Richmond upon Thames · KT1

Worktop installation in Hampton Wick

Fitting day: protected route, back edges scribed to the real wall line, joins pulled flush, sink and hob sealed.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Capri White island with a brass bridge tap over the sink, the range cooker and lantern pendants beyond, dressed with eucalyptus

Hampton Wick kitchens

The kitchens we meet in Hampton Wick

Before we quote any of the installations in Hampton Wick we want to know what the kitchen actually is, because the answer changes more than the price. Small Georgian and Victorian cottages in a compact village layout, with kitchens often only 2m to 2.6m of run and a doorway at each end, so the design is about tall storage and a single well-planned run rather than an island. A worktop that fits is a worktop that was measured. The description is background, the template is the actual instruction.

Lower ground floor kitchens are reached by a stair with a winder in it, and the head height over that winder is lower than the room at either end. Levelling is done under the units and not under the stone, so anything out is corrected before a piece is lifted in. Older buildings get the extra hour.

Floors are suspended timber over a shallow void and have moved, so the units are packed and levelled before anything is set on them. Old skirting behind the carcasses is checked at worktop height, since that is what decides whether the top can go back tight. The tops go on level even when nothing else is.

What the research records here is Georgian cottage, Victorian terrace, Victorian villa and modern riverside flats. What is behind the plaster is different in each, and it matters at fixing.

Mitred waterfall edge detail on a quartz island
  • Georgian cottage
  • Victorian terrace
  • Victorian villa
  • modern riverside flats

True everywhere

Worktop installation, in short

  • One visit. A straightforward run is a morning; an island and splashbacks take most of the day.
  • Workmanship is guaranteed for five years, the material for 25.
  • Every piece is carried in by hand, and stone does not bend.
  • We seat and seal the sink and hob. We do not connect water, waste, gas or electrics.
Borough
Richmond upon Thames
Postcodes
KT1
Covered on
our south west London run
Fitted
5–10 working days from template

The place

Why Hampton Wick is its own job

People who have already had stone fitted in Hampton Wick will know most of what follows, and will know why we ask. The village sits at the foot of Kingston Bridge, so traffic queues through it most of the day, the streets are narrow with residents' bays, and many cottages open straight onto the pavement with no front garden to stage the load in. Doors opening straight onto the street mean the slab goes from tailgate to threshold in one move, so the van has to be right at the door or the job stalls. Templating in the room after the units are level takes the guesswork out of all of it.

The work

What worktop installation involves

Installation assumes the pieces already fit. It is not a fitting service for stone somebody else cut, because the day depends on the template and the machining having been done to the same drawing. The run is set out from a fixed point, a corner or the wall the sink sits against, and worked outward, so what tolerance the room has ends up at the open end where it can be absorbed. You end up with the fitting day behind you in one go. There is no second appointment for a piece that did not fit and no trades left waiting on each other to come back.

A straightforward run is a morning. An island, a set of splashbacks, or both, is most of a day. Anything found on the day that changes the job is raised before it is fixed, not itemised afterwards. In a house of this age the wall behind the run is the least straight thing in it, so the scribe is the long part of the day rather than the fixing. You watch it go down before it is fixed, not after.

Waterfall ends See the options

The money

What it costs in Hampton Wick

Two identical kitchens fit at different prices when one is up a stairwell and the other is through a back door. Short lengths nest well and waste little, so the material line is usually the kindest part of a galley quote. The supply rate of £110 to £550 per square metre reads the same for a small kitchen and a large one. Everything that makes them different jobs appears further down the quote. Hands and hours, both stated.

period detached houses and villas

What Hampton Wick asks for

It is on the shortlist for this patch rather than at the top of it, because worktop replacement comes up more often. Nothing about the process differs between the two.

period detached houses and villas

The shape of the run

A doorway partway along one wall breaks that side into two separate pieces, and two short pieces cost more between them than the single long one they replace. Scribes are cut and eased one piece at a time, and a piece is only offered up to its final position once the pieces either side of it are down. Access is checked against the longest piece first.

period detached houses and villas

Hampton Wick in the housing figures

Across Hampton Wick, the upper bands are better represented here than in most of the capital. It decides how many hands the day needs, which is the part people find out late. The room decides the order of work.

Access

Getting stone into a Hampton Wick kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South west London patch

Hampton Wick is covered on our south west London run, along with the rest of Richmond upon Thames.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Hampton Wick

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do your own fitters come out to Hampton Wick?

Yes. Hampton Wick is on the patch, and the postcodes we work here are KT1. It is worked on our south west London run, along with the rest of Richmond upon Thames. Where the van can pull up level with the gate the pieces are handled the fewest times, which is what actually protects them. The fitting slot is set around it, which is why we ask about it when the date is booked and not before we leave the yard. The kerb decides the start time. Template and fit both happen at the property, so there is nothing to drive to and nothing to collect.

02

What do the kitchens in Hampton Wick do to worktop installation?

A small room puts the sink, hob and tap cut-outs close together on one short length, and the bridge of stone left between them decides whether it can be cut in one piece. We measure the front door, the hall width and the turn into the kitchen before anything comes off the van, because a 3m piece has to swing through that corner on edge and stone does not bend to help you. What the building will take decides how it is fixed. A room can be out of square in both directions at once, so the wall that leans is also the wall that runs downhill, and one scribe cannot answer both. Rushing that is what leaves a gap you look at every morning for fifteen years. A scribe is a cut. It is not an adjustment.

03

Do you have trouble getting long pieces into Hampton Wick kitchens?

A hall that widens further in is still only as good as its tightest point, and that point is usually within a metre of the front door. The fitting day is planned backwards from that point, before anything comes off the van. Four hands or eight is settled before the tail lift drops. Unrestricted does not mean empty, and a street that is clear at seven is usually full by nine. We aim for the first slot of the day where parking is tight, because that is when the street is emptiest. Van to door is the distance that matters.

04

Do you do much worktop installation around Hampton Wick?

One of the three we are asked for most, although worktop replacement is asked for more. Same template visit, same workshop, same installers either way. Extension work runs late far more often than it runs early, and the worktop is close to the last thing in, so the date agreed at the start is rarely the date that happens. The fitting day is scheduled to suit that rather than to suit the diary. The annexe and the main kitchen go in together. Where a family has been living around a building site for months, the finish date carries more weight than any other part of the specification. Where the window is fixed there is no second day to fall back on, so the prep list matters more than usual. One kitchen out of use, never the whole house.

05

What decides the price of a worktop in Hampton Wick?

Handles on opposing runs meet in the middle of the aisle, so a deep edge profile specified on both sides takes width out of the standing space twice over. On the day that means dry-laying the whole layout first and only then pulling and bonding the joins. Dry-lay first, always. Expect £110 to £550 per square metre for material supply only, with templating, fabrication and fitting on their own lines.

06

What do I need to sort out first?

Plaster thickness varies over the height of a wall, so the line at worktop height is not the line at skirting level, and the units decide which one matters. The back edge is eased in progressively rather than offered up once and forced. The last hundred millimetres decide how it reads. Clear the full hall and stairs route of furniture, bikes, coats and stair-gates, and keep the front door propped and unobstructed for the carry. Flats bought out of managed stock keep the original kitchen dimensions long after the ownership changed, so the layout says very little about who is paying for the work. The fitting day is arranged with whoever can actually give us access for the whole slot. A void between tenancies has no spare days in it.

07

Which materials need sealing and which do not?

Bleach and limescale remover harm a polished finish rather than clean it, whichever material is on the units. Granite is porous to varying degrees, so it is sealed when we fit it and topped up over the life of the worktop. Marble is the one people underestimate. It is porous, like granite, and wants sealing. There is no back addition on these, so the kitchen is the original rear room and the run is one wall long with a door at each end of it. Scribing takes longer than the carry does, so the quiet half of the day is the half that runs over. The age of the house sets the pace of it.

08

What happens once you have templated in Hampton Wick?

Between the template and the fit the slab is nested, cut, mitred and dry-assembled on the bench, which is work you never see and is most of the wait. On the fitting day floors and door frames are protected, joins clamped flush, sink and hob sealed. A cast iron soil stack runs down the outside of the rear wall, so moving the sink means a fresh penetration through solid brick. The fitting day is planned backwards from all of it, before the first piece comes off the van. Access, floor and wall in that order, then stone.

09

What if the base units are out of level?

The check comes before the measuring rather than after, because the whole drawing is set out from that plane. Small variation is taken up by packing under the top on the fitting day. Levelling belongs in the carcasses, on their own legs and packers. Two walls each a degree out give an internal corner two degrees out, and the whole of that error lands in the mitre. It adds an hour or two to the day, and that time sits in the schedule rather than being taken out of the finishing. If it will not drop in, it goes back out to the saw.

10

How do you cut out for an undermounted sink?

We seat and seal the sink and hob on the day; water, waste, gas and electrics are for your plumber and electrician. A sit-on sink and an undermounted one are different cut-outs, so which it is gets settled before the template. If the sink or hob changes after the template, the drawing changes first and nothing is cut meanwhile. Older houses put the boiler or the meter on one of the two walls, and whatever is boxed in around it sets the point where that run has to stop. A layout that has been packed and levelled run by run instead of to one datum shows as a step where two pieces meet. Nothing is bonded until the whole run sits flat.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Lovely team, business and quality motivated, prompt delivery with installation. Affordable prices. Wide range of worktops available. High recommendation”
Loreta SkalisieneGoogle review
★★★★★
“Great service. Super quick and easy communication. I love my new worktop 🥹🥹”
Sara ArghirGoogle review
★★★★★
“Professional, polite and friendly service. Very pleased with finished product.”
costas andrewsGoogle review

Next step

Worktop installation in Hampton Wick, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.