Hammersmith and Fulham · SW6

Kitchen worktops in Fulham

The classic SW6 job is a side-return infill on a two-storey terrace, giving a kitchen of roughly 5m by 3.5m with a 3m run along the flank wall and an island of 2.4-2.8m, usually in quartz with a mitred 60mm edge. Because so many of these houses have also gone up into the loft, the structural work is done before you arrive and the walls are new and square, which makes single long pieces realistic.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

The housing stock

What we are usually working with in Fulham

Nothing in a house of this age is square, and the kitchen is usually the part that has been altered most often. All of that is settled at the nesting stage, because a machined piece cannot be adjusted afterwards. Undermount cut-outs are polished before anything leaves.

Front paths have a step and a gate, halls are around 1m wide with the stair on one side, and the kitchen sits at the far end past a doorway that is often only 760mm - the door leaf and stops come off before anything moves. Take the kitchen door and its stops off first - a 760mm opening will not pass a 900mm island top and people always find that out at the worst moment.

The lean-to roof drains into a valley gutter against the addition next door, and a long leak there shows at the head of the kitchen wall rather than on the ceiling. Joins land over a cabinet gable and clear of every cut-out, because the alternative is a bridge of stone that will not survive the carry. The saw follows the template, never the plan.

The mix here is late Victorian two-storey terrace, Edwardian terrace, purpose-built mansion flat and loft-converted family house. Knowing which one it is before we arrive is half the survey done.

Access. Uniform terraced grid with CPZ permit bays, so the van goes on a suspension or a short loading window and the trolley run is 15-30m.

There is nothing to visit in Fulham. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.

Borough
Hammersmith and Fulham
Postcodes
SW6
Covered on
our west London run
Lead time
5–10 working days from template

Get a fixed quote Free samples

  • late Victorian two-storey terrace
  • Edwardian terrace
  • purpose-built mansion flat
  • loft-converted family house

Hammersmith and Fulham

The building, and what it does to the job

Sash windows sit in deep reveals with a working box behind the lining, so a run dying into one has to clear more than the plaster. Access panels that have to stay usable are cut around at the bench and not covered over on the day. Lath and plaster is cut for, never cut into.

Getting stone into the room

There is no leaning a piece against a wall halfway up, so any flight longer than a dozen treads is planned around a rest point on a landing. Protection goes down first, and what gets protected is decided by the route rather than by habit. The opening is measured on the diagonal, not across the frame.

Fulham in the housing figures

Taken across Fulham and the roads either side of it, the twenties and thirties barely register, so the standard semi galley is not the shape we are fitting. The awkward moment is nearly always the same one on this plan, so it is dealt with early. One team from the van to the seal.

Corners and joins See the options

Questions

Working in Fulham

01

Is Fulham somewhere you actually work?

Yes. The classic SW6 job is a side-return infill on a two-storey terrace, giving a kitchen of roughly 5m by 3.5m with a 3m run along the flank wall and an island of 2.4-2.8m, usually in quartz with a mitred 60mm edge. Because so many of these houses have also gone up into the loft, the structural work is done before you arrive and the walls are new and square, which makes single long pieces realistic. Applying for a suspension means naming a length of kerb and a date, and moving the date generally means applying for it again. It rarely changes what we cut, but it does change how the pieces are stacked and strapped for the run out. The load sheet carries the parking note with it.

02

What do Fulham kitchens tend to look like?

late Victorian two-storey terrace, Edwardian terrace, purpose-built mansion flat and loft-converted family house. The bathroom upstairs sits directly over the kitchen, so its waste comes down in a boxed corner from floor to ceiling that no worktop is going to move. The galley run down a side-return usually measures longer than a slab will give us, so a join is designed in from the start and nested to land over a cabinet gable rather than wherever the material happens to run out. What leaves the bench is what fits the room.

03

Is access difficult in Fulham?

Uniform terraced grid with CPZ permit bays, so the van goes on a suspension or a short loading window and the trolley run is 15-30m. Front paths have a step and a gate, halls are around 1m wide with the stair on one side, and the kitchen sits at the far end past a doorway that is often only 760mm - the door leaf and stops come off before anything moves. Pendant fittings over the stairwell and anything hung on the half-landing come down first, because a piece on edge sweeps a wider arc than the people carrying it. The fitting day is planned backwards from that point, before anything comes off the van. Pieces wait on trestles until the fitters call for them.

04

Which jobs come up most often in Fulham?

Worktop fabrication and worktop installation, in that order. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. The fitting day is scheduled to suit that rather than to suit the diary. The void ends whether we have finished or not. Take the kitchen door and its stops off first - a 760mm opening will not pass a 900mm island top and people always find that out at the worst moment.

05

What sets the figure on a Fulham quote?

The step or level change between the original room and the return is real, and the units need packing before stone goes across it. A join that lands in the wrong place cannot be moved once the cut-outs are machined, so it is settled on the drawing. The overhang is cut with its support already sized. A floor that falls across the depth of a run rather than along it tips the carcasses front to back, and packing the front feet changes the overhang while it fixes the level. On the day it means dry-laying, marking, and cutting the scribe on site before anything is bonded. A bonded mitre goes down on one plane or not at all. Material runs from £110 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines rather than rolled into one figure.

06

Do you handle managed buildings in Fulham?

An owner living in the house makes the decisions and lives with them, so the specification tends to go towards the material rather than towards the lowest total. A half-day of access is not a fitting day, and it is better to say so at booking than to find out at eleven. Emptying the room belongs to the keyholder, not the crew. Tell us the building when you book and the lift, the stair turn and any freeholder notice get built into the day rather than found on it.

07

What if the stone cannot get up the stairs in a Fulham flat?

A join forced by the route still sits over a gable, so it is no poorer a join for that. If a piece cannot be got in at all, we say so at the template rather than on the day. What decides it is not the width of the stairwell but the length of piece that can be turned in it. A communal flight is out of use while a piece is on it, so the carry is timed so nobody is trying to pass on a half-landing. Finding it out on the morning costs the whole slot, because there is no second route to fall back on. Every re-grip is a chance to chip a piece, so they are planned out.

08

What do drainer grooves add to the job?

Which side of the bowl they go is about how you stand at the sink, and it is settled before cutting. Grooves and an undermounted bowl are usually specified together, since the grooves are run to the bowl edge. The kitchen normally sits in the back addition or a later side return, which puts the run against the oldest and least straight wall in the building. The workshop works to the template drawing and to the measured route, in that order. Every piece is numbered to the wall it belongs against.

09

How do you cut out for an undermounted sink?

We seat and seal the sink and hob on the day; water, waste, gas and electrics are for your plumber and electrician. A boiling tap needs a hole of its own and a cupboard below for the tank, so the units change too. Rooflights along a side return mean the worktop is lit from directly above all day, which shows every ripple in a surface and every gap at a scribe. Pieces are dry-assembled on the bench before dispatch so the corners are known to close before they leave the workshop. Edge work on a return matches edge work on a length.

10

Is a full-height splashback practical in a Fulham kitchen?

Upstand or splashback, the stone is cut from the same slab run as the worktop, at the same time, so the batch actually matches. Ordered later from a different batch, the match is not reliable where the two pieces meet. A full-height piece shows a wall that is out more than an upstand does, over the extra height. Many of these had a bathroom or a WC built onto the far end of the addition, so the room now ends at a stud wall rather than at the original brickwork. The other constraint is the hall: a piece has to come through the front door, round the newel at the foot of the stairs and through a doorway into the back kitchen, so we size the pieces to the tightest turn on that route before we nest anything, which sometimes means splitting a run that would otherwise have gone in whole. The bow in an old wall is cut for, not sanded out.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Perfect service,the best on this job”
Kleant IstrefiGoogle review
★★★★★
“I recently had my kitchen worktop and splashback done by Karem from Worktop WorX and i am very pleased with the result. From the initial consultation and measurements to the final installation, the whole process was smooth and professional. The attention for details and the quality made the difference and everything was finished to a high standard. I definitely recommend Worktop WorX to anyone looking for reliable and high quality kitchen work”
Alexandru BalintGoogle review
★★★★★
“Really impressed with the quality and finish of these worktops. Great range of materials, precise fabrication, and smooth communication throughout. The whole process was easy and the final result looks fantastic. Highly recommend!”
Nastasia DragoGoogle review

Next step

Get your Fulham kitchen priced

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.