Ealing · W7

Splashbacks and upstands in Hanwell

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

The same kitchen from the doorway, Arctic Starburst turning both corners past the induction hob to the tall units

Hanwell kitchens

The kitchens we meet in Hanwell

Where the splashback jobs in Hanwell get complicated is rarely the stone itself, and much more often the room the stone has to go into. Terraces with rear kitchen extensions and side-return infills, largely first proper renovations on a controlled budget. Runs of 3.5m to 4.5m, single-bowl undermount, quartz chosen over granite on price. The survey is the part where guessing stops. Everything after it is worked from real measurements taken in your own Hanwell kitchen.

The rear wall of the addition carries both the back door and the window, which leaves very little unbroken wall for a run to sit against. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Height is taken at the shortest point of the run.

A soil stack is strapped to the outside of the addition wall and its branch comes through low, which settles where the sink can go before any layout is drawn. A 100mm upstand bedded on silicone is the honest answer where the plaster bows, because it rides what a tall panel exposes. Height, returns and sockets, all settled on site.

On this patch the buildings are Victorian terrace, Edwardian terrace, 1930s semi and Hanwell village older stock. The differences between them show up at template, not at enquiry.

Worktop join finished flush against a wall
  • Victorian terrace
  • Edwardian terrace
  • 1930s semi
  • Hanwell village older stock

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.
Borough
Ealing
Postcodes
W7
Covered on
our west London run
Fitted
5–10 working days from template

The place

Why Hanwell is its own job

Stone is heavy, unforgiving and cut to a millimetre, so what governs a job in Hanwell is everything around it. The Uxbridge Road and the approaches to the viaduct congest badly, terraces have no driveways, and the streets near the station are permit-controlled. A lot of these terraces still have the original outside WC standing in the rear return, so the top has to stop and restart around it rather than run through. None of it stops the job. It changes how we plan it, and planning it is what the Hanwell visit is for.

The work

What worktop splashbacks & upstands involves

The decision belongs to the quotation stage rather than to the week after the kitchen is finished, because the stone for the wall is taken from the worktop order rather than bought again. These are templated after the worktop is fitted and settled, never before, so they scribe to the wall the worktop actually meets. Socket and switch positions need to be final first. You end up with the room finished. The wall was the last thing outstanding, so once these pieces are on there is nothing left waiting on another visit or another trade.

Behind a hob the choice of material stops being about looks: a resin-based surface will mark under sustained heat where a sintered one will not. Panels are offered up dry before any adhesive goes near them, and the scribe comes off the piece, never off the plaster. In a house this old the wall behind the run has been skimmed over lath in one bay and dot-and-dabbed onto brick in the next, and a tall sheet finds both. Machined to the room, not trimmed to it.

Corners and joins See the options

The money

What it costs in Hanwell

A full-height splashback costs more than an upstand for the obvious reason and one less obvious one: there is more to scribe and more to machine around. A side return gives length rather than width, so the runs are long, the joins are few and the slab has to be used efficiently. For a rough sense of the material, £110 to £550 per square metre supply only is the honest span. Treat it as one line of a quote that will carry several more. Priced by the edge and the openings, not the wall.

Victorian and Edwardian terraces

The carry, and what it rules out

A short lunchtime window of control exists to keep commuters off the street, and it still catches a trade van standing there for an hour. Full-height panels are the awkward thing to move, light enough to lift and long enough to flex on the way. A short bay slot is when the tall pieces get damaged.

Victorian and Edwardian terraces

What Hanwell asks for

This is not the commonest thing we do here. Worktop replacement and worktop installation come up more. It is a fact about the local building stock, not about the standard or the price of the work.

Victorian and Edwardian terraces

Hanwell in the housing figures

In Hanwell, the share standing before 1919 is among the larger ones in the capital. That is what decides between a slim upstand and full-height stone, more often than taste does. Nothing cut until the tiling decision is final.

Access

Getting stone into a Hanwell kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

West London patch

Hanwell is covered on our west London run, along with the rest of Ealing.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Hanwell

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you cover Hanwell?

Yes. Hanwell is on the patch, and the postcodes we work here are W7. It is worked on our west London run, along with the rest of Ealing. Where the nearest legal space is a couple of streets back, the walk with each piece becomes the job, and the crew is sized for walking rather than wheeling. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Kerb to kitchen is measured before the panels are unstrapped. You never have to visit anything or collect anything: we template in your kitchen and fit in your kitchen.

02

Is there anything about Hanwell buildings that catches worktop splashbacks & upstands out?

The original scullery gully is still live in the yard outside the back door, and new waste from the sink joins a drain laid for a copper and a stone sink. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. A hundred millimetres covers more than it looks. A room can be out of square in both directions at once, so the wall that leans is also the wall that runs downhill, and one scribe cannot answer both. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. A tall panel exposes what an upstand forgives.

03

What do you check about the route into a Hanwell property?

Every internal doorway on the way through is another frame to clear, and internal doors come off their hinges rather than being propped open. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. A vertical break is easier to live with than a cracked panel. Applying for a suspension means naming a length of kerb and a date, and moving the date generally means applying for it again. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. Wind on an open street matters more than the walk does.

04

Is Hanwell really a worktop splashbacks & upstands area?

Not really, and claiming otherwise would cost nothing and mean nothing. What the research on this patch actually lists is worktop replacement and worktop installation. It reflects the local housing rather than any difference in the work. It is quoted, cut and fitted here the same way it is anywhere else on the patch. Extension budgets are usually well spent by the time the worktop is ordered, which is where the choice between quartz and a thinner sintered stone actually gets made. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Upstands turn batch offcuts into finished rooms. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. The cheap way to make eight kitchens look specified.

05

Why do two Hanwell kitchens the same size price differently?

The wall between the original room and the return usually carries a steel, and the plaster line above it steps, so anything full height behind the run is measured separately from the top. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. A joint behind a tap is a joint on show. Supply-only material is £110 to £550 per square metre, and templating, fabrication and fitting are quoted separately rather than rolled in.

06

What has to be finished before you can template?

Plaster thickness varies over the height of a wall, so the line at worktop height is not the line at skirting level, and the units decide which one matters. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. Scribe the top edge too or it stands off. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. Whoever manages the block controls the lift booking, the bin store and the visitor parking, and none of that sits in the gift of the household whose kitchen it is. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Two attendances need two people to be in.

07

How many visits does a Hanwell worktop take?

The same firm templates and fits. Nobody else is brought in to install. The template produces a drawing, and the workshop cuts to that drawing once you agree it. The template is taken in your kitchen after the units are in and fixed, never before. Lower ground floor kitchens are reached by a stair with a winder in it, and the head height over that winder is lower than the room at either end. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. A chimney breast breaks a panel run regardless of the drawing.

08

What if a piece cracks while it is being carried in?

A remake goes back through the same cutting and polishing, so it is a return visit rather than a patch. The rest of the kitchen still goes in. One damaged piece does not hold up the pieces either side. Door frames and the stair route are protected too, since most contact happens on the way in. A pendant light hanging in the middle of a hall ceiling sets the angle a piece can be tilted to, and it is the measurement nobody thinks to take. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. Full height goes in only where the way in allows full height.

09

What happens to the worktop that comes off?

Old laminate is light and awkward rather than heavy, so it is usually the easier half of the day. Tiling bonded to the wall behind usually comes away with the old top, so that wall is agreed beforehand. Disposal means it goes in the van, not into the garden to wait for a collection. A suspension is charged by the bay and by the day, so the number of metres asked for is worth getting right the first time. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Standing a panel on the pavement is the last resort.

10

Can the price change after templating?

The quote is written from the template drawing. Before that it works from what you have described. Nothing is payable until the template, and the template measures the room as it stands rather than estimating from a plan. No installed price per square metre is published, because it is not a real number. Two walls each a degree out give an internal corner two degrees out, and the whole of that error lands in the mitre. It decides whether the run gets one continuous piece or a set of separate lengths with a joint at every obstruction. The sill caps the upstand before anything else does.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Great service. Super quick and easy communication. I love my new worktop 🥹🥹”
Sara ArghirGoogle review
★★★★★
“Professional, polite and friendly service. Very pleased with finished product.”
costas andrewsGoogle review
★★★★★
“I used Karem’s services 5 years ago for purchasing and fitting the quartz worktop in my then brand new kitchen. The price was reasonable and the service reliable and spot on, no delays in fitting, misunderstanding or excuses. I recommended him to a friend, who also used his services and they were happy too! If I need to order new kitchen work top again, I would definitely use him again. Thanks Karem!”
shoshencenceGoogle review · quartz

Next step

Splashbacks and upstands in Hanwell, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.