
Hammersmith and Fulham · W6
Worktop templating in Hammersmith
A digital template plotting the room as it really is, taken once your units are fitted, fixed and level.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
Hammersmith kitchens
What the kitchens here are actually like
A hundred and forty years of alterations sit under the current kitchen, and the worktop is what has to sit flat on top of all of it. No stone is ever cut from a plan, which is why the visit happens after the units are in and not before. Sink, tap and hob on site, not on order.
Away from the gyratory the stock is standard two-bay Victorian terrace with a rear kitchen, and the common job is a side-return infill giving an L of about 3.4m by 2.4m with an island where the old boundary wall was.
The gyratory and the flyover approach are red-route controlled with no stopping, so the van goes onto the residential streets and the crew walks the last stretch. Riverside Georgian houses near the bridge are a different animal - small rooms, uneven floors and kitchens of 2.4-2.8m that have to work around original panelling.
Where the side return has been filled in, the old external wall is now an internal one and still carries its render, its gutter line and its old fixings. Alcoves either side of the breast are rarely the same width and rarely parallel, so each one is templated as its own piece with its own scribe. No stone is ever cut from a plan.
The buildings themselves are mostly Victorian terrace, Georgian riverside terrace by the bridge, 1960s-70s tower and slab block and recent town centre apartment scheme. They are not interchangeable, and a worktop finds the differences quickly.
True everywhere
Worktop templating, in short
- Two to three hours on site for a typical kitchen.
- Units must be fitted, fixed and level first. No stone is ever cut from a plan.
- Sink, tap and hob must be physically on site, not just ordered.
- A Belfast or butler sink must be installed and at its final height.
Covered on our west London run. Fitted 3–7 working days from template.
Victorian and Edwardian terraces
What gets asked for here
Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Two to three hours on site, with the sink, tap and hob physically present. Units fitted, fixed and level first.
The research on this patch puts this at the top of the list, above worktop fabrication and worktop installation.
Victorian and Edwardian terraces
The building, and what it does to the job
The hall newel post is the usual failure point on a Victorian terrace - offer the template board up the hall before you commit to a single-piece island.
Victorian and Edwardian terraces
Getting stone into the room
Terraced streets here mostly have front gardens with a gate and a step, and the standard route in is the hallway past the stair newel, which is where longer pieces get stopped.
Access
Getting stone into a Hammersmith kitchen
The gyratory and the flyover approach are red-route controlled with no stopping, so the van goes onto the residential streets and the crew walks the last stretch. Terraced streets here mostly have front gardens with a gate and a step, and the standard route in is the hallway past the stair newel, which is where longer pieces get stopped.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
west London patch
Hammersmith is covered on our west London run, along with the rest of Hammersmith and Fulham.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop templating in Hammersmith
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you cover Hammersmith?
Yes. Hammersmith is on the patch, and the postcodes we work here are W6. It is worked on our west London run, along with the rest of Hammersmith and Fulham. Where the frontage is a clearway the unload happens away from the door and the carry gets longer, which is a crew and time question rather than a stone one. The templating visit needs somewhere to stop for two or three hours, which is a different problem from unloading for twenty minutes. The templater needs a proper stop, not a pause. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Does the housing in Hammersmith change how worktop templating works?
Where the side return has been filled in, the old external wall is now an internal one and still carries its render, its gutter line and its old fixings. Alcoves either side of the breast are rarely the same width and rarely parallel, so each one is templated as its own piece with its own scribe. No stone is ever cut from a plan. The hall newel post is the usual failure point on a Victorian terrace - offer the template board up the hall before you commit to a single-piece island.
How does the stone actually reach a kitchen in Hammersmith?
The gyratory and the flyover approach are red-route controlled with no stopping, so the van goes onto the residential streets and the crew walks the last stretch. Terraced streets here mostly have front gardens with a gate and a step, and the standard route in is the hallway past the stair newel, which is where longer pieces get stopped. Door width, hall width and the diagonal at the turn are three separate measurements, and it is the diagonal that catches people out. Door widths, turn diagonals and any change of level are recorded on the drawing alongside the run dimensions. That is part of what the visit is for.
Is Hammersmith mostly worktop templating work for you?
Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop fabrication and worktop installation. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Two to three hours on site, with the sink, tap and hob physically present. Units fitted, fixed and level first. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. The template visit is booked once the units are genuinely in, not when they are nearly in. Appliances on site, not on order.
Why do two Hammersmith kitchens the same size price differently?
On a heavily veined stone the island and the run behind it are nested off the same area of slab so the movement relates across the room. The template records every angle in that shape as it actually is rather than as the plan drew it. One datum for the whole room. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What has to be finished before you can template?
Floors settle, and once base units are packed and levelled properly the stone sits true while everything else in the room admits it is not. The template plots it as it is, at the exact height the worktop will sit, and the drawing carries that through. Measured at worktop height, nowhere else. Units fixed and packed level over the sloping floor, walls replastered and dry at their final thickness (tiling and splashbacks go on after the worktop, never before), and the sink, tap and hob physically on site, with a Belfast sink built in and set at its finished height. A street with houses in single occupation next to the same houses cut into flats produces two completely different jobs from the same elevation. The templater needs the sink, tap and hob on site, and a Belfast sink installed at its final height. Fitted, fixed and level, then we come.
Related
More around Hammersmith
Other work we do in Hammersmith
Next step
Worktop templating in Hammersmith, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.