Ealing · UB6

Splashbacks and upstands in Greenford Green

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Open-plan room with a navy feature wall, the Arctic Starburst peninsula and bar stools at the far end beyond the sofa

Greenford Green kitchens

The kitchens we meet in Greenford Green

People ring us about splashback and upstand work in Greenford Green at the point where they have a kitchen in mind and no idea what their own walls are going to do to it. Interwar semis and terraces north of the A40, mostly unextended, with straight runs of 3m to 3.5m, the boiler still mounted on the kitchen wall and the back door in the corner. None of that changes what you pay in Greenford Green. The figure is set at template and it holds from there.

The chimney breast in the kitchen once took a copper or a back boiler, and whatever is left of it is rarely square to the rest of the room. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. An upstand asks less of old plaster than a panel does.

The under-stair cupboard opens off the kitchen in most of them, and its door swing is the reason a corner run stops where it does. That leaves a ragged band right where the upstand has to sit, which is fine for a 100mm upstand that covers it, but a full-height splashback needs the wall made good first or it will rock on the high spots. The tile bed comes off before anything is measured.

The building types here are Interwar semi, 1930s terrace and postwar infill. Which of those you have decides most of what follows.

Undermounted sink cut-out in a quartz worktop
  • Interwar semi
  • 1930s terrace
  • postwar infill

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • A wide wall takes more than one piece, because slab width is finite.
  • The same fitters who install the worktop put the stone on the wall.
  • Wall pieces are priced by the square metre like everything else, from £110 upwards.
Borough
Ealing
Postcodes
UB6
Covered on
our west London run
Fitted
5–10 working days from template

The place

Why Greenford Green is its own job

Every area has its own complications, and in Greenford Green these are the ones that decide the day. Quiet estate roads with drives and verges, approached off Greenford Road. The A40 slip roads are the pinch point at either end of the day. Wall-hung boilers directly above the worktop mean the upstand has to stop short and the splashback gets cut around the pipe run rather than behind it. The itemised quote is deliberately boring reading, because a boring quote is one with no surprises left in it.

The work

What worktop splashbacks & upstands involves

The work carries the same five year workmanship guarantee as the worktop and is done by the same installers, which is why it is booked as part of the same job. The wall is read for how flat and how plumb it is before anything is drawn, because a panel that stands off a bowed wall at one end shows it along its whole length. You end up with a run of stone that reads as one decision rather than two, because the wall and the surface were drawn, machined and fitted as parts of the same job.

An upstand is a low strip of the same material standing on the worktop against the wall, usually about a hundred millimetres; a splashback carries on up to the wall units or the extractor. Behind a hob the panel usually rises higher than the rest of the run and stops at the extractor instead of at the units. Ceilings are generous here and the units stop well below the picture rail, so full height is genuinely tall and the sheet gets heavy. A hand's width, or all of it.

Sink cut-outs See the options

The money

What it costs in Greenford Green

Sockets and switches are cut-outs like any other, and their number does more to the price than the height of the panel does. Short lengths nest well and waste little, so the material line is usually the kindest part of a galley quote. Material is £110 to £550 per square metre supply only, with the batch and the slab size sitting behind that variation, and the workshop time quoted apart from it. Quoted as its own item, so the grout line has a price.

1930s and inter-war semis

The carry, and what it rules out

Where the front garden has been paved over completely the van stands close to the house, and the route in is still a standard front door. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. Standing a panel on the pavement is the last resort.

1930s and inter-war semis

The building, and what it does to the job

Boxing built in plasterboard on a light frame will take no useful fixing, so nothing bears on it and the stone is carried off the carcasses either side. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. Full height wants a flat wall behind it.

1930s and inter-war semis

What Greenford Green asks for

Part of the regular mix on this patch. Worktop replacement edges it, and worktop replacement and worktop installation fill out the rest.

Access

Getting stone into a Greenford Green kitchen

The A40 slip roads are the pinch point at either end of the day.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

West London patch

Greenford Green is covered on our west London run, along with the rest of Ealing.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Greenford Green

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you cover Greenford Green?

Yes. Greenford Green is on the patch, and the postcodes we work here are UB6. It is worked on our west London run, along with the rest of Ealing. A front drive is the best thing that can happen to a fitting day, because the tail lift comes down within a few metres of the door and nothing is on a clock. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Handling is where these pieces get damaged. We come to the kitchen to template and again to fit, so there is nothing to visit and nothing to collect.

02

Does the housing in Greenford Green change how worktop splashbacks & upstands works?

The chimney breast served a back boiler and is usually still standing, so there is a shallow recess on one side of the room. The ragged band left when old tiles and laminate come off together is what usually decides upstand over full height. Panels expose a wall; upstands forgive one. A stack boxed diagonally across a corner leaves a triangle of dead space, and the top is cut to that triangle rather than to a square return. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Each obstruction is another joint, and it is priced as one.

03

How does the stone actually reach a kitchen in Greenford Green?

Where the van stands level with the front of the house a piece gets handled twice instead of five times, and stone breaks on handling rather than on the road. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. It travels on edge, so the clearance is checked on edge. Off-street parking means the van stays put all day, so tools, packers and the offcut we would rather have than not are all within reach. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. One trip is always better than three.

04

Do you do much worktop splashbacks & upstands around Greenford Green?

Often enough. It is one of the three, behind worktop replacement. The template, the workshop and the installers are the same either way. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. The extension electrician finishes after the drawing did. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Upstands turn batch offcuts into finished rooms.

05

What am I actually paying for, line by line?

A galley that is also the route to the back door is a corridor first and a kitchen second, and what the shape can take is set by the traffic going through it. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. A joint behind a tap is a joint on show. The supply-only figure for material runs £110 to £550 per square metre, and templating, fabrication and fitting are lines of their own.

06

Is there anything I have to finish before the template in Greenford Green?

Where the boxing stands proud of the finished wall the upstand behind it has to be broken into separate lengths, because one piece cannot pass it. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. The panel takes its height off the steel. The old tiling must be off and the wall made good and dry before templating, not on fitting day. The householder is normally on site at template, and that is the right time to settle sink position, tap centres and overhang rather than agree them by email. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Same slab run, so it is settled at drawing stage.

07

Can I have stone up the wall in a Greenford Green kitchen?

A full-height piece behind the hob has to allow for the extractor, so that gets settled first. Both are templated after the worktop is down and settled, because they are cut to the wall itself. A full-height piece shows a wall that is out more than an upstand does, over the extra height. An inter-war terrace is wider than a Victorian one and shallower than a semi, so the kitchen is a compact square room rather than a galley. Where a full-height panel is wanted, the wall is made good first or the panel rocks on the high spots. What the wall can take decides how tall the stone goes.

08

Does a stone worktop need sealing?

Upkeep is settled when the slab is chosen, since it belongs to the material rather than the fabrication. Marble is the one people underestimate. It is porous, like granite, and wants sealing. Topping a seal up is a wipe-on job with a cloth. There is usually a shared rear alley, and whether the gate onto it is unlocked decides whether long pieces come in from the back. Behind a hob the panel runs to the underside of the extractor, and that height is settled on site rather than on the plan. Old walls lean back, and a tall panel shows it.

09

What happens if my units are not level?

A sloping floor is not the problem. The plane the unit tops finish in is. Level is checked at the template, which is the point of measuring in the room rather than off a drawing. Units have to be fixed down as well as levelled. A loose carcass moves under stone. A boxed soil stack or service riser in the corner of a run eats into the worktop depth and has to be scribed around rather than cut square. It decides whether the run gets one continuous piece or a set of separate lengths with a joint at every obstruction. Upstands sit tight because both edges are cut.

10

Can the sink be undermounted rather than sat on top?

The tap hole is drilled in the workshop too, and its position depends on how far the tap has to swing. A piece with a bowl and a hob cut into it is the fragile one, and it is handled accordingly. If the sink or hob changes after the template, the drawing changes first and nothing is cut meanwhile. Two runs of similar length nest as a pair off one slab, and if one of them grows by a few hundred millimetres the pair stops fitting and the yield changes for both. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. Panels come off the same slab area as the run.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“We had a fantastic experience with Worktop WorX from start to finish. The team was professional, friendly, and delivered excellent workmanship. We chose the beautiful Capri White worktop, and it has completely transformed our kitchen with its elegant, high-end look.”
NoniGoogle review · Capri White
★★★★★
“Karem did a fantastic job at installing my antique bronze mirror for my coffee/drinks unit. He was really professional and his communication throughout was clear.”
KalsGoogle review
★★★★★
“We have a new kitchen. Our builder recommended Worktop Worx for our worktop. Now we have an amazing worktop very good price too. Really recommend. They were really good to us. 10/10”
j thomasGoogle review

Next step

Splashbacks and upstands in Greenford Green, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.