked at the template, which is the point of measuring in the room rather than off a drawing. Where a peninsula returns into a stud wall the load has to sit on the units, with the wall doing no more than steadying it. It decides whether the run gets one continuous piece or a set of separate lengths with a joint at every obstruction. A bowed wall shows on a panel and hides under an upstand.

08

Does a stone worktop need sealing?

Granite is porous to varying degrees, so it is sealed when we fit it and topped up over the life of the worktop. Upkeep is settled when the slab is chosen, since it belongs to the material rather than the fabrication. Topping a seal up is a wipe-on job with a cloth. A balcony door is the only other opening in the flat and it leads nowhere useful, so everything comes in through the front door. The plasterboard is flat enough for a full-height panel; it is the socket positions that cause the trouble. Solid plaster on brick takes a panel; a hollow wall wants thought.

09

Can the sink be undermounted rather than sat on top?

A piece with a bowl and a hob cut into it is the fragile one, and it is handled accordingly. Undermount bowls are cut and polished in the workshop and dry-fitted to the stone on the bench before anything is loaded. A hob cut-out and the floor penetration feeding it have to land over the same cabinet, and where they do not it is the stone that gets redrawn rather than the pipework. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. External corners are mitred, not butted.

10

What if something breaks during the fit?

A remade piece is cut from the same slab run wherever the slab allows, because a replacement from another batch will not match across a join. Floors and units are protected before anything comes through the door. Most breakages happen on the carry, which is why the route is walked and measured before anything comes off the van. Door width, hall width and the diagonal at the turn are three separate measurements, and it is the diagonal that catches people out. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. Panels are carried on edge from the tail lift to the wall.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“We had a fantastic experience with Worktop WorX from start to finish. The team was professional, friendly, and delivered excellent workmanship. We chose the beautiful Capri White worktop, and it has completely transformed our kitchen with its elegant, high-end look.”
NoniGoogle review · Capri White
★★★★★
“Karem did a fantastic job at installing my antique bronze mirror for my coffee/drinks unit. He was really professional and his communication throughout was clear.”
KalsGoogle review
★★★★★
“We have a new kitchen. Our builder recommended Worktop Worx for our worktop. Now we have an amazing worktop very good price too. Really recommend. They were really good to us. 10/10”
j thomasGoogle review

Next step

Splashbacks and upstands in Cubitt Town, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.