Greenford Green kitchens
The kitchens we meet in Greenford Green
We plan the installations in Greenford Green around access, ceiling height and what the kitchen has already been through, none of which shows up in a phone call. Interwar semis and terraces north of the A40, mostly unextended, with straight runs of 3m to 3.5m, the boiler still mounted on the kitchen wall and the back door in the corner. The tape measure decides it, not the description above, and not anything anybody says over the telephone.
Solid brick with a sand and cement render is firm to work against and reliably out of plumb across the length of a run. Almost everything that makes a fitting day hard is a property of the building rather than of the stone. Dust extraction indoors, or the cut happens outside.
These were built in short runs of six or eight houses, so the party walls are solid brick and the rear elevation is a straight line with no outriggers. The fitting itself is slower than the carry: original plaster on the party wall and around the old chimney breast is rarely square to the run, so back scribes get cut on site, and where a return wraps into a breast recess we template that shoulder tight and ease it in. The building moved decades ago and the fit allows for it.
The buildings themselves are mostly Interwar semi, 1930s terrace and postwar infill. The run length that is easy in one is a join in another.