Southwark · SE1 SE15

Splashbacks and upstands in Old Kent Road

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Arctic Starburst carried round a U-shaped kitchen in pale grey handleless units, pendants over the breakfast bar

Old Kent Road kitchens

The kitchens we meet in Old Kent Road

Most of the questions we get about splashback jobs in Old Kent Road are really questions about the kitchen itself, which is where any sensible answer has to start. The corridor itself is filling with new tall blocks whose kitchens are a single compact run in an open-plan living space, while the terraced streets set back behind it have modest rear kitchens, often with a lean-to extension of 2.5m to 3m across the back. A worktop that fits is a worktop that was measured. The description is background, the template is the actual instruction.

The room is square, the walls are plumb and the floor is flat, so almost every complication in the job belongs to the building rather than the kitchen. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. A return into a reveal is its own scribed piece.

Every flat on the floor is the same plan handed left and right, so the room is predictable even where the building is not. Where the run passes a boxed stack the panel breaks into returns, and each return gets a mitred external corner. A hundred millimetres covers more than it looks.

Locally the mix runs to Victorian terrace, 1960s and 1970s estate and 2020s regeneration tower. Each of those behaves differently once the old top comes off.

Worktop join finished flush against a wall
  • Victorian terrace
  • 1960s and 1970s estate
  • 2020s regeneration tower

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Dekton and sintered stone are stable in heat and daylight, which is why they suit a wall behind a hob.
  • A wide wall takes more than one piece, because slab width is finite.
  • The same fitters who install the worktop put the stone on the wall.
Borough
Southwark
Postcodes
SE1, SE15
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Old Kent Road is its own job

The questions we ask about a job in Old Kent Road are about the route, the doorways and the walls, not about the finish. The road is a red route with continuous traffic and no stopping, so every job is worked from the side streets, and new blocks add gated basement parking with limited headroom. New-build handover kitchens here come with 20mm composite that is already chipped at the sink cutout, so replacement is usually about matching an existing sink and tap footprint. We template Old Kent Road kitchens after the units are in and levelled, which is the only point at which the real measurements exist.

The work

What worktop splashbacks & upstands involves

The decision belongs to the quotation stage rather than to the week after the kitchen is finished, because the stone for the wall is taken from the worktop order rather than bought again. These are templated after the worktop is fitted and settled, never before, so they scribe to the wall the worktop actually meets. Socket and switch positions need to be final first. You end up with a run of stone that reads as one decision rather than two, because the wall and the surface were drawn, machined and fitted as parts of the same job.

The panels are machined at the works and arrive finished, so nothing about them can be persuaded into place with a grinder on the day. Openings in a tall sheet are given a radiused internal corner rather than a square one, because a sharp internal corner in thin material is where a crack begins. Walls in these flats are plasterboard on metal studs, so anything above a strip is carried by the worktop and the adhesive rather than by the partition. The panel clears the extractor before it is machined.

Corners and joins See the options

The money

What it costs in Old Kent Road

It is priced as its own item so you can see what removing the grout line actually costs before deciding. In a galley the runs are short and the cut-outs are close together, so the fixed operations carry more of the total than the stone does. The catalogue starts at £110 per square metre at the plainest end and reaches £550 at the top, supply only, with the same fabrication work sitting behind either choice. The cut-outs are counted, not estimated.

Victorian and Edwardian terraces

Old Kent Road in the housing figures

In this corner of the borough, owner-occupation is well below the London average. A short run leaves nowhere to hide a join. Whether it is stone or tile is usually a budget decision made by someone who will never see the room. The joint line is planned, not discovered.

Victorian and Edwardian terraces

What Old Kent Road asks for

It is on the shortlist for this patch rather than at the top of it, because worktop replacement comes up more often. Nothing about the process differs between the two.

Victorian and Edwardian terraces

The carry, and what it rules out

Where a marked loading box sits on the red route the stop is legal but timed, so the unload runs as one movement with every hand on it. Full-height panels are the awkward thing to move, light enough to lift and long enough to flex on the way. The longer the walk, the fewer the panels per trip.

Access

Getting stone into an Old Kent Road kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Old Kent Road is covered on our south east London run, along with the rest of Southwark.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Old Kent Road

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you cover Old Kent Road?

Yes. Old Kent Road is on the patch, and the postcodes we work here are SE1, SE15. It is worked on our south east London run, along with the rest of Southwark. A bus lane along the frontage brings its own hours with it, and stopping in one is enforced the same way the red route is. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. A narrow gap between parked cars decides how a panel turns. The measuring and the fitting are both done at the property, so there is nothing to visit or collect.

02

Why would worktop splashbacks & upstands in Old Kent Road be any different from anywhere else?

The room is genuinely square and the units are plumb, so the visit is more about the building than about the kitchen. The plasterboard is genuinely flat here, so a full-height splashback sits well and a slim upstand looks almost redundant, but the sockets are the problem, because they are set out to the developer's original kitchen and often land at odd heights or right on a joint line. A bowed wall is what decides between an upstand and a panel. The stone carries the scribe because the wall cannot be persuaded, so back edges are cut oversize and eased in rather than dropped straight down. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. A bowed wall shows on a panel and hides under an upstand.

03

What is the carry like in Old Kent Road?

Bollards, planters and a one-way service road can turn what looks like a ten-metre carry into a fifty-metre one. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. The panel is sized to the turn, not to the wall alone. The van is not staying on a main road for the day, so once the stone is off it goes and parks properly somewhere else. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. These travel flat and get carried on edge, and both want room.

04

Does worktop splashbacks & upstands come up often in Old Kent Road?

It is one of the three we do most here, behind worktop replacement. Whichever it is, the template and the fitters do not change. Buyers upgrading before handover work to a choices deadline set by the sales office rather than by the build programme. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Same batch, or the join will say so. Developer-fitted kitchens come with thin cam-lock carcasses, which are fine under laminate and want bracing before stone goes on them. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Ordered together, or the match is luck.

05

Where does the money go on an Old Kent Road worktop?

A galley puts the sink on one side and the hob on the other, which spreads the cut-outs across two pieces instead of weakening one. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Vein direction carries up from the top below. Supply only, material is £110 to £550 per square metre, with templating, fabrication and fitting quoted on their own lines.

06

What needs to be ready before you come to Old Kent Road?

A room can be out of square in both directions at once, so the wall that leans is also the wall that runs downhill, and one scribe cannot answer both. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. Mitred returns come from one place in the slab. Any socket you intend to move must be moved and re-plastered before templating, because a cut-out in the wrong place means a new piece of stone. The same building type can arrive as a careful one-off kitchen or as a fast turnaround, and the honest answer is that they are priced differently. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Priced on its own line so it can be deferred.

07

What happens to the worktop that comes off?

On a replacement the old top comes off in the morning and the new stone is down and sealed the same day. The tap and waste have to be disconnected by a plumber before we start and reconnected once the stone is in. The units below stay exactly as they are; only the surface is replaced. A red route means no stopping, and no stopping means exactly that, so the stone comes in from a side street or from a bay behind the property. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Where the van has to move, the panels come in first.

08

What is not included in the quoted figure?

Taking the old tops away is a line rather than an assumption, so it comes off if you do not want it. Nothing is payable until the template, and the template measures the room as it stands rather than estimating from a plan. Plumbing, gas and electrical work are not in the figure, because we do not do them. Plaster thickness varies over the height of a wall, so the line at worktop height is not the line at skirting level, and the units decide which one matters. It decides whether the run gets one continuous piece or a set of separate lengths with a joint at every obstruction. The pier takes a joint against it, not across it.

09

What happens if a piece will not go up the stairs?

Where there is a lift, whether it can be booked out and padded matters as much as its size. Splitting a run costs a join, and that is the price of getting stone into the room at all. Hoisting through a window is occasionally the answer, and it is a decision made at the template, not improvised on the fitting day. The barrier, the entry code and the estate rules decide when a van can get near the door, and none of that is negotiable on the day. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. It travels on edge, so the clearance is checked on edge.

10

Are hob and sink cut-outs priced separately on an Old Kent Road quote?

Two bowls means two cut-outs and a bridge of stone between them, which decides where the sink can go. A piece with a bowl and a hob cut into it is the fragile one, and it is handled accordingly. The catch with a galley is that both runs are seen end-on from the doorway, so any difference in overhang between the two reads immediately. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Behind an island there is no wall to hide against.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“I recently had my kitchen worktop and splashback done by Karem from Worktop WorX and i am very pleased with the result. From the initial consultation and measurements to the final installation, the whole process was smooth and professional. The attention for details and the quality made the difference and everything was finished to a high standard. I definitely recommend Worktop WorX to anyone looking for reliable and high quality kitchen work”
Alexandru BalintGoogle review
★★★★★
“Really impressed with the quality and finish of these worktops. Great range of materials, precise fabrication, and smooth communication throughout. The whole process was easy and the final result looks fantastic. Highly recommend!”
Nastasia DragoGoogle review
★★★★★
“We installed new kitchen and got the worktop and splash back from them. Their professional work and commitment was wonderful. Quality of work compared to price was way too good. Thank you guys.”
MD Matinur RahmanGoogle review

Next step

Splashbacks and upstands in Old Kent Road, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.