Southwark · SE16

Splashbacks and upstands in South Bermondsey

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Capri White island beside the belfast sink, tulips on a brass tray and a wooden stool tucked under the overhang

South Bermondsey kitchens

The kitchens we meet in South Bermondsey

Half of what we get asked about splashback and upstand work in South Bermondsey could be answered by a tape measure and ten minutes in the room in question. Predominantly estate flats with small separate kitchens - an L of 2.2m and 1.5m is typical, often with a boxed-in soil stack in the corner and a boiler over the run, so the work is replacing tired laminate on existing carcasses rather than designing from scratch. You do not need to know which one you have before you call. We work that out on the survey.

The original plan had one sink position, and moving it means taking a waste through a wall that does not want to be cut. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. An upstand asks less of old plaster than a panel does.

Deck access means a long open walkway from the lift or the stair to the front door, and that walk happens with the piece on edge in whatever weather there is. The rough band left where tiles took the plaster with them is covered by the upstand rather than made good twice. Dry lining behind a panel needs a fixing plan of its own.

The mix here is Interwar LCC estate, 1960s and 1970s council block, Victorian terrace remnant and 2010s infill. Two of those can sit on the same street and quote a long way apart.

Undermounted sink cut-out in a quartz worktop
  • Interwar LCC estate
  • 1960s and 1970s council block
  • Victorian terrace remnant
  • 2010s infill

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • The joint to the worktop is siliconed, never grouted.
  • Upstands are small pieces, so they usually come out of the offcut the worktop leaves.
  • Dekton and sintered stone are stable in heat and daylight, which is why they suit a wall behind a hob.
Borough
Southwark
Postcodes
SE16
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why South Bermondsey is its own job

Half of quoting a kitchen in South Bermondsey is understanding the approach to it, which is why the survey is done in person. Balcony-access blocks and deck walkways mean a long carry from the parking court, and lifts in the older blocks are small and frequently out of service; match days around the stadium close roads and fill every kerb. Assume the carry, not the drive - if the lift is down, a 3m piece is not going up a deck-access stair, so it gets cut to two. You see the drawing before we cut, and if we have read the room wrong, that is the moment to say so, not the morning the fitters arrive.

The work

What worktop splashbacks & upstands involves

The pieces are made to the wall they will stand against, so they are not stock items and cannot be ordered from a size. Each one is drawn for its own stretch of wall. Nothing is trimmed on site. The openings and the returns are machined at the workshop, so the drawing has to carry every dimension the wall is going to demand of the piece. You end up with a continuous run of stone from the worktop up, cut from the same slab batch so the colour matches where the two pieces meet.

An upstand is a low strip of the same material standing on the worktop against the wall, usually about a hundred millimetres; a splashback carries on up to the wall units or the extractor. A flexible bead does that seam, never grout, because the two pieces work against each other and grout has nothing to give. Concrete panel construction in these blocks will not accept a plug, so bonding a sheet to it suits the building better than fixing through would. Cut from the slab the worktop came out of.

Sink cut-outs See the options

The money

What it costs in South Bermondsey

Sockets and switches are cut-outs like any other, and their number does more to the price than the height of the panel does. An L has a return, and a return rarely nests neatly on a slab, so the yield question arrives earlier than it does on a straight run. A per square metre figure of £110 to £550 describes stone, not a worktop. What turns one into the other is machining and a fitting day, and both are listed as themselves. Same slab run, and the quote says so.

ex-local-authority flats and estates

The carry, and what it rules out

Whether the stone can stand on end in the car is the first question, because a lift that takes 2.1m upright takes nothing like that lying flat. Panels travel on edge in a frame, and the frame needs the same clearance the finished piece does. Joint positions follow from that.

ex-local-authority flats and estates

What South Bermondsey asks for

Not the top of the list on this patch, since worktop replacement takes that, but close enough behind it that we are here often. The method does not change.

ex-local-authority flats and estates

South Bermondsey in the housing figures

In this corner of the borough, landlords hold the greater part of the stock. A short run leaves nowhere to hide a join. Whether it is stone or tile is usually a budget decision made by someone who will never see the room. Templated after the top is in, never before.

Access

Getting stone into a South Bermondsey kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

South Bermondsey is covered on our south east London run, along with the rest of Southwark.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in South Bermondsey

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Are you set up to work in South Bermondsey, or is it a subcontractor?

Yes. South Bermondsey is on the patch, and the postcodes we work here are SE16. It is worked on our south east London run, along with the rest of Southwark. Where an event closes the road entirely, the van cannot be moved once it is in, which is a different problem from not being able to park at all. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. A tall panel and a timed bay is the worst combination here. We come to the kitchen to template and again to fit, so there is nothing to visit and nothing to collect.

02

What should I expect from worktop splashbacks & upstands in a South Bermondsey kitchen?

A maisonette puts the kitchen on one of two levels, so an internal staircase may be part of the route as well as the communal one. The rear kitchen wall in ex-council flats and maisonettes is commonly dense in-situ concrete or blockwork with a thin skim, which means mechanical fixings are hard work and the splashback is held on adhesive rather than screwed. Old plaster rarely gives you a flat metre. A boxed soil stack or service riser in the corner of a run eats into the worktop depth and has to be scribed around rather than cut square. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. The obstruction breaks the length, every time.

03

How would you get a worktop into a property in South Bermondsey?

Goods lifts and passenger lifts fail differently: one has a rated load that matters, the other has a door aperture that matters more. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. It decides panel size before anything is cut. A market day closes the street to traffic for the morning and hands it back in the afternoon, which moves the visit rather than cancelling it. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. They go in with the first load where the stop is short.

04

Does worktop splashbacks & upstands come up often in South Bermondsey?

It sits second or third on this patch, behind worktop replacement. Same template visit, same benches, same installers either way. A worktop replacement between tenancies is a single-day job by design, because the flat is not earning while it is empty. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. The annexe gets the same panel as the main run. Agents book this work at short notice, because the void only becomes a real date once the outgoing tenant confirms they are going. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. A repeated spec needs a repeatable splashback.

05

What moves the number on a quote around here?

Corner sinks and corner hobs sit exactly where the joint wants to be, so on an L the cut-out positions get settled before the join positions do. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. The panel seam sits over the worktop seam. The material band is £110 to £550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

06

What state does a South Bermondsey kitchen have to be in before you template?

Boxing is rarely the same depth at worktop height as it is at floor level, so measuring it low down is the usual reason a top will not sit back. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. A tall panel exposes what an upstand forgives. Any surface trunking or conduit has to be rerouted or accepted and boxed before templating, because the stone cannot be scribed around a live conduit on site. Planned programmes run several kitchens in sequence, so template, fabrication and fitting move as a rolling operation and one uncollected key holds up more than one flat. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Nothing goes behind the hob until the wall is signed off.

07

What if the stone cannot get up the stairs in a South Bermondsey flat?

A piece travels on edge, never flat, because on edge is how stone of that length carries its own weight. If a piece cannot be got in at all, we say so at the template rather than on the day. Handrails, mirrors and a sloping ceiling panel all eat into the usable diagonal, and none of them appear on a lift specification sheet. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. That is agreed at template, not on fitting day.

08

What happens if a piece is damaged on the fitting day?

Most breakages happen on the carry, which is why the route is walked and measured before anything comes off the van. Damage found on the bench never leaves the workshop, and damage on the carry is remade under the same cover. A dropped pan years later is a different question, and stone is remade rather than filled either way. A lift out of service for the day turns a straightforward install into a stair carry, so the slot gets confirmed with whoever manages the building rather than against a calendar. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. The panel is sized to the turn, not to the wall alone.

09

Will you fit stone onto units that are not level?

Stone does not flex, so a run that rocks on its carcasses rocks just as badly once it is stone. Small variation is taken up by packing under the top on the fitting day. The check comes before the measuring rather than after, because the whole drawing is set out from that plane. Anything that has to stay accessible, a stopcock, a gas meter, a riser panel, is marked on the template so the stone is cut around it instead of over it. It decides whether the run gets one continuous piece or a set of separate lengths with a joint at every obstruction. Scribe the top edge too or it stands off.

10

Do you quote South Bermondsey jobs by the square metre?

Every run, cut-out, edge, join and groove set is a line, which is what makes it comparable with anyone else’s. The quote is written from the template drawing. Before that it works from what you have described. The design and quotation visit is free and carries no obligation, so a figure exists before any commitment. A notch around a boxed stack is machined with a radius at the internal corner, because a square inside corner there is exactly where a top will crack. A mitred external return around it has to come from the same position in the slab, or the pattern visibly steps at the corner. The sill caps the upstand before anything else does.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Really impressed with the quality and finish of these worktops. Great range of materials, precise fabrication, and smooth communication throughout. The whole process was easy and the final result looks fantastic. Highly recommend!”
Nastasia DragoGoogle review
★★★★★
“We installed new kitchen and got the worktop and splash back from them. Their professional work and commitment was wonderful. Quality of work compared to price was way too good. Thank you guys.”
MD Matinur RahmanGoogle review
★★★★★
“I am really happy with my worktop. It is beautiful and the service provided was second to none. I totally recommend.”
Magaly RGoogle review

Next step

Splashbacks and upstands in South Bermondsey, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.