Croydon · CR2

Splashbacks and upstands in Selsdon

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Induction hob set into an Enzo run below a full-height matching splashback, under the painted mantel canopy

Selsdon kitchens

The kitchens we meet in Selsdon

If you are weighing up splashback and upstand work in Selsdon, the first thing worth knowing is that the building decides more than the brochure does. Built largely as a 1930s estate, so the semis share a footprint with a small rear kitchen that is usually extended to the side or rear for a kitchen-diner with a peninsula. The detached houses on the higher roads run to proper islands and separate utilities. Either way, the next step is the same one: get someone out to look, and get the measurements written down.

A shallow bay or a squared-off rear window means the run beneath it is rarely the same depth at both ends. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. A return into a reveal is its own scribed piece.

A side alley and a back door mean most pieces go in whole, and it is the alley width rather than the front door that decides it. The ragged band left when old tiles and laminate come off together is what usually decides upstand over full height. Decided before fabrication starts.

The houses and blocks behind these jobs are 1930s estate semi, 1930s detached, post-war Selsdon Vale housing and bungalow. A quote that ignores which one you have is guessing.

Mitred waterfall edge detail on a quartz island
  • 1930s estate semi
  • 1930s detached
  • post-war Selsdon Vale housing
  • bungalow

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Edges are polished on every side that shows, including the top edge of an upstand.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
Borough
Croydon
Postcodes
CR2
Covered on
our south London run
Fitted
5–10 working days from template

The place

Why Selsdon is its own job

The difference between a smooth day in Selsdon and a wasted one is usually decided before we arrive. Wide inter-war roads with front drives and space to unload, but the ground rises steeply towards Selsdon Wood and some driveways climb hard from the kerb. Steep front drives here are the recurring nuisance, because a loaded trolley wants to run away downhill and we end up hand-carrying pieces we could otherwise wheel. It is all worked out on site in Selsdon, written down, and agreed with you before a single cut is made.

The work

What worktop splashbacks & upstands involves

Splashbacks and upstands put the same stone on the wall behind your worktop instead of tiles, which takes the grout line out of the kitchen. The height is settled first, since a slim upstand and a full sheet up to the wall units are different pieces of work and the wall between them is where the decision shows. You end up with a continuous run of stone from the worktop up, cut from the same slab batch so the colour matches where the two pieces meet.

A full-height sheet must live with everything already on that wall, the extractor and its bracket included, because it is machined to fit round them and cannot be eased afterwards. Internal corners are butt-jointed rather than mitred, and the vertical is put where the light does not rake across it. The old larder wall in these houses is a single skin with a bow through it, and a hand's width of stone hides what a tall sheet would advertise. Cut from the slab the worktop came out of.

Waterfall ends See the options

The money

What it costs in Selsdon

Cutting from the same slab run as the worktop is what keeps the colour matched, and ordering the two together is cheaper than ordering them apart. An island is a yield question before it is a design one: it either comes out of the same slab as the perimeter or it needs a second. Nothing about the £110 to £550 supply range changes once the template is done. What the template settles is the piece count and the operations, and that is where the figure firms up. Quoted as its own item, so the grout line has a price.

ex-local-authority flats and estates

What Selsdon asks for

The research on this patch does not put this among the three commonest jobs. Worktop installation do. That changes how often we are here, not how the work is done.

ex-local-authority flats and estates

Selsdon in the housing figures

In this neighbourhood renting is the minority arrangement. The rooms therefore start closer to true than in most of London. An upstand survives a change of tenant; full-height stone is a longer bet on the same wall. The stone follows the wall, not the other way round.

ex-local-authority flats and estates

The shape of the run

A downdraught extractor takes a long slot out of the middle of the piece and a motor housing out of the cabinet below it, so what sits under the top is settled before anything is cut. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Return ends are polished, not left sawn.

Access

Getting stone into a Selsdon kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South London patch

Selsdon is covered on our south London run, along with the rest of Croydon.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Selsdon

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Is Selsdon far enough out to be a problem for you?

Yes. Selsdon is on the patch, and the postcodes we work here are CR2. It is worked on our south London run, along with the rest of Croydon. Off-street parking means the van stays put all day, so tools, packers and the offcut we would rather have than not are all within reach. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Where the van has to move, the panels come in first. Template and fit both happen at the property, so there is nothing to drive to and nothing to collect.

02

What do the kitchens in Selsdon do to worktop splashbacks & upstands?

The chimney breast in the corner has usually been left in place, so the run gains a return and two scribed ends. These kitchens are nearly always retiled at least twice, and stripping the old tiles takes the bottom course of plaster with it because the original laminate top ran underneath the tiles rather than up to them. Height, returns and sockets, all settled on site. An alcove is commonly wider at the back than at the front, so a piece cut to the opening drops in and then stands off the rear wall. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Height follows the sill, not the plan.

03

Do you have trouble getting long pieces into Selsdon kitchens?

Where the van stands level with the front of the house a piece gets handled twice instead of five times, and stone breaks on handling rather than on the road. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Panel size is checked against the tightest point rather than the average one. A drive that shelves towards the house needs the van chocked and the trolley controlled, since a loaded A-frame gathers speed quickly on a slope. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. A panel carried past a live lane gets a second pair of hands.

04

Does Selsdon actually ask for worktop splashbacks & upstands?

Not particularly. It would be easy to say yes and leave it there. What the research on this patch actually lists is worktop installation. That is about what people have here rather than how it gets done. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Full height behind the hob is less for a tenant to scrub. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Grout lines are the first thing to fail in a let.

05

What decides the price of a worktop in Selsdon?

Power and waste come up through the floor, and where they surface decides which cabinet can hold a sink and which one cannot. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Panel widths answer to the slab before the wall. Material runs £110 to £550 per square metre supply only, and templating, fabrication and fitting each get their own line.

06

What do I need to sort out first?

The face of a breast is rarely flat, and a top returning onto it picks up that bow across the last few hundred millimetres of its length. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Scribed along the top edge as well. The old tiling must be off and the wall made good and dry before templating, not on fitting day. The decision usually gets made standing in the room rather than at a desk, which is why a slab is worth viewing whole instead of choosing from a sample card. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Whoever specifies it signs the drawing.

07

What if the base units are out of level?

Stone does not flex, so a run that rocks on its carcasses rocks just as badly once it is stone. Units have to be fixed down as well as levelled. A loose carcass moves under stone. An island is where this usually shows, standing free with no wall to level against. Old breasts carry a bulge low down where the original opening was closed up, and the units stand off it before the stone is measured at all. It decides whether the run gets one continuous piece or a set of separate lengths with a joint at every obstruction. The obstruction breaks the length, every time.

08

How do you cut out for an undermounted sink?

If the sink or hob changes after the template, the drawing changes first and nothing is cut meanwhile. Where the hob lands is set out against the units and the wall behind, not off the kitchen plan. The tap hole is drilled in the workshop too, and its position depends on how far the tap has to swing. A hob cut-out and the floor penetration feeding it have to land over the same cabinet, and where they do not it is the stone that gets redrawn rather than the pipework. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. Vein direction carries up from the top below.

09

What if the stone cannot get up the stairs in a Selsdon flat?

The carry route is measured before anything is cut, so a piece that will not make the turn is split at the drawing stage rather than discovered on the day. Splitting a run costs a join, and that is the price of getting stone into the room at all. Even an easy kerbside carry wants the pavement clear at the tail lift, because a three-metre piece on edge has a swing radius nobody expects until it is swinging. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. They come in last so nothing is carried past them.

10

Is a full-height splashback practical in a Selsdon kitchen?

Tiling and stone can meet, but where they meet is decided before the template rather than after. Upstand or splashback, the stone is cut from the same slab run as the worktop, at the same time, so the batch actually matches. An upstand covers the gap where the worktop meets a wall that is not flat, which is its real job. These kitchens have been retiled at least twice, and stripping the tiles takes the bottom band of plaster with them because the old laminate ran underneath rather than up to them. That leaves a ragged band right where the upstand has to sit, which is fine for a 100mm upstand that covers it, but a full-height splashback needs the wall made good first or it will rock on the high spots. A hundred millimetres covers more than it looks.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Karem did an excellent job on my kitchen. He was professional, reliable, and paid great attention to detail. The finish looks amazing and has completely transformed my kitchen. Thank you! Would highly recommend his work!”
Catalina RaduGoogle review
★★★★★
“Excellent work and highly recommend. Very professional and did an outstanding job with my worktop. Karem responded very quickly and swiftly, top guy!”
Faisal KGoogle review
★★★★★
“Perfect service,the best on this job”
Kleant IstrefiGoogle review

Next step

Splashbacks and upstands in Selsdon, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.