The building, and what it does to the job
Across this patch the council tax banding sits at the bottom of the London range. The inter-war kitchen repeats street to street. It decides how many hands the day needs, which is the part people find out late. One team from the van to the seal.
Most of these are cross-wall construction, so the two side walls carry the building and the front and back are infill, and only two of the four take real weight. Unit legs are reset where they have bottomed out on the slab, since the old top hid the difference and stone will not. Nothing goes back on carcasses the building has pulled out of square.
Most Dagenham jobs are about maximising continuous run length in a small room, so we plan the sink and hob positions to leave one usable stretch of at least 900mm.
