Hammersmith and Fulham · W6
Kitchen worktops in Hammersmith
Away from the gyratory the stock is standard two-bay Victorian terrace with a rear kitchen, and the common job is a side-return infill giving an L of about 3.4m by 2.4m with an island where the old boundary wall was. Riverside Georgian houses near the bridge are a different animal - small rooms, uneven floors and kitchens of 2.4-2.8m that have to work around original panelling.
The housing stock
What we are usually working with in Hammersmith
Away from the gyratory the stock is standard two-bay Victorian terrace with a rear kitchen, and the common job is a side-return infill giving an L of about 3.4m by 2.4m with an island where the old boundary wall was.
The gyratory and the flyover approach are red-route controlled with no stopping, so the van goes onto the residential streets and the crew walks the last stretch. Riverside Georgian houses near the bridge are a different animal - small rooms, uneven floors and kitchens of 2.4-2.8m that have to work around original panelling.
The hall newel post is the usual failure point on a Victorian terrace - offer the template board up the hall before you commit to a single-piece island.
Terraced streets here mostly have front gardens with a gate and a step, and the standard route in is the hallway past the stair newel, which is where longer pieces get stopped.
The mix here is Victorian terrace, Georgian riverside terrace by the bridge, 1960s-70s tower and slab block and recent town centre apartment scheme. A quote that ignores which one you have is guessing.
A hundred and forty years of alterations sit under the current kitchen, and the worktop is what has to sit flat on top of all of it. Protection down, dry-lay, scribe, then bond: the order matters more in a difficult room than an easy one. The route is walked before the first lift.
The addition wall is half a brick thick in places and has usually had a damp course injected and been re-plastered, which leaves it neither flat nor consistent. The day is planned backwards from the hall. Walked, measured, protected, then lifted.
The kitchen is a small square room off a narrow entrance lobby, and the turn out of that lobby is the real limit on piece length. Deck access or a single narrow staircase with tight half-landings means long pieces get walked up on edge, and the landing turn is checked before we commit. That is the shape of the day.
The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Two to three hours on site, with the sink, tap and hob physically present. Appliances on site, not on order.
Access. The gyratory and the flyover approach are red-route controlled with no stopping, so the van goes onto the residential streets and the crew walks the last stretch. Terraced streets here mostly have front gardens with a gate and a step, and the standard route in is the hallway past the stair newel, which is where longer pieces get stopped.
At a glance
- Borough
- Hammersmith and Fulham
- Postcodes
- W6
- Covered from
- New Malden patch
- Lead time
- 3–7 working days from template
There is nothing to visit in Hammersmith. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.
Services
What we do in Hammersmith
Six services, ordered by what Hammersmith's housing stock actually asks for most.
Nearby
We also work around Hammersmith
Questions
Working in Hammersmith
Do you fit kitchen worktops in Hammersmith?
Yes. Away from the gyratory the stock is standard two-bay Victorian terrace with a rear kitchen, and the common job is a side-return infill giving an L of about 3.4m by 2.4m with an island where the old boundary wall was. Riverside Georgian houses near the bridge are a different animal - small rooms, uneven floors and kitchens of 2.4-2.8m that have to work around original panelling. Loading exemptions on red routes are narrow, time-limited and heavily camera-enforced, so we plan around them rather than relying on them. The fitting slot is set around it, which is why we ask about it when the date is booked and not before we leave the yard. We would rather ask than guess.
What kind of kitchens do you usually work on in Hammersmith?
Victorian terrace, Georgian riverside terrace by the bridge, 1960s-70s tower and slab block and recent town centre apartment scheme. The addition wall is half a brick thick in places and has usually had a damp course injected and been re-plastered, which leaves it neither flat nor consistent. The day is planned backwards from the hall. Walked, measured, protected, then lifted.
Is access difficult in Hammersmith?
The gyratory and the flyover approach are red-route controlled with no stopping, so the van goes onto the residential streets and the crew walks the last stretch. Terraced streets here mostly have front gardens with a gate and a step, and the standard route in is the hallway past the stair newel, which is where longer pieces get stopped. Everything comes through the front door and down the hall, so the tightest point on the route is usually the newel post at the foot of the stairs. We walk the route with a tape and protect it end to end before the first piece is lifted. It gets checked before the first piece is lifted.
What do you get asked for most in Hammersmith?
Worktop templating, worktop fabrication and worktop installation, in that order. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Two to three hours on site, with the sink, tap and hob physically present. Appliances on site, not on order. The hall newel post is the usual failure point on a Victorian terrace - offer the template board up the hall before you commit to a single-piece island.
What decides the price of a worktop in Hammersmith?
Seating overhangs past roughly 300mm will not carry on the carcass alone, so flat steel bar or a plywood substrate has to be built into the units first. On the day that means dry-laying the whole layout first and only then pulling and bonding the joins. Dry-lay first, always. Legs bottoming out on hard concrete or an uneven screed mean the tops of the carcasses are not one plane, and that is picked up at template rather than on fitting day. One measurement never describes it, which is why a tape reading taken before the visit rarely matches the template. Measured at worktop height, nowhere else. Material runs from £110 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines rather than rolled into one figure.
Do you work in flats and leasehold properties in Hammersmith?
A street with houses in single occupation next to the same houses cut into flats produces two completely different jobs from the same elevation. The template happens when the units are in, fixed and level, whoever is fitting them. No stone is cut from a plan. Tell us the building when you book and the lift, the stair turn and any freeholder notice get built into the day rather than found on it.
Next step
Get your Hammersmith kitchen priced
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.