Southwark · SE15

Splashbacks and upstands in Nunhead

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Arctic Starburst carried round a U-shaped kitchen in pale grey handleless units, pendants over the breakfast bar

Nunhead kitchens

The kitchens we meet in Nunhead

Nearly all the splashback jobs we quote in Nunhead start with the same conversation about what is already in the kitchen and what is staying. Smaller artisan Victorian terraces where the original kitchen is a cramped closet wing - the standard upgrade is a modest rear extension giving a straight 3m run plus a 1.2m return, with a peninsula instead of an island because the room is not wide enough for both. You can leave that to us. What we need from you is a rough idea of the size and a date that suits.

Lower ground floor kitchens are reached by a stair with a winder in it, and the head height over that winder is lower than the room at either end. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. Siliconed to the top, never grouted.

These were built with a scullery that has since been swallowed by an extension, leaving a change of floor level roughly where the run crosses. Where an upstand meets a window reveal the return is mitred rather than butted, so the joint does not open as the wall moves. Blown plaster comes off before stone goes on.

Most of what we quote on here is Victorian two-up two-down, Victorian terrace, 1950s council rebuild and interwar semi. Each of those behaves differently once the old top comes off.

Worktop join finished flush against a wall
  • Victorian two-up two-down
  • Victorian terrace
  • 1950s council rebuild
  • interwar semi

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Upstands are small pieces, so they usually come out of the offcut the worktop leaves.
  • Dekton and sintered stone are stable in heat and daylight, which is why they suit a wall behind a hob.
  • A wide wall takes more than one piece, because slab width is finite.
Borough
Southwark
Postcodes
SE15
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Nunhead is its own job

There is nothing clever about a fit in Nunhead going smoothly, only a survey that asked the right things beforehand. Steeply graded streets running up towards the cemetery, narrow carriageways with parking both sides, and a lot of houses with a side alley too narrow for a slab trolley, so it is a front-door carry. Rooms here are frequently under 2.4m wide, so the client has to be talked out of an island early or the walkways end up under 900mm. A plan on paper will not tell you any of it. A tape measure in the room will.

The work

What worktop splashbacks & upstands involves

The decision belongs to the quotation stage rather than to the week after the kitchen is finished, because the stone for the wall is taken from the worktop order rather than bought again. Because the tops are already in, the kitchen stays in use around this stage. It is a return visit rather than another day of the room being unavailable. You end up with a joint that stays closed. It is siliconed rather than filled hard, so the wall and the surface can move against each other without opening a crack.

Splashbacks and upstands are the part of the job that takes the grout line out of the kitchen, which is what most people are really asking for when they ask about stone behind the hob. A window sill sitting lower than the surface settles the argument on its own: the strip runs into the reveal, returns, and the wall above is left alone. A rear extension often puts the sink under a window whose sill is barely clear of the surface, and that settles the height before anyone gets a say. Cut from the slab the worktop came out of.

Corners and joins See the options

The money

What it costs in Nunhead

Cutting from the same slab run as the worktop is what keeps the colour matched, and ordering the two together is cheaper than ordering them apart. The island is normally the largest single piece in the kitchen, which makes it the piece that sets the carry and sometimes the price. Thickness, finish and colour move a slab within the £110 to £550 supply band before anyone touches it, so that figure is settled by what you pick rather than by the room. Quoted as its own item, so the grout line has a price.

Victorian and Edwardian terraces

Nunhead in the housing figures

Around here upper-band homes are rare in the stock. Every room starts from scratch as a result. Ordered later, from a different batch, the match is not reliable where the pieces meet. Nothing cut until the tiling decision is final.

Victorian and Edwardian terraces

What Nunhead asks for

Honestly, this is not what we do most on this patch. Worktop installation and worktop replacement come up more often. That is a statement about the local housing rather than about the work, and nothing about how it is quoted, cut or fitted changes because of it.

Victorian and Edwardian terraces

The shape of the run

A pop-up socket in the surface is one more cut-out through the full thickness, and it wants the same clear space beneath it that a sink does. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Window reveals take a piece of their own.

Access

Getting stone into a Nunhead kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Nunhead is covered on our south east London run, along with the rest of Southwark.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Nunhead

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do your own fitters come out to Nunhead?

Yes. Nunhead is on the patch, and the postcodes we work here are SE15. It is worked on our south east London run, along with the rest of Southwark. A free-parking street with cars both sides can still leave the van forty metres away, and that distance is carry, not driving. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Where the van has to move, the panels come in first. The measuring and the fitting are both done at the property, so there is nothing to visit or collect.

02

What is different about worktop splashbacks & upstands in Nunhead?

The rear room has a bay or a wide window onto the garden, so the sink length is short and the real working length is on the return. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. The wall build-up sets the depth of the return. A floor that falls across the depth of a run rather than along it tips the carcasses front to back, and packing the front feet changes the overhang while it fixes the level. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. The sill caps the upstand before anything else does.

03

Is access a problem in Nunhead?

Rear access usually lets us fit longer pieces whole, so the join count ends up decided by the slab rather than by the building. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. A tall panel cannot be tilted to clear a turn, so it is sized not to need to. Where the van can pull up level with the gate the pieces are handled the fewest times, which is what actually protects them. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. A panel carried past a live lane gets a second pair of hands.

04

Would you call Nunhead a worktop splashbacks & upstands area?

Not especially, and pretending otherwise would be simple enough. What the research on this patch actually lists is worktop installation and worktop replacement. It is a fact about the local housing rather than about the work. The job is quoted, cut and fitted the same way wherever on the patch it lands. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. The offcuts finish the room. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Less to clean, for whoever cleans it.

05

What makes one Nunhead kitchen dearer than the next?

On a book-matched pair the halves are laid out so the mirror line runs down the length of the piece, and once that line is set the top cannot be turned round to suit anything else. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. The seam sits in shadow or it sits in a corner. Material alone is £110 to £550 per square metre, and templating, fabrication and fitting are never folded into that figure.

06

What holds a template up more often than anything else?

Once the carcasses are levelled the gap under the plinth varies along the run, and that varying gap is the honest record of what the floor is doing. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. A downstand sets the panel height, not the wall units. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. Consent for the work sits with the freeholder or the managing body, and getting it in writing first avoids a crew arriving to a locked door. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Deferred is workable; undecided is not.

07

Is templating a separate visit from fitting?

Templating and fitting are two visits, not one, and the gap between them is when the stone is actually cut. The fit follows 5 to 10 working days after the template, and nothing is cut before that visit because nothing is cut from a plan. A cast iron soil stack runs down the outside of the rear wall, so moving the sink means a fresh penetration through solid brick. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. The flatter the wall, the taller the stone.

08

Do you take the old worktop away?

Disposal means it goes in the van, not into the garden to wait for a collection. The template can be taken with the old top still down, which is why one visit covers both. The units below stay exactly as they are; only the surface is replaced. Unrestricted does not mean empty, and a street that is clear at seven is usually full by nine. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Nothing this long gets walked while a warden is circling.

09

The floor in my Nunhead kitchen slopes. Does that matter?

Units have to be fixed down as well as levelled. A loose carcass moves under stone. Units have to be fitted, fixed and level before templating, and it is better to hear that at the template than on the fitting day. Levelling belongs in the carcasses, on their own legs and packers. A wall line that runs level over a floor that does not means the finish closes up on the plinth at one end, which is joinery rather than something the stone can answer. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. Behind the boxing it becomes two pieces.

10

Will you fit a worktop I have bought myself?

How the slab has been stored is worth telling us, because stone kept flat is not stone off a rack. Order is what matters: a slab is templated before it is cut, so an uncut slab is straightforward and one already machined for another kitchen is not. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Upstands are the cheapest way to finish several kitchens consistently, and they come out of the offcuts the tops leave behind. Panels for every unit, cut in one go.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Excellent work and highly recommend. Very professional and did an outstanding job with my worktop. Karem responded very quickly and swiftly, top guy!”
Faisal KGoogle review
★★★★★
“Perfect service,the best on this job”
Kleant IstrefiGoogle review
★★★★★
“I recently had my kitchen worktop and splashback done by Karem from Worktop WorX and i am very pleased with the result. From the initial consultation and measurements to the final installation, the whole process was smooth and professional. The attention for details and the quality made the difference and everything was finished to a high standard. I definitely recommend Worktop WorX to anyone looking for reliable and high quality kitchen work”
Alexandru BalintGoogle review

Next step

Splashbacks and upstands in Nunhead, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.