Southwark · SE15

Worktop installation in Nunhead

Fitting day: protected route, back edges scribed to the real wall line, joins pulled flush, sink and hob sealed.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

Nunhead kitchens

The kitchens we meet in Nunhead

Worktop installation in Nunhead is not one job repeated, because the kitchens here are not one kind of kitchen. Smaller artisan Victorian terraces where the original kitchen is a cramped closet wing - the standard upgrade is a modest rear extension giving a straight 3m run plus a 1.2m return, with a peninsula instead of an island because the room is not wide enough for both. The drawing we work from is agreed with you first, so no one in Nunhead finds out on fitting day that something was assumed.

Chimney breasts are often taken out at ground level and left standing above, so the middle of the run is newer wall than the two ends of it. The fitting day is planned backwards from all of it, before the first piece comes off the van. Old plaster gets scribed to, never fought with.

Where a side return has been infilled, the join between old brick and new blockwork lands mid-run and the two faces are never in one plane. Pieces are stood on edge for the turns and carried flat for the straights, and that sequence is agreed before anything comes off the van. What the building will take decides how it is fixed.

What we are measuring in, mostly, is Victorian two-up two-down, Victorian terrace, 1950s council rebuild and interwar semi. The template reads them differently even where the layout looks identical.

Polished stone edge profile close up
  • Victorian two-up two-down
  • Victorian terrace
  • 1950s council rebuild
  • interwar semi

True everywhere

Worktop installation, in short

  • One visit. A straightforward run is a morning; an island and splashbacks take most of the day.
  • The installers are ours, on our payroll, rather than a crew booked in for the day.
  • A granite top is treated with sealer on the day it goes down.
  • Workmanship is guaranteed for five years, the material for 25.
Borough
Southwark
Postcodes
SE15
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Nunhead is its own job

A quote for Nunhead that ignores how the slab gets in is a quote that will change on the day. Steeply graded streets running up towards the cemetery, narrow carriageways with parking both sides, and a lot of houses with a side alley too narrow for a slab trolley, so it is a front-door carry. Rooms here are frequently under 2.4m wide, so the client has to be talked out of an island early or the walkways end up under 900mm. Far better to find it in Nunhead with a tape measure in our hands than on the day the slab arrives.

The work

What worktop installation involves

Installation is quoted on its own line, separately from the stone, so you can see what the fitting day costs rather than reading it off a rate per square metre. The run is set out from a fixed point, a corner or the wall the sink sits against, and worked outward, so what tolerance the room has ends up at the open end where it can be absorbed. You end up with a surface that is level along its length because the carcasses under it were brought level first, not one sitting on packers that will work loose in time.

The whole run is dry-laid before anything is fixed, so the levels, the wall line and the joins are all agreed while they can still be changed. Anything found on the day that changes the job is raised before it is fixed, not itemised afterwards. Floors that have settled over a century mean the units are shimmed to a level the room does not have, and the worktop follows the units. The room is left clean and the offcuts go with us.

Edge profiles See the options

The money

What it costs in Nunhead

Two identical kitchens fit at different prices when one is up a stairwell and the other is through a back door. The island is normally the largest single piece in the kitchen, which makes it the piece that sets the carry and sometimes the price. The supply band of £110 to £550 per square metre is known the day you choose a colour. What is not known until the template is the piece count and the number of cut-outs. Hands and hours, both stated.

Victorian and Edwardian terraces

The building, and what it does to the job

A floor that falls across the depth of a run rather than along it tips the carcasses front to back, and packing the front feet changes the overhang while it fixes the level. The piece is offered up, marked, taken back out and cut, and that cycle can run twice before anything is bonded down. The scribe is cut on site or it is not cut.

Victorian and Edwardian terraces

Nunhead in the housing figures

Across this patch the council tax banding sits at the bottom of the London range. There is no standard inter-war plan to work from. An island lands last and needs a clear floor around it, which sets the order of everything else. One team from the van to the seal.

Victorian and Edwardian terraces

What Nunhead asks for

The stock here generates this before it generates worktop replacement.

Access

Getting stone into a Nunhead kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Nunhead is covered on our south east London run, along with the rest of Southwark.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Nunhead

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Are you set up to work in Nunhead, or is it a subcontractor?

Yes. Nunhead is on the patch, and the postcodes we work here are SE15. It is worked on our south east London run, along with the rest of Southwark. On a street with no restrictions the constraint is other residents rather than a warden, so it is worth putting a cone or a car out early. The fitting slot is set around it, which is why we ask about it when the date is booked and not before we leave the yard. A spotter on the van is a man off the tools. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

02

What is different about worktop installation in Nunhead?

A semi has a side passage, and whether it is wide enough to carry a piece flat and turn it in at the back door is the first thing worth measuring. We measure the front door, the hall width and the turn into the kitchen before anything comes off the van, because a 3m piece has to swing through that corner on edge and stone does not bend to help you. The age of the house sets the pace of it. Once the carcasses are levelled the gap under the plinth varies along the run, and that varying gap is the honest record of what the floor is doing. On the day it means dry-laying, marking, and cutting the scribe on site before anything is bonded. Carcasses get packed level before anything is offered up.

03

Is access a problem in Nunhead?

The side passage is the measurement that matters, because a piece has to be carried flat down it and then turned in at the back door, and the turn is always tighter than the passage. Finding it out on the morning costs the whole slot, because there is no second route to fall back on. Protection goes down along it first. A free-parking street with cars both sides can still leave the van forty metres away, and that distance is carry, not driving. A van that has to move mid-fit costs the best part of an hour and takes a man off the tools to do it. Camera enforcement does not take an explanation.

04

Is Nunhead mostly worktop installation work for you?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop replacement. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Where the window is fixed there is no second day to fall back on, so the prep list matters more than usual. The prep list is not optional. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. One visit, with the sink and hob seated and sealed before we leave. Sealed before we leave.

05

What makes one Nunhead kitchen dearer than the next?

Waterfall ends are cut in sequence off the length either side of the top so the vein carries down the leg, and that sequence is gone the moment a piece has to be recut. On the day that means dry-laying the whole layout first and only then pulling and bonding the joins. Support first, stone second. Material sits between £110 and £550 per square metre supply only, and templating, fabrication and fitting are quoted line by line.

06

What holds a template up more often than anything else?

A wall line that runs level over a floor that does not means the finish closes up on the plinth at one end, which is joinery rather than something the stone can answer. Rushing that is what leaves a gap you look at every morning for fifteen years. A forced back edge cracks weeks later. Clear the full hall and stairs route of furniture, bikes, coats and stair-gates, and keep the front door propped and unobstructed for the carry. Where a landlord or housing provider is involved there is a specification to meet and a process to follow, and both are settled before a date is offered. The fitting day is arranged with whoever can actually give us access for the whole slot. A void between tenancies has no spare days in it.

07

Is templating a separate visit from fitting?

The same firm templates and fits. Nobody else is brought in to install. On the fitting day floors and door frames are protected, joins clamped flush, sink and hob sealed. The fitting itself is one visit: a plain run is a morning, an island with splashbacks takes most of the day. An under-stairs cupboard eats one end of most of these kitchens, and the run stops at a door that has to keep opening. Almost everything that makes a fitting day hard is a property of the building rather than of the stone. Two lifts and a turn make it a four-man piece.

08

Will I have to look after it? What does a Nunhead worktop need?

Day to day all three want soap and water; abrasive creams and scouring pads are what dull a polished surface. Topping a seal up is a wipe-on job with a cloth. Where a top takes wine, oil and lemon most days, the non-porous materials ask least of the household. The rear room is generous with a chimney breast in one corner, so the run gains a return and two scribed ends whatever the plan drew. Scribing takes longer than the carry does, so the quiet half of the day is the half that runs over. Walked, measured, protected, then lifted.

09

How many joins will a Nunhead kitchen need?

A join cannot cross a cut-out, so a sink mid-run takes away the position you would have used. What you get is a line rather than a step, because the pieces are levelled to each other first. An island often runs in one piece where a wall run cannot. Everything on an island is fed from underneath, extraction, a socket run, a hob and sometimes a waste, and each of them wants its hole before the top is bonded down. A layout that has been packed and levelled run by run instead of to one datum shows as a step where two pieces meet. The laying order follows the shape.

10

Can I have grooves instead of a separate drainer in Nunhead?

The bowl position has to be settled before templating, since the grooves are set out from it. Grooves are machined in the workshop at the same time as the bowl cut-out, because they cannot be done well in a kitchen. Nothing in a house of this age is square, and the kitchen is usually the part that has been altered most often. Protection down, dry-lay, scribe, then bond: the order matters more in a difficult room than an easy one. Suction pads will not hold on a wet or dusty face.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“I recently had my kitchen worktop and splashback done by Karem from Worktop WorX and i am very pleased with the result. From the initial consultation and measurements to the final installation, the whole process was smooth and professional. The attention for details and the quality made the difference and everything was finished to a high standard. I definitely recommend Worktop WorX to anyone looking for reliable and high quality kitchen work”
Alexandru BalintGoogle review
★★★★★
“Really impressed with the quality and finish of these worktops. Great range of materials, precise fabrication, and smooth communication throughout. The whole process was easy and the final result looks fantastic. Highly recommend!”
Nastasia DragoGoogle review
★★★★★
“We installed new kitchen and got the worktop and splash back from them. Their professional work and commitment was wonderful. Quality of work compared to price was way too good. Thank you guys.”
MD Matinur RahmanGoogle review

Next step

Worktop installation in Nunhead, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.