Hammersmith and Fulham · SW6

Splashbacks and upstands in Fulham

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Arctic Starburst carried round a U-shaped kitchen in pale grey handleless units, pendants over the breakfast bar

Fulham kitchens

The kitchens we meet in Fulham

People often assume splashback and upstand work in Fulham is a straight swap, and sometimes it is, though the kitchen usually has an opinion about that. The classic SW6 job is a side-return infill on a two-storey terrace, giving a kitchen of roughly 5m by 3.5m with a 3m run along the flank wall and an island of 2.4-2.8m, usually in quartz with a mitred 60mm edge. Because so many of these houses have also gone up into the loft, the structural work is done before you arrive and the walls are new and square, which makes single long pieces realistic. Every quote we write for Fulham starts with somebody looking at the actual run, not with an assumption about what is behind the units.

The side return was an outside toilet and a coal store before it was ever a kitchen, and the walls left over from that are half a brick thick. Height is set off the units and the hob, not off the tile line that was there before. Panel thickness changes what the sockets need behind them.

The addition wall is half a brick thick in places and has usually had a damp course injected and been re-plastered, which leaves it neither flat nor consistent. Where an upstand meets a window reveal the return is mitred rather than butted, so the joint does not open as the wall moves. Decided before fabrication starts.

Locally the mix runs to late Victorian two-storey terrace, Edwardian terrace, purpose-built mansion flat and loft-converted family house. What the units are screwed to varies between them, and that decides the fixings.

Worktop join finished flush against a wall
  • late Victorian two-storey terrace
  • Edwardian terrace
  • purpose-built mansion flat
  • loft-converted family house

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.
Borough
Hammersmith and Fulham
Postcodes
SW6
Covered on
our west London run
Fitted
5–10 working days from template

The place

Why Fulham is its own job

We measure and fit in Fulham often enough to know what to ask about before anyone agrees a date. Uniform terraced grid with CPZ permit bays, so the van goes on a suspension or a short loading window and the trolley run is 15-30m. Front paths have a step and a gate, halls are around 1m wide with the stair on one side, and the kitchen sits at the far end past a doorway that is often only 760mm - the door leaf and stops come off before anything moves. Take the kitchen door and its stops off first - a 760mm opening will not pass a 900mm island top and people always find that out at the worst moment. It gets measured, drawn, agreed and priced, in that order, and you sign the drawing off before the workshop puts a blade near the slab.

The work

What worktop splashbacks & upstands involves

The pieces are made to the wall they will stand against, so they are not stock items and cannot be ordered from a size. Each one is drawn for its own stretch of wall. Nothing is trimmed on site. The openings and the returns are machined at the workshop, so the drawing has to carry every dimension the wall is going to demand of the piece. You end up with a joint that stays closed. It is siliconed rather than filled hard, so the wall and the surface can move against each other without opening a crack.

The survey for these pieces is a separate visit with a separate drawing, made after the tops are in and the room has stopped changing. Panels are offered up dry before any adhesive goes near them, and the scribe comes off the piece, never off the plaster. A rear extension often puts the sink under a window whose sill is barely clear of the surface, and that settles the height before anyone gets a say. The panel clears the extractor before it is machined.

Corners and joins See the options

The money

What it costs in Fulham

It is priced as its own item so you can see what removing the grout line actually costs before deciding. A rooflight over the run means any join is seen under raking light, which is a placement decision with a cost attached. Thickness, finish and colour move a slab within the £110 to £550 supply band before anyone touches it, so that figure is settled by what you pick rather than by the room. Priced by the edge and the openings, not the wall.

Victorian and Edwardian terraces

Fulham in the housing figures

Across this patch the inter-war years left little behind, so the familiar bay-and-return plan is rare on these jobs. Socket and switch positions have to be final before the panel is templated. Templated once the top has settled in place.

Victorian and Edwardian terraces

The shape of the run

A single long run down one side puts every cut-out in one piece, so the sink, the hob and any drainer grooves all take material out of the same length. A splashback returning round an external corner is mitred so no cut edge is on show, and that mitre is cut on the same machine as the worktop mitres. Every internal corner is two pieces, not one.

Victorian and Edwardian terraces

What Fulham asks for

It would be overstating it to call this a speciality on this patch. Worktop fabrication and worktop installation are far commoner. None of that changes the survey, the cut list or the fit.

Access

Getting stone into a Fulham kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

West London patch

Fulham is covered on our west London run.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Fulham

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you cover Fulham?

Yes. Fulham is on the patch, and the postcodes we work here are SW6. It is worked on our west London run, along with the rest of the borough. A van waiting on a loading concession has somebody standing with it, because a vehicle left unattended is the one that collects the ticket. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. A short bay slot is when the tall pieces get damaged. The measuring and the fitting are both done at the property, so there is nothing to visit or collect.

02

Is there anything about Fulham buildings that catches worktop splashbacks & upstands out?

Where the side return has been filled in, the old external wall is now an internal one and still carries its render, its gutter line and its old fixings. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. Height, returns and sockets, all settled on site. A wall line that runs level over a floor that does not means the finish closes up on the plinth at one end, which is joinery rather than something the stone can answer. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Make the wall good first, or accept the detail.

03

What do you check about the route into a Fulham property?

Every flight adds a set of handling movements, and handling is where stone gets damaged, so a fourth-floor walk-up is priced by the flight rather than by the metre. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. The frame they travel in needs the clearance as well. Controlled hours that end in the middle of the afternoon make the second half of the day easy and put the whole problem in the first half. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. Kerb to kitchen is measured before the panels are unstrapped.

04

Is Fulham really a worktop splashbacks & upstands area?

Not especially, and pretending otherwise would be simple enough. What the research on this patch actually lists is worktop fabrication and worktop installation. It is a fact about the local housing rather than about the work. The job is quoted, cut and fitted the same way wherever on the patch it lands. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Sockets move on site far more often than plans do. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. The extension electrician finishes after the drawing did.

05

Why do two Fulham kitchens the same size price differently?

A galley run down a side-return extension usually measures longer than a slab will give in one length, so a join is designed in from the start rather than discovered. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Long walls break where the worktop breaks. Supply-only material is £110 to £550 per square metre, and templating, fabrication and fitting are quoted separately rather than rolled in.

06

What has to be finished before you can template?

Where two pieces meet over a fall in the floor the join has to be flush to the hand as well as true to the level, because the eye reads the join and forgives the room. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Scribed, dubbed out, or set proud. Pick one. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. Because the money comes out of a household rather than a maintenance budget, phasing is common: tops now, island or splashbacks later, quoted so the second visit still matches the first. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Committed early or dropped early, not left open.

07

Can the price change after templating?

Taking the old tops away is a line rather than an assumption, so it comes off if you do not want it. Material is quoted supply only and templating, fabrication and fitting sit on their own lines, so it is visible which part is stone and which is labour. Floors settle, and once base units are packed and levelled properly the stone sits true while everything else in the room admits it is not. It decides whether the run gets one continuous piece or a set of separate lengths with a joint at every obstruction. The obstruction sets the joint, not the wall.

08

What if the stone gets chipped on the way into a Fulham kitchen?

Stone cannot be filled and made good the way laminate can, so a damaged piece is remade rather than patched. A remade piece is cut from the same slab run wherever the slab allows, because a replacement from another batch will not match across a join. The workmanship guarantee runs 5 years on every kitchen we fit. Sintered stone at 12mm changes what a staircase can take, because the same run arrives at roughly half the weight of the granite equivalent. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. A vertical break is easier to live with than a cracked panel.

09

Can a Fulham worktop be done in one piece?

Dark and heavily veined stone shows a join more than a pale even one, which is worth knowing before the slab is picked. Join count and position are settled from the template drawing rather than improvised on the fitting day. An island often runs in one piece where a wall run cannot. Side-return kitchens are long and narrow with one outside wall, and the wall the run sits against is often the oldest, least straight surface in the house. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Upstands follow the return round the corner.

10

Is a drainer groove worth it in a small Fulham kitchen?

They are cut with a fall towards the bowl, which is why they cannot be added on site later. The bowl position has to be settled before templating, since the grooves are set out from it. They read strongly across a dark stone and are nearly invisible on a pale one, so look before deciding. Party wall settlement pulls the floor down at one side of the room, so a long run reads level at one end and not at the other. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Height is taken at the shortest point of the run.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Nice work from worktop worx. Highly recommended”
Rasika KumarageGoogle review
★★★★★
“Lovely team, business and quality motivated, prompt delivery with installation. Affordable prices. Wide range of worktops available. High recommendation”
Loreta SkalisieneGoogle review
★★★★★
“Great service. Super quick and easy communication. I love my new worktop 🥹🥹”
Sara ArghirGoogle review

Next step

Splashbacks and upstands in Fulham, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.