Skip to content

Camden · NW5

Splashbacks and upstands in Dartmouth Park

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

Dartmouth Park kitchens

What the kitchens here are actually like

late Victorian terraceVictorian semi-detached villaEdwardian house

A hundred and forty years of alterations sit under the current kitchen, and the worktop is what has to sit flat on top of all of it. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. Siliconed to the top, never grouted.

Substantially whole houses in owner occupation, so the classic job is a rear or side-return extension with a 4m run along one wall and a true island of 2.4-3m.

Kitchens sit across the back of the ground floor with doors to a long garden, and clients here nearly always want a matching island top rather than a peninsula. Steep tree-lined streets with permit bays both sides and no room to double park, and the gradient matters when you are walking a slab on an A-frame. Front doors are up a short flight with a long straight hall to the rear, so it is the kerb-to-door step that catches people out rather than the internal run.

The back addition is a narrow two-storey outrigger with a single external wall, and the kitchen galley runs the length of it. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. Cut from the same slab run as the tops.

What turns up on the job sheets is late Victorian terrace, Victorian semi-detached villa and Edwardian house. The differences between them show up at template, not at enquiry.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered on our central and north London run. Fitted 3–7 working days from template.

Victorian and Edwardian terraces

What gets asked for here

This is not the local speciality and there is no point saying otherwise: worktop templating, worktop installation and worktop design & quotation is what the housing here actually asks for. It is quoted, cut and fitted exactly the same way regardless.

Victorian and Edwardian terraces

The building, and what it does to the job

The island is usually the biggest single piece of the job, so book the extra pair of hands and check the extension floor is level first, because new screed over old joist lines rarely is.

Victorian and Edwardian terraces

The shape of the run

Galley runs are usually short enough to come out of a single slab, so the material band you choose does more to the total than the room shape does. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. Corners get their own pieces.

Access

Getting stone into a Dartmouth Park kitchen

Steep tree-lined streets with permit bays both sides and no room to double park, and the gradient matters when you are walking a slab on an A-frame. Front doors are up a short flight with a long straight hall to the rear, so it is the kerb-to-door step that catches people out rather than the internal run.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

central and north London patch

Dartmouth Park is covered on our central and north London run, along with the rest of Camden.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Dartmouth Park

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Is Dartmouth Park on your patch?

Yes. Dartmouth Park is on the patch, and the postcodes we work here are NW5. It is worked on our central and north London run, along with the rest of Camden. Enforcement zones rarely accept a trade van unloading stone as an exemption, so this gets sorted before the date is confirmed rather than argued about afterwards. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Handling is where these pieces get damaged. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Why would worktop splashbacks & upstands in Dartmouth Park be any different from anywhere else?

The back addition is a narrow two-storey outrigger with a single external wall, and the kitchen galley runs the length of it. A 100mm upstand bedded on silicone is the honest answer where the plaster bows, because it rides what a tall panel exposes. Cut from the same slab run as the tops. The island is usually the biggest single piece of the job, so book the extra pair of hands and check the extension floor is level first, because new screed over old joist lines rarely is.

How would you get a worktop into a property in Dartmouth Park?

Steep tree-lined streets with permit bays both sides and no room to double park, and the gradient matters when you are walking a slab on an A-frame. Front doors are up a short flight with a long straight hall to the rear, so it is the kerb-to-door step that catches people out rather than the internal run. Door width, hall width and the diagonal at the turn are three separate measurements, and it is the diagonal that catches people out. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. It decides panel size before anything is cut.

Is Dartmouth Park really a worktop splashbacks & upstands area?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop templating, worktop installation and worktop design & quotation. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Siliconed to the worktop, never grouted. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Same batch, same run, same day.

What moves the number on a quote around here?

Galley runs are usually short enough to come out of a single slab, so the material band you choose does more to the total than the room shape does. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. Corners get their own pieces. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What needs to be ready before you come to Dartmouth Park?

Legs bottoming out on hard concrete or an uneven screed mean the tops of the carcasses are not one plane, and that is picked up at template rather than on fitting day. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Make the wall good first, or accept the detail. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. An owner living in the house makes the decisions and lives with them, so the specification tends to go towards the material rather than towards the lowest total. Full-height panels need the wall made good first, which is another trade and another timescale. Decided before fabrication, not after.

Next step

Splashbacks and upstands in Dartmouth Park, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489