Skip to content

Croydon · CR0

Splashbacks and upstands in New Addington

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

New Addington kitchens

What the kitchens here are actually like

1930s-50s cottage estatepost-war terracelow-rise maisonette1990s regeneration housing

Blockwork with a hard render that has been patched over decades looks modern and behaves nothing like it. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. Siliconed to the top, never grouted.

A large planned estate with highly repetitive layouts: small rectangular kitchens of around 2.4-3m of run, a larder or broom cupboard in the corner, and a back door onto a rear garden. Nearly all work is replacing worn tops on existing units, with an upstand instead of tiles. Wide estate roads, grass verges you must not drive on, and long shared paths serving several front doors.

Walls look modern and are not: block or breeze with a skim that has been patched over decades, so dry-laying and scribing still apply. Patched plaster next to original render sits at different depths, and that step is exactly what an upstand covers. Decided before fabrication starts.

On these streets the housing is 1930s-50s cottage estate, post-war terrace, low-rise maisonette and 1990s regeneration housing. That mix is why two jobs on the same road can run completely differently.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered from the New Malden patch. Fitted 3–7 working days from template.

ex-local-authority flats and estates

Getting stone into the room

Maisonettes have external stairs with a handrail that limits how you can swing a piece.

Stone goes up on edge, and it is the half-landing turn rather than the flight itself that sets the maximum piece. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. It decides panel size before anything is cut.

ex-local-authority flats and estates

What gets asked for here

It is on the shortlist for this patch rather than at the top of it, because worktop replacement comes up more often. Nothing about the process differs between the two.

ex-local-authority flats and estates

The building, and what it does to the job

Because the house types repeat across the whole estate, once you have templated one kitchen you know the run length on the next, but you still template every one because previous owners have moved the back door.

Access

Getting stone into a New Addington kitchen

Wide estate roads, grass verges you must not drive on, and long shared paths serving several front doors. Maisonettes have external stairs with a handrail that limits how you can swing a piece.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

New Malden patch

New Addington is worked from our New Malden run, covering South West London & Surrey.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in New Addington

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you actually work in New Addington, or just list it?

Yes. New Addington is on the patch, and the postcodes we work here are CR0. It is run from the New Malden side, covering South West London & Surrey. Where the van can pull up level with the gate the pieces are handled the fewest times, which is what actually protects them. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. That is why they are crated the way they are. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

What is different about worktop splashbacks & upstands in New Addington?

Post-war terraces have a short straight hall to the kitchen, which is a good deal kinder than the houses they replaced. That step is exactly what an upstand covers and what a full-height panel exposes, so unless the wall is skimmed level end to end, a 100mm band is the reliable choice. Decided before fabrication starts. Because the house types repeat across the whole estate, once you have templated one kitchen you know the run length on the next, but you still template every one because previous owners have moved the back door.

Is access a problem in New Addington?

Wide estate roads, grass verges you must not drive on, and long shared paths serving several front doors. Maisonettes have external stairs with a handrail that limits how you can swing a piece. Stone goes up on edge, and it is the half-landing turn rather than the flight itself that sets the maximum piece. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. It decides panel size before anything is cut. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.

Is worktop splashbacks & upstands common in New Addington?

It is one of the three we do most here, behind worktop replacement. Same template visit, same workshop, same installers either way. Conversions put kitchens where the services could be made to reach rather than where they belong, so runs are short and interrupted. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Siliconed to the worktop, never grouted. A kitchen carved out of a larger room sits under whatever the original plan left behind, so the run frequently ends at a blocked doorway or a boxed-in service. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Siliconed to the worktop, never grouted.

What decides the price of a worktop in New Addington?

The catch with a galley is that both runs are seen end-on from the doorway, so any difference in overhang between the two reads immediately. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Joint placement is a decision, not an accident. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What do I need to sort out first?

Walls that bow along their length are the normal condition rather than the exception, and a straight-cut back edge will show a shadow gap at one end and touch at the other. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. An upstand rides what a panel exposes. Boiler position, flue and any pipework drops must be settled and the wall skimmed level before templating the splashback run. An owner living in the house makes the decisions and lives with them, so the specification tends to go towards the material rather than towards the lowest total. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. The wall has to be ready.

Next step

Splashbacks and upstands in New Addington, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7479 194398