Skip to content

Newham · E20

Splashbacks and upstands in East Village

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

East Village kitchens

What the kitchens here are actually like

2012 athletes' village apartmentpost-2015 infill apartment block

The room is square, the walls are plumb and the floor is flat, so almost every complication in the job belongs to the building rather than the kitchen. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. The wall decides, not the brochure.

Every flat came with the same developer kitchen: a single-wall run of roughly 2.7m to 3.2m in an open living space, wall units to one side and a tall appliance stack, with no island.

Almost all work here is replacing the original top like for like in a fully fitted kitchen, so cabinets stay and the stone has to match the existing sink and hob positions. Deliveries and lift use must be booked with the estate management team, usually with a fixed window and a lift protection requirement. The estate is car-free in the residential courtyards with a private management company controlling access, so vehicles use designated service bays and the last stretch is a trolley run across podium paving. Because the kitchens are identical across blocks, the layouts repeat, but the estate access rules mean the booking has to be made before the template is even scheduled.

Dot-and-dab plasterboard bellies at a taped internal angle, so the run picks up a few millimetres over the last 300mm and a plan-angle mitre will not close. The plasterboard is genuinely flat here, so a full-height splashback sits well and a slim upstand looks almost redundant, but the sockets are the problem, because they are set out to the developer's original kitchen and often land at odd heights or right on a joint line. Decided before fabrication starts.

The stock behind these kitchens runs to 2012 athletes' village apartment and post-2015 infill apartment block. Which of those you have decides most of what follows.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered on our east London run. Fitted 3–7 working days from template.

period detached houses and villas

Getting stone into the room

Piece length is set by the internal diagonal of the lift car, not by the length of the slab. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. It decides panel size before anything is cut.

period detached houses and villas

What gets asked for here

It is on the shortlist for this patch rather than at the top of it, because worktop replacement comes up more often. Nothing about the process differs between the two.

Access

Getting stone into a East Village kitchen

The estate is car-free in the residential courtyards with a private management company controlling access, so vehicles use designated service bays and the last stretch is a trolley run across podium paving. Deliveries and lift use must be booked with the estate management team, usually with a fixed window and a lift protection requirement.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

east London patch

East Village is covered on our east London run, along with the rest of Newham.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in East Village

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you cover East Village?

Yes. East Village is on the patch, and the postcodes we work here are E20. It is worked on our east London run, along with the rest of Newham. Underground loading has a height restriction, and a van with an A-frame on it is taller than the driver remembers. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. That is why they are crated the way they are. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Does the housing in East Village change how worktop splashbacks & upstands works?

Dot-and-dab plasterboard bellies at a taped internal angle, so the run picks up a few millimetres over the last 300mm and a plan-angle mitre will not close. The plasterboard is flat enough for a full-height panel; it is the socket positions that cause the trouble. Cut from the same slab run as the tops. Because the kitchens are identical across blocks, the layouts repeat, but the estate access rules mean the booking has to be made before the template is even scheduled.

How does the stone actually reach a kitchen in East Village?

The estate is car-free in the residential courtyards with a private management company controlling access, so vehicles use designated service bays and the last stretch is a trolley run across podium paving. Deliveries and lift use must be booked with the estate management team, usually with a fixed window and a lift protection requirement. A car that takes 2.4m on the diagonal will not take a three-metre worktop however it is stood, and there is no trimming it on the landing. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Joint positions follow from that.

Do you do much worktop splashbacks & upstands around East Village?

It is one of the three we do most here, behind worktop replacement. Same template visit, same workshop, same installers either way. Developer-fitted kitchens come with thin cam-lock carcasses, which are fine under laminate and want bracing before stone goes on them. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Siliconed to the worktop, never grouted. Upgrading a builder-finish kitchen is mostly a swap, so the cost sits in the material choice rather than in the shape of the room. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Sockets final before template.

Why do two East Village kitchens the same size price differently?

Two parallel runs with a walkway between them is the most efficient shape there is on a slab, because both pieces nest as straight lengths with almost no waste. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. The joint to the worktop is siliconed, never grouted. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What has to be finished before you can template?

Boxing is rarely the same depth at worktop height as it is at floor level, so measuring it low down is the usual reason a top will not sit back. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Make the wall good first, or accept the detail. Any socket you intend to move must be moved and re-plastered before templating, because a cut-out in the wrong place means a new piece of stone. A street with houses in single occupation next to the same houses cut into flats produces two completely different jobs from the same elevation. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Same slab run as the tops.

Next step

Splashbacks and upstands in East Village, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489