Ealing · UB6

Worktop replacement in Greenford

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Arctic Starburst carried round a U-shaped kitchen in pale grey handleless units, pendants over the breakfast bar

Greenford kitchens

The kitchens we meet in Greenford

Two kitchens a street apart in Greenford can turn worktop replacement into two quite different pieces of work, which is why nothing is priced from the doorstep. 1930s semis with the original kitchen and larder opened into the dining room, giving a 4m to 5m L with a peninsula, and the attached garage frequently converted into a utility with a matching short run. Nothing is payable until the template is taken, so finding out where you stand costs you nothing at all.

The scullery and the kitchen were knocked into one at some point, and the stub of the old dividing wall is still there under the plaster. Carcasses that carried laminate for two decades are worth checking, and often bracing, before they carry stone. Cutting the old top out saves the units below it.

The original room is timber over a ventilated void and the newer half is a slab, so the floor gives underfoot on one side of the junction and not on the other. What catches people out is the junction between the old floor and the extension floor, which is rarely at the same level, so a run carrying across it needs the units packed before stone goes on. The shell is the constant here; the surface is not.

The kinds of building we work in here are 1930s Metroland semi, postwar estate house, 1960s block and industrial-fringe new-build. The template reads them differently even where the layout looks identical.

Polished stone edge profile close up
  • 1930s Metroland semi
  • postwar estate house
  • 1960s block
  • industrial-fringe new-build

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • There are 181 surfaces to choose from, starting at £110 per square metre.
  • Old tops come out in the morning, new stone is down and sealed the same day.
  • A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
Borough
Ealing
Postcodes
UB6
Covered on
our west London run
Fitted
5–10 working days from template

The place

Why Greenford is its own job

Fitting stone in Greenford is a question of what the building will allow, and we would rather find that out early. Western Avenue makes delivery easy and the residential roads are wide with drives. The Greenford roundabout and Ruislip Road are the congestion points. The gas run and meter box sit on the kitchen flank wall in these semis, so the units get packed off the wall and the top has to be templated to that packed line. It is all worked out on site in Greenford, written down, and agreed with you before a single cut is made.

The work

What worktop replacement involves

Replacement suits a kitchen that works but has a surface past saving, burnt, swollen at the joints, or lifting where water has found its way into the board underneath. Whatever sits on top of the old surface, tiling, an upstand or a run of sealant, has to be dealt with in the same visit, so it is priced with the job rather than left as a surprise. You end up with cut-outs machined for the sink and hob you have now, which is not always what the old top was cut for, and a run that meets the wall as it stands today.

Replacement is the one worktop job where the survey and the demolition are the same piece of work. Brackets, battens and any timber sub-frame come out with the top, and what was screwed into the wall gets filled. Kitchens in these were pushed into the old scullery, so half the run sits on newer cabinets and half on what came before. Sink and hob settled before the templater attends.

Edge profiles See the options

The money

What it costs in Greenford

A replacement is priced against the kitchen that is there now, and the carcasses are the one condition that can change it. Two facing runs mean two sets of edges and two scribes in a small span, which is why a compact galley rarely prices as cheaply as its area suggests. Multiplying your worktop area by something between £110 and £550 gives you a material bill rather than a job cost, and the two are far enough apart to be worth keeping separate. The carcass check happens before the deposit.

1930s and inter-war semis

Greenford in the housing figures

Taken across Greenford and the roads either side of it, a large share of the housing went up between the wars. On a room that size the cut-outs cost more than the area. The same original carcasses turn up again and again, and their surfaces came away the same way each time. The carcasses are the one condition.

1930s and inter-war semis

What Greenford asks for

More of our week goes on this than on worktop installation put together.

1930s and inter-war semis

The carry, and what it rules out

Drives with a dropped kerb and a tight turn-in take a long van at an angle, and that angle decides which side the tail lift can work from. Two loads share the one space here, the old tops waiting to go and the new stone waiting to come in. It is a full day at the kerb, not a delivery.

Access

Getting stone into a Greenford kitchen

The Greenford roundabout and Ruislip Road are the congestion points.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

West London patch

Greenford is covered on our west London run, along with the rest of Ealing.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Greenford

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Is Greenford far enough out to be a problem for you?

Yes. Greenford is on the patch, and the postcodes we work here are UB6. It is worked on our west London run, along with the rest of Ealing. Where the drive is too short for the van the back end overhangs the footway, and a footway is a route people are using rather than spare space. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. Two loads, one space, one day. Everything that involves you happens in your kitchen, so there is nothing to visit and nothing to collect.

02

What is different about worktop replacement in Greenford?

Plaster in the older half is a sand and cement backing on brick while the newer half is board on dabs, so the same fixing bites in one wall and breaks through the other. The kitchen is normally the original back room with a later side-return or rear extension bolted on, and that helps us: most pieces can go down the side alley and in through the back door in one length, so we can avoid joins that a front-door route would force. Units kept, surface changed, one day. The face of a breast is rarely flat, and a top returning onto it picks up that bow across the last few hundred millimetres of its length. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. The old cut-out was hiding the notch you now need.

03

Is access a problem in Greenford?

A short hard approach with no steps means a full-length piece can be walked in flat by two people rather than turned up on edge. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. Disconnection happens before the old top is lifted, not during. Having the van on the drive means the load can be staged, so the heavy pieces come off last and go straight in instead of standing outside. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. The old tops have to go somewhere as well.

04

Is Greenford mostly worktop replacement work for you?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop installation. An open-plan extension puts the worktop in the middle of the living space, so it is looked at from the sofa as well as worked on. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. Housings set out for laminate are checked first. Extension budgets are usually well spent by the time the worktop is ordered, which is where the choice between quartz and a thinner sintered stone actually gets made. Old tops out in the morning, new stone down and sealed the same afternoon. A builder-finish kitchen upgrades in a morning.

05

What makes one Greenford kitchen dearer than the next?

A run that stops in mid-air at the open end needs a finished end rather than a cut one, and that end takes the same edge work as the whole front. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. A run that flexed under laminate gets support now. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

06

What holds a template up more often than anything else?

Old breasts carry a bulge low down where the original opening was closed up, and the units stand off it before the stone is measured at all. We would rather find it at template than on the morning, which is why the templater looks behind the units. Levels get corrected before the new top is measured. Unlock the side gate and clear the alley of bins, bikes and pots, and arrange a plumber for the sink and an electrician if the hob is hard-wired. Where someone is living in the house through the work, the strip-out and the fit are planned so the kitchen is out of use for a day and not a week. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Void periods do not extend to suit a lead time.

07

How many visits does a Greenford worktop take?

On the fitting day floors and door frames are protected, joins clamped flush, sink and hob sealed. The fitting itself is one visit: a plain run is a morning, an island with splashbacks takes most of the day. Templating and fitting are two visits, not one, and the gap between them is when the stone is actually cut. Internal walls are hollow clay block or stud rather than solid brick, so two points a metre apart on the same wall want two different fixings. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. Door fronts and drawers get checked against the new thickness.

08

What maintenance does a worktop need in a Greenford kitchen?

Day to day all three want soap and water; abrasive creams and scouring pads are what dull a polished surface. A seal is not waterproofing. It only buys time to wipe a spill up. Where a top takes wine, oil and lemon most days, the non-porous materials ask least of the household. The drains run down the side alley to a gully and an inspection cover near the back door, and the sink waste has always gone out on that side of the house. The junction between the old floor and the extension floor is where a run crossing it needs packing before stone goes on. What is under the old top is the real question.

09

Is a drainer groove worth it in a small Greenford kitchen?

The bowl position has to be settled before templating, since the grooves are set out from it. A groove set is its own item on the quote rather than something rolled in with the sink cut-out. Where there is no room for a separate drainer, grooves are usually what gets specified instead. A serving hatch through to the dining room is common, and closing one up leaves a panel of newer wall exactly where the run passes. Taking the old tops off is also the first honest look at what has been going on underneath them. A thicker top changes what clears the top drawer.

10

Can a Greenford worktop be done in one piece?

A join cannot cross a cut-out, so a sink mid-run takes away the position you would have used. Slabs come in finite sizes, so a long run needs a join whatever the room looks like. Join count is a question about slab size and run length, nothing else. Where a run finishes hard against a wall the last few millimetres are scribed, and where it finishes in open floor it is cut square and polished, which is two different jobs on one length. Old laminate has often been holding a run square for years, and taking it off shows what the units were really doing. Appliance gaps are checked against the new thickness.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Karem did a fantastic job at installing my antique bronze mirror for my coffee/drinks unit. He was really professional and his communication throughout was clear.”
KalsGoogle review
★★★★★
“We have a new kitchen. Our builder recommended Worktop Worx for our worktop. Now we have an amazing worktop very good price too. Really recommend. They were really good to us. 10/10”
j thomasGoogle review
★★★★★
“We recently had the Arctic Starburst worktop installed by Worktop WorX and it looks amazing. The subtle sparkle really catches the light and gives the kitchen a clean, modern feel. The Arctic Starburst surface feels high quality, durable, and is easy to keep clean. The finish and installation from Worktop WorX were spot on. Really happy with the result and would definitely recommend both Arctic Starburst and Worktop WorX to anyone upgrading their kitchen.”
Han LeeGoogle review · Arctic Starburst

Next step

Worktop replacement in Greenford, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.