Homerton kitchens
The kitchens we meet in Homerton
Most of the questions we get about splashback jobs in Homerton are really questions about the kitchen itself, which is where any sensible answer has to start. Estate-heavy, with standard purpose-built kitchens of 2.4-2.8m and services fixed to one wall, alongside Victorian terraces with rear-addition kitchens. The newer flats near the hospital have compact open-plan runs with an integrated hob and little room for anything else. Photographs of the run and a rough length are usually enough for us to say which of those you are looking at.
A cast iron soil stack runs down the outside of the rear wall, so moving the sink means a fresh penetration through solid brick. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. A chimney breast breaks a panel run regardless of the drawing.
The addition wall is half a brick thick in places and has usually had a damp course injected and been re-plastered, which leaves it neither flat nor consistent. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. The plaster behind it is the real question.
The mix here is Victorian terrace, large post-war estate, 1970s low-rise and new-build apartment. Knowing which one it is before we arrive is half the survey done.