Richmond upon Thames · SW14

Splashbacks and upstands in East Sheen

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Alaska peninsula with four grey velvet stools tucked under the overhang, looking through to the utility run

East Sheen kitchens

The kitchens we meet in East Sheen

The splashback jobs we do in East Sheen follow the same process every time, and it is the kitchen rather than the process that decides how the day actually goes. Large Edwardian and interwar family houses where full-width rear extensions are the norm - a 4m run on the flank, a 2.4m island with a hob and downdraft or a ceiling extract, a boot room off the side return and a utility with its own shorter top. Ring us with the rough dimensions and we will tell you what is likely, then confirm it properly at the East Sheen survey.

A side passage and a back door mean the stone rarely has to come through the house, which changes the job more than most people expect. Cutting sockets and switch plates into stone is a workshop operation, so the electrics have to be final before the template. A bowed wall gets measured at three heights first.

A detached house of this age has a drive, a side path and a back door, so access is rarely the constraint and the design can follow the room. Behind a hob the panel runs to the underside of the extractor, and that height is settled on site rather than on the plan. Nothing goes on a wall that will not hold it.

On these streets the housing is Edwardian double-fronted house, 1930s semi, 1930s detached and postwar flats. The wall build-up is different in each, and the scribe follows the wall.

Polished stone edge profile close up
  • Edwardian double-fronted house
  • 1930s semi
  • 1930s detached
  • postwar flats

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Dekton and sintered stone are stable in heat and daylight, which is why they suit a wall behind a hob.
  • A wide wall takes more than one piece, because slab width is finite.
  • The same fitters who install the worktop put the stone on the wall.
Borough
Richmond upon Thames
Postcodes
SW14
Covered on
our south west London run
Fitted
5–10 working days from template

The place

Why East Sheen is its own job

The reason we survey rather than work from a drawing is that a drawing tells you nothing about getting into a kitchen in East Sheen. Wide roads with front driveways and dropped kerbs at most houses, though the Upper Richmond Road side is a heavy through route; side passages are generally wide enough to bring stone round to a rear door. Rear glazing on three sides means low sun straight down the run, so a honed or textured finish is worth pushing over a polished black. That is a survey question, not a fitting-day question, and we treat it as one.

The work

What worktop splashbacks & upstands involves

Splashbacks and upstands put the same stone on the wall behind your worktop instead of tiles, which takes the grout line out of the kitchen. Nothing is trimmed on site. The openings and the returns are machined at the workshop, so the drawing has to carry every dimension the wall is going to demand of the piece. You end up with sockets and switches sitting in openings machined for them, which is the difference between a panel made for the wall and one cut to clear whatever was on it.

The panels are machined at the works and arrive finished, so nothing about them can be persuaded into place with a grinder on the day. Panels are offered up dry before any adhesive goes near them, and the scribe comes off the piece, never off the plaster. The old larder wall in these houses is a single skin with a bow through it, and a hand's width of stone hides what a tall sheet would advertise. A hand's width, or all of it.

Edge profiles See the options

The money

What it costs in East Sheen

Cutting from the same slab run as the worktop is what keeps the colour matched, and ordering the two together is cheaper than ordering them apart. Overhangs, a waterfall end and seating all add machining, and an island is where those decisions cluster. The supply rate of £110 to £550 per square metre reads the same for a small kitchen and a large one. Everything that makes them different jobs appears further down the quote. Height is a decision with a figure against it.

Victorian and Edwardian terraces

The building, and what it does to the job

A boxed soil stack or service riser in the corner of a run eats into the worktop depth and has to be scribed around rather than cut square. A mitred external return around it has to come from the same position in the slab, or the pattern visibly steps at the corner. A bowed wall shows on a panel and hides under an upstand.

Victorian and Edwardian terraces

East Sheen in the housing figures

On the East Sheen streets we cover, the housing predates the recent building boom almost entirely, and the units in it usually do too. A window return or a cooker recess turns one panel into several, and that is a fabrication question. Returns and reveals set out at finished size.

Victorian and Edwardian terraces

What East Sheen asks for

Honestly, this is not what we do most on this patch. Worktop installation come up more often. That is a statement about the local housing rather than about the work, and nothing about how it is quoted, cut or fitted changes because of it.

Access

Getting stone into an East Sheen kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South west London patch

East Sheen is covered on our south west London run, along with the rest of Richmond upon Thames.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in East Sheen

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Is East Sheen far enough out to be a problem for you?

Yes. East Sheen is on the patch, and the postcodes we work here are SW14. It is worked on our south west London run, along with the rest of Richmond upon Thames. A drive behind an electric gate depends on somebody being in to open it and on the gate staying open while the load comes off. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Kerb to kitchen is measured before the panels are unstrapped. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

02

Is there anything about East Sheen buildings that catches worktop splashbacks & upstands out?

The kitchen is usually a rear room extended into the garden, with the original external wall now standing inside the run. These kitchens are nearly always retiled at least twice, and stripping the old tiles takes the bottom course of plaster with it because the original laminate top ran underneath the tiles rather than up to them. The age of the plaster decides the fixing, not the finish. Boxing is rarely the same depth at worktop height as it is at floor level, so measuring it low down is the usual reason a top will not sit back. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Mitred returns come from one place in the slab.

03

What do you check about the route into an East Sheen property?

A side gate and a back door mean the stone never goes through the house at all, which keeps the dust and most of the risk outside. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. A panel that would need turning indoors is turned outside instead. Some drives are wide enough for the van and too short for the tail lift, because the tail lift needs its own clear metre behind the vehicle. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. Wind on an open street matters more than the walk does.

04

Would you call East Sheen a worktop splashbacks & upstands area?

Not to any real extent, and it would be easy to imply it was. What the research on this patch actually lists is worktop installation. It describes the kitchens on this patch, not the work that goes into them. Same quoting, same cutting, same fitting as anywhere else on the patch. Where a family has been living around a building site for months, the finish date carries more weight than any other part of the specification. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. The annexe gets the same panel as the main run. An open-plan extension puts the worktop in the middle of the living space, so it is looked at from the sofa as well as worked on. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. A repeated spec needs a repeatable splashback.

05

Why do two East Sheen kitchens the same size price differently?

A downdraught extractor takes a long slot out of the middle of the piece and a motor housing out of the cabinet below it, so what sits under the top is settled before anything is cut. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. External corners are mitred, not butted. Stone is £110 to £550 per square metre supply only, and the templating, the fabrication and the fitting each carry their own line.

06

What has to be finished before you can template?

Anything that has to stay accessible, a stopcock, a gas meter, a riser panel, is marked on the template so the stone is cut around it instead of over it. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. The pier takes a joint against it, not across it. The old tiling must be off and the wall made good and dry before templating, not on fitting day. A quartz sample left on the counter for a week under the actual kitchen lights settles more arguments than any showroom, and an owner is the only person in a position to do that. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Fitted with the tops if it was decided with them.

07

Can I have grooves instead of a separate drainer in East Sheen?

Machining is permanent. If a later kitchen moves the sink, the grooves stay where they were cut. The alternative stands on the surface, so the choice is losing worktop permanently or only while you are draining. Where there is no room for a separate drainer, grooves are usually what gets specified instead. Solid brick with a sand and cement render is firm to work against and reliably out of plumb across the length of a run. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Full height needs a flat wall and a finished electrician.

08

Will I have to look after it? What does an East Sheen worktop need?

The bead where the sink and hob meet the stone is siliconed rather than sealed, and wants watching. Day to day all three want soap and water; abrasive creams and scouring pads are what dull a polished surface. A seal is not waterproofing. It only buys time to wipe a spill up. Houses of this period came with generous garages and utility rooms, so a second short run of stone is often part of the same job. That leaves a ragged band right where the upstand has to sit, which is fine for a 100mm upstand that covers it, but a full-height splashback needs the wall made good first or it will rock on the high spots. The wall makes that decision, not the brochure.

09

What happens to the worktop that comes off?

If you want the old top kept for a garage or a utility, say so and it stays on site. The sink and hob are lifted out with the old top and kept aside if you are reusing them. Tiling bonded to the wall behind usually comes away with the old top, so that wall is agreed beforehand. Where the drive falls away from the house the trolley wants to run, and where it climbs the same load has to be pushed the whole way up. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Standing a panel on the pavement is the last resort.

10

Upstands or a full-height splashback?

Stone up a wall is heavier than tile and bonded rather than hung, so the wall has to be sound. What decides between them is usually the wall: what it is built of, how flat it is, and where the sockets ended up. Solid brick with a render coat is firm to work against and out of plumb, so the scribe at worktop height is different from the one at plinth level. The ragged band left when old tiles and laminate come off together is what usually decides upstand over full height. Cut from the same slab run as the tops.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Nice work from worktop worx. Highly recommended”
Rasika KumarageGoogle review
★★★★★
“Lovely team, business and quality motivated, prompt delivery with installation. Affordable prices. Wide range of worktops available. High recommendation”
Loreta SkalisieneGoogle review
★★★★★
“Great service. Super quick and easy communication. I love my new worktop 🥹🥹”
Sara ArghirGoogle review

Next step

Splashbacks and upstands in East Sheen, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.