Hammersmith and Fulham · SW6

Splashbacks and upstands in Peterborough Estate

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Alaska peninsula with four grey velvet stools tucked under the overhang, looking through to the utility run

Peterborough Estate kitchens

The kitchens we meet in Peterborough Estate

What splashback and upstand work actually involves in Peterborough Estate depends on what you are fitting into, and around here that is not one thing. The estate was built to one repeated pattern, so the houses are near-identical: two-bay front, narrow side return, and a rear kitchen that after infill gives an L of roughly 3.6m by 2.4m with a 2m island. Repetition works in your favour - once you have templated a few, the wall positions and the awkward step down into the old back addition are predictable across the whole estate. If you are not sure, say so when you get in touch. It is a normal answer and we work with it.

Injected damp courses and re-rendered lower walls leave the bottom metre standing proud of everything above it. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. The flatter the wall, the taller the stone.

The original scullery gully is still live in the yard outside the back door, and new waste from the sink joins a drain laid for a copper and a stone sink. A full-height panel in a chimney recess is templated as a trapezium, since that recess is square in neither direction. A chimney breast breaks the run and the panels follow it.

On these streets the housing is 1890s red-brick terrace with terracotta detailing, uniform speculative estate terrace, loft-converted family house and rear extension. Each of those puts the services somewhere else, and the cut-outs follow.

Polished stone edge profile close up
  • 1890s red-brick terrace with terracotta detailing
  • uniform speculative estate terrace
  • loft-converted family house
  • rear extension

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Wall pieces are priced by the square metre like everything else, from £110 upwards.
  • Edges are polished on every side that shows, including the top edge of an upstand.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
Borough
Hammersmith and Fulham
Postcodes
SW6
Covered on
our west London run
Fitted
5–10 working days from template

The place

Why Peterborough Estate is its own job

A firm that has not worked in Peterborough Estate tends to find out about the access on the morning of the fit, which is too late to change anything. Uniform terraces with small front gardens, low walls and a gate, and permit bays that fill by evening, so morning slots are much easier. Side returns are almost always built out, so there is no alley left and the hall is the route - about 1m wide with the stair immediately on the right and a doorway into the kitchen at the end. The stock repeats, so keep the templates - the same joint layout that worked three doors down will almost certainly work again. Better to know it at the design visit than to find out with a slab standing on the pavement.

The work

What worktop splashbacks & upstands involves

The decision belongs to the quotation stage rather than to the week after the kitchen is finished, because the stone for the wall is taken from the worktop order rather than bought again. Where a run is longer than one sheet will cover, the break is put on a vertical that has a reason to be there, and the two edges are cut as a pair so the seam closes without filler. You end up with a run of stone that reads as one decision rather than two, because the wall and the surface were drawn, machined and fitted as parts of the same job.

Upstands and splashbacks are drawn, priced and made as their own piece of work, not thrown in as an offcut at the end of a worktop order. Behind a hob the panel usually rises higher than the rest of the run and stops at the extractor instead of at the units. In a house this old the wall behind the run has been skimmed over lath in one bay and dot-and-dabbed onto brick in the next, and a tall sheet finds both. Stone behind the hob, not grout.

Edge profiles See the options

The money

What it costs in Peterborough Estate

Sockets and switches are cut-outs like any other, and their number does more to the price than the height of the panel does. One continuous L takes more slab than its metreage implies, because the waste sits inside the angle. The rate is £110 to £550 per square metre supply only, though what you buy is slabs rather than square metres, which is why the material line follows the yield and not the tape. Height is a decision with a figure against it.

Victorian and Edwardian terraces

The building, and what it does to the job

Floors settle, and once base units are packed and levelled properly the stone sits true while everything else in the room admits it is not. It decides whether the run gets one continuous piece or a set of separate lengths with a joint at every obstruction. A downstand sets the panel height, not the wall units.

Victorian and Edwardian terraces

What Peterborough Estate asks for

The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. The offcuts finish the room.

Not typical work for this area. Worktop fabrication and worktop installation are what the housing asks for. The process is unchanged; only how often we are on the street differs.

Access

Getting stone into a Peterborough Estate kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

West London patch

Peterborough Estate is covered on our west London run, along with the rest of Hammersmith and Fulham.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Peterborough Estate

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Are you set up to work in Peterborough Estate, or is it a subcontractor?

Yes. Peterborough Estate is on the patch, and the postcodes we work here are SW6. It is worked on our west London run, along with the rest of Hammersmith and Fulham. Where the household has used up the visitor permits it gets for the year, the remaining options are a suspension or a paid bay and both belong on the quote. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. Off the van last, and never in a hurry. Nothing needs visiting and nothing needs collecting: the template is in your kitchen and so is the fit.

02

What is different about worktop splashbacks & upstands in Peterborough Estate?

The rear door swings inward across the end of the run, so the last few hundred millimetres of worktop are only reachable with the door shut. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. Where the plaster undulates, the shorter piece wins. A junction between an original floor and a later extension slab is almost never at the same level, so units carrying a run across it need packing first. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Behind the boxing it becomes two pieces.

03

Is access a problem in Peterborough Estate?

Stone goes up on edge, and it is the half-landing turn rather than the flight itself that sets the maximum piece. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Panel size is checked against the tightest point rather than the average one. Estate roads inside a controlled zone are sometimes managed privately rather than by the council, which changes who has to be asked. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. The crate exists for the walk from the van.

04

Does Peterborough Estate actually ask for worktop splashbacks & upstands?

Not to any real extent, and it would be easy to imply it was. What the research on this patch actually lists is worktop fabrication and worktop installation. It describes the kitchens on this patch, not the work that goes into them. Same quoting, same cutting, same fitting as anywhere else on the patch. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Less to clean, for whoever cleans it. Extension work runs late far more often than it runs early, and the worktop is close to the last thing in, so the date agreed at the start is rarely the date that happens. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Panels for every unit, cut in one go.

05

What makes one Peterborough Estate kitchen dearer than the next?

Two runs meeting at an internal corner is the most common shape we fit, and the corner is where the decisions are. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Joint placement is a decision, not an accident. Stone is £110 to £550 per square metre supply only, and the templating, the fabrication and the fitting each carry their own line.

06

What holds a template up more often than anything else?

Legs bottoming out on hard concrete or an uneven screed mean the tops of the carcasses are not one plane, and that is picked up at template rather than on fitting day. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Nothing gets hidden behind a full-height panel. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. Where someone is living in the house through the work, the strip-out and the fit are planned so the kitchen is out of use for a day and not a week. Full-height panels need the wall made good first, which is another trade and another timescale. Two trades, two budgets, one drawing.

07

How many joins will a Peterborough Estate kitchen need?

Veining carries through a join where both pieces come off the same slab, which is decided at nesting. Slabs come in finite sizes, so a long run needs a join whatever the room looks like. What you get is a line rather than a step, because the pieces are levelled to each other first. The return piece is the awkward one on a slab: short, full depth, and rarely nesting neatly against the long lengths, so yield rather than area is what moves the material figure. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. Corners get their own pieces.

08

What happens when the route into a Peterborough Estate kitchen is tighter than the worktop?

Doorways, the newel post and the handrail usually take the room away, rather than the stairs themselves. Splitting a run costs a join, and that is the price of getting stone into the room at all. If a piece cannot be got in at all, we say so at the template rather than on the day. A walk-up with winders at every half-landing means the piece is rested and re-gripped on the way, so the crew size goes up before the piece size comes down. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. They come in last so nothing is carried past them.

09

How many visits does a Peterborough Estate worktop take?

The same firm templates and fits. Nobody else is brought in to install. The fit follows 5 to 10 working days after the template, and nothing is cut before that visit because nothing is cut from a plan. A template on a normal kitchen takes two to three hours in the room. Where the walls have been dry-lined over the old lath there is a void behind the board and no solid fixing until a batten is found. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Sockets cut in the shop, not on site.

10

Is the quote a fixed price or an estimate?

What moves the figure after templating is a change you make: a different edge, an extra cut-out, a bigger sink chosen late. What is quoted is what the drawing says, and the figure does not move unless the drawing does. Every run, cut-out, edge, join and groove set is a line, which is what makes it comparable with anyone else’s. Level has to hold across the whole room rather than along one wall, or a floor that falls end to end shows as a step where two pieces meet. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. The reveal decides where the stone dies.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Karem did a fantastic job at installing my antique bronze mirror for my coffee/drinks unit. He was really professional and his communication throughout was clear.”
KalsGoogle review
★★★★★
“We have a new kitchen. Our builder recommended Worktop Worx for our worktop. Now we have an amazing worktop very good price too. Really recommend. They were really good to us. 10/10”
j thomasGoogle review
★★★★★
“We recently had the Arctic Starburst worktop installed by Worktop WorX and it looks amazing. The subtle sparkle really catches the light and gives the kitchen a clean, modern feel. The Arctic Starburst surface feels high quality, durable, and is easy to keep clean. The finish and installation from Worktop WorX were spot on. Really happy with the result and would definitely recommend both Arctic Starburst and Worktop WorX to anyone upgrading their kitchen.”
Han LeeGoogle review · Arctic Starburst

Next step

Splashbacks and upstands in Peterborough Estate, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.