Skip to content

Hammersmith and Fulham · SW6

Splashbacks and upstands in Fulham

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

Fulham kitchens

What the kitchens here are actually like

late Victorian two-storey terraceEdwardian terracepurpose-built mansion flatloft-converted family house

The kitchen normally sits in the back addition or a later side return, which puts the run against the oldest and least straight wall in the building. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. The wall decides, not the brochure.

The classic SW6 job is a side-return infill on a two-storey terrace, giving a kitchen of roughly 5m by 3.5m with a 3m run along the flank wall and an island of 2.4-2.8m, usually in quartz with a mitred 60mm edge.

Take the kitchen door and its stops off first - a 760mm opening will not pass a 900mm island top and people always find that out at the worst moment. Because so many of these houses have also gone up into the loft, the structural work is done before you arrive and the walls are new and square, which makes single long pieces realistic. Front paths have a step and a gate, halls are around 1m wide with the stair on one side, and the kitchen sits at the far end past a doorway that is often only 760mm - the door leaf and stops come off before anything moves.

A long piece has to come through the front door, down the hall, round the newel post and through a doorway with a step down into the addition. A 100mm upstand bedded on silicone is the honest answer where the plaster bows, because it rides what a tall panel exposes. Cut from the same slab run as the tops.

On these streets the housing is late Victorian two-storey terrace, Edwardian terrace, purpose-built mansion flat and loft-converted family house. That mix is why two jobs on the same road can run completely differently.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered from the New Malden patch. Fitted 3–7 working days from template.

Victorian and Edwardian terraces

Getting stone into the room

Uniform terraced grid with CPZ permit bays, so the van goes on a suspension or a short loading window and the trolley run is 15-30m.

Victorian and Edwardian terraces

What gets asked for here

The research on this patch does not put this among the three commonest jobs. Worktop templating, worktop fabrication and worktop installation do. That changes how often we are here, not how the work is done.

Victorian and Edwardian terraces

The shape of the run

Rooflights along a side return mean the worktop is lit from directly above all day, which shows every ripple in a surface and every gap at a scribe. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. The joint to the worktop is siliconed, never grouted.

Access

Getting stone into a Fulham kitchen

Uniform terraced grid with CPZ permit bays, so the van goes on a suspension or a short loading window and the trolley run is 15-30m. Front paths have a step and a gate, halls are around 1m wide with the stair on one side, and the kitchen sits at the far end past a doorway that is often only 760mm - the door leaf and stops come off before anything moves.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

New Malden patch

Fulham is worked from our New Malden run, covering South West London & Surrey.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Fulham

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you cover Fulham?

Yes. Fulham is on the patch, and the postcodes we work here are SW6. It is run from the New Malden side, covering South West London & Surrey. A controlled parking zone means either a visitor permit sorted in advance or a suspended bay, and a suspension is applied for days ahead rather than on the morning. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. That is why they are crated the way they are. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Does the housing in Fulham change how worktop splashbacks & upstands works?

The addition wall is half a brick thick in places and has usually had a damp course injected and been re-plastered, which leaves it neither flat nor consistent. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. The wall makes that decision, not the brochure. Take the kitchen door and its stops off first - a 760mm opening will not pass a 900mm island top and people always find that out at the worst moment.

How does the stone actually reach a kitchen in Fulham?

Uniform terraced grid with CPZ permit bays, so the van goes on a suspension or a short loading window and the trolley run is 15-30m. Front paths have a step and a gate, halls are around 1m wide with the stair on one side, and the kitchen sits at the far end past a doorway that is often only 760mm - the door leaf and stops come off before anything moves. Communal stairs get boarded and the handrail padded, and we walk the route with a tape before the first piece leaves the van. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. Joint positions follow from that. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.

Is Fulham really a worktop splashbacks & upstands area?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop templating, worktop fabrication and worktop installation. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Same batch, same run, same day. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Siliconed to the worktop, never grouted.

Why do two Fulham kitchens the same size price differently?

Side-return kitchens are long and narrow with one outside wall, and the wall the run sits against is often the oldest, least straight surface in the house. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. Joint placement is a decision, not an accident. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What has to be finished before you can template?

A junction between an original floor and a later extension slab is almost never at the same level, so units carrying a run across it need packing first. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Scribed, dubbed out, or set proud. Pick one. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. Where someone is living in the house through the work, the strip-out and the fit are planned so the kitchen is out of use for a day and not a week. Full-height panels need the wall made good first, which is another trade and another timescale. The wall has to be ready.

Next step

Splashbacks and upstands in Fulham, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7479 194398