Hammersmith and Fulham · W6

Splashbacks and upstands in Hammersmith

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

Hammersmith kitchens

The kitchens we meet in Hammersmith

A good quote for splashback and upstand work in Hammersmith reads like a description of your kitchen rather than a price list, and that is deliberate. Away from the gyratory the stock is standard two-bay Victorian terrace with a rear kitchen, and the common job is a side-return infill giving an L of about 3.4m by 2.4m with an island where the old boundary wall was. Riverside Georgian houses near the bridge are a different animal - small rooms, uneven floors and kitchens of 2.4-2.8m that have to work around original panelling. Tell us which street you are on in Hammersmith and what the old worktop is, and we can usually narrow it down before we visit.

Chimney breasts and the alcoves either side of them break the run into short pieces before anyone has drawn a kitchen. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. Height is taken at the shortest point of the run.

The meters sit in the hall or under the stairs on the way through, so the carry passes a cupboard door that has to be shut and protected before anything moves. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. Decided before fabrication starts.

What we are measuring in, mostly, is Victorian terrace, Georgian riverside terrace by the bridge, 1960s-70s tower and slab block and recent town centre apartment scheme. That mix is why two jobs on the same road can run completely differently.

Polished stone edge profile close up
  • Victorian terrace
  • Georgian riverside terrace by the bridge
  • 1960s-70s tower and slab block
  • recent town centre apartment scheme

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Dekton and sintered stone are stable in heat and daylight, which is why they suit a wall behind a hob.
  • A wide wall takes more than one piece, because slab width is finite.
  • The same fitters who install the worktop put the stone on the wall.
Borough
Hammersmith and Fulham
Postcodes
W6
Covered on
our west London run
Fitted
5–10 working days from template

The place

Why Hammersmith is its own job

Because we work across Hammersmith rather than one street of it, we know which questions are worth asking up front. The gyratory and the flyover approach are red-route controlled with no stopping, so the van goes onto the residential streets and the crew walks the last stretch. Terraced streets here mostly have front gardens with a gate and a step, and the standard route in is the hallway past the stair newel, which is where longer pieces get stopped. The hall newel post is the usual failure point on a Victorian terrace - offer the template board up the hall before you commit to a single-piece island. Every one of those is a question we ask on the design visit, long before anybody talks about a deposit.

The work

What worktop splashbacks & upstands involves

What these pieces do is protect the wall where water and heat land: behind the tap, behind the hob, and along the back edge where a cloth never quite reaches. Because the tops are already in, the kitchen stays in use around this stage. It is a return visit rather than another day of the room being unavailable. You end up with a run of stone that reads as one decision rather than two, because the wall and the surface were drawn, machined and fitted as parts of the same job.

Splashbacks and upstands are the part of the job that takes the grout line out of the kitchen, which is what most people are really asking for when they ask about stone behind the hob. Internal corners are butt-jointed rather than mitred, and the vertical is put where the light does not rake across it. In a house this old the wall behind the run has been skimmed over lath in one bay and dot-and-dabbed onto brick in the next, and a tall sheet finds both. Machined to the room, not trimmed to it.

Edge profiles See the options

The money

What it costs in Hammersmith

It is priced as its own item so you can see what removing the grout line actually costs before deciding. The island is normally the largest single piece in the kitchen, which makes it the piece that sets the carry and sometimes the price. The supply band of £110 to £550 per square metre is known the day you choose a colour. What is not known until the template is the piece count and the number of cut-outs. Same slab run, and the quote says so.

Victorian and Edwardian terraces

What Hammersmith asks for

Around here this is occasional rather than routine. The routine ones are worktop fabrication and worktop installation. That is a comment on the buildings and on nothing else.

Victorian and Edwardian terraces

Hammersmith in the housing figures

Across Hammersmith, owner-occupation is well below the London average. Whether it is stone or tile is usually a budget decision made by someone who will never see the room. The wall as it is, not as it should have been.

Victorian and Edwardian terraces

The carry, and what it rules out

Where the frontage is a clearway the unload happens away from the door and the carry gets longer, which is a crew and time question rather than a stone one. Full-height panels are the awkward thing to move, light enough to lift and long enough to flex on the way. The crate exists for the walk from the van.

Access

Getting stone into a Hammersmith kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

West London patch

Hammersmith is covered on our west London run.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Hammersmith

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you cover Hammersmith?

Yes. Hammersmith is on the patch, and the postcodes we work here are W6. It is worked on our west London run, along with the rest of the borough. Loading exemptions on red routes are narrow, time-limited and heavily camera-enforced, so we plan around them rather than relying on them. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. A tall panel and a timed bay is the worst combination here. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

02

What is different about worktop splashbacks & upstands in Hammersmith?

The back addition is a narrow two-storey outrigger with a single external wall, and the kitchen galley runs the length of it. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. Height, returns and sockets, all settled on site. Where two pieces meet over a fall in the floor the join has to be flush to the hand as well as true to the level, because the eye reads the join and forgives the room. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Scribed, dubbed out, or set proud. Pick one.

03

Is access a problem in Hammersmith?

A hall radiator or a coat hook at shoulder height takes a hundred millimetres off the usable width, and a hundred millimetres is often the entire margin. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. A vertical break is easier to live with than a cracked panel. The realistic answer on a main road is an early slot, a spotter on the van and pieces staged in one movement rather than several trips. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. They go in with the first load where the stop is short.

04

Would you call Hammersmith a worktop splashbacks & upstands area?

Not really, and there is no sense dressing it up. What the research on this patch actually lists is worktop fabrication and worktop installation. That is a statement about the local housing rather than about the work. It gets quoted, cut and fitted exactly as it would anywhere else on the patch. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Upstands turn batch offcuts into finished rooms. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. The cheap way to make eight kitchens look specified.

05

What makes one Hammersmith kitchen dearer than the next?

Whether it comes off the same slab as the run behind it or needs one of its own is settled by laying both against the usable area of the slab, not by adding the metres up. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Every internal corner is two pieces, not one. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

06

What holds a template up more often than anything else?

Floors settle, and once base units are packed and levelled properly the stone sits true while everything else in the room admits it is not. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. The obstruction sets the joint, not the wall. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. One owner can take a date next week while the flat below needs three weeks of notice, so several kitchens in one building end up scheduled by the slowest permission. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Full height is decided before fabrication, not after.

07

What is the order of events on a Hammersmith kitchen?

The same firm templates and fits. Nobody else is brought in to install. The fitting itself is one visit: a plain run is a morning, an island with splashbacks takes most of the day. Upstands and splashbacks are templated after the worktop is down and settled, so they are a separate visit. The original front door is narrow and the hall is often the only way in, which puts a ceiling on the longest single piece. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. A chimney breast breaks a panel run regardless of the drawing.

08

Is taking the old top off part of the job?

An old stone top is heavier coming out than the new one is going in, and leaves in sections. The tap and waste have to be disconnected by a plumber before we start and reconnected once the stone is in. Disposal means it goes in the van, not into the garden to wait for a collection. A single red line has hours and a double red line does not, and the difference decides whether an early start is a plan or a penalty. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Rushing the last piece off the van is how panels break.

09

Can I have grooves instead of a separate drainer in Hammersmith?

Grooves are machined in the workshop at the same time as the bowl cut-out, because they cannot be done well in a kitchen. The grooves sit inside the depth of the top with stone left either side, so a shallow run limits them. Where there is no room for a separate drainer, grooves are usually what gets specified instead. There is usually a step down into the back addition, so the kitchen floor and the hall floor are not the same level and neither of them is flat. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Boxed pipework decides the panel width before taste does.

10

What if I have already sourced the slab?

Supply through us runs £110 to £550 per square metre for the slab alone, which is the line you would be removing. Templating, fabrication and fitting are the same three lines whether the stone came from us or from you. Remnants bought elsewhere are the awkward case, because the drawing is then made to fit the stone. Extension work runs late far more often than it runs early, and the worktop is close to the last thing in, so the date agreed at the start is rarely the date that happens. Upstands are the cheapest way to finish several kitchens consistently, and they come out of the offcuts the tops leave behind. Wipe-down beats sealed grout on a turnaround.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Karem did a fantastic job at installing my antique bronze mirror for my coffee/drinks unit. He was really professional and his communication throughout was clear.”
KalsGoogle review
★★★★★
“We have a new kitchen. Our builder recommended Worktop Worx for our worktop. Now we have an amazing worktop very good price too. Really recommend. They were really good to us. 10/10”
j thomasGoogle review
★★★★★
“We recently had the Arctic Starburst worktop installed by Worktop WorX and it looks amazing. The subtle sparkle really catches the light and gives the kitchen a clean, modern feel. The Arctic Starburst surface feels high quality, durable, and is easy to keep clean. The finish and installation from Worktop WorX were spot on. Really happy with the result and would definitely recommend both Arctic Starburst and Worktop WorX to anyone upgrading their kitchen.”
Han LeeGoogle review · Arctic Starburst

Next step

Splashbacks and upstands in Hammersmith, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.