Skip to content

City of London · E1 EC3N

Splashbacks and upstands in Portsoken

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

Portsoken kitchens

What the kitchens here are actually like

City-owned postwar housing estate1960s-70s deck and corridor access blockmodern infill flatsconversion above street-level retail

Floors have usually settled towards the rear, so levelling means packing the units before the stone beds down. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. Siliconed to the top, never grouted.

This ward holds a genuine concentration of long-standing City residential, and the estate flats have small, closed kitchens of roughly 2.0-2.6m with shallow original units and a fixed boiler cupboard.

Small kitchens, long carries, and a lift you cannot rely on - the labour cost here is all in getting the stone from the kerb to the flat. Work here is nearly always straightforward replacement in the existing footprint, cutting round a service duct and finishing with matching stone upstands rather than tiles. Estate blocks with controlled entry, communal stairs and a single lift per core, and the surrounding streets have market trading and heavy pedestrian flow around Middlesex Street on trading days. There is no meaningful visitor parking, so the van works a short loading window and the crew does a long push across a courtyard to the block door.

Construction is blockwork with a render or a brick skin, so the walls are reasonably true and take a fixing properly. Post-war terraces are typically blockwork or early lightweight block with a hard render coat, and the kitchen has usually been reconfigured at least once, leaving patched areas of newer plaster next to original render that sit at different depths. The wall makes that decision, not the brochure.

On these streets the housing is City-owned postwar housing estate, 1960s-70s deck and corridor access block, modern infill flats and conversion above street-level retail. The differences between them show up at template, not at enquiry.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered from the Essex patch. Fitted 3–7 working days from template.

ex-local-authority flats and estates

Getting stone into the room

The practical answer is to check the fixture list before the date is offered, because a template slot lost to a road closure cannot be recovered that week. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. One trip is always better than three.

ex-local-authority flats and estates

What gets asked for here

This is one of the three jobs that come up most here, behind worktop replacement. It is the same template visit, the same workshop and the same installers either way.

Access

Getting stone into a Portsoken kitchen

Estate blocks with controlled entry, communal stairs and a single lift per core, and the surrounding streets have market trading and heavy pedestrian flow around Middlesex Street on trading days. There is no meaningful visitor parking, so the van works a short loading window and the crew does a long push across a courtyard to the block door.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

Essex patch

Portsoken is worked from our Essex run, covering Essex & East London.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Portsoken

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Is Portsoken on your patch?

Yes. Portsoken is on the patch, and the postcodes we work here are E1, EC3N. It is run from the Essex side, covering Essex & East London. Streets near a ground or a venue have restrictions that come and go with the fixture list rather than with the time of day. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. One trip is always better than three. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Why would worktop splashbacks & upstands in Portsoken be any different from anywhere else?

Construction is blockwork with a render or a brick skin, so the walls are reasonably true and take a fixing properly. That step is exactly what an upstand covers and what a full-height panel exposes, so unless the wall is skimmed level end to end, a 100mm band is the reliable choice. Decided before fabrication starts. Small kitchens, long carries, and a lift you cannot rely on - the labour cost here is all in getting the stone from the kerb to the flat.

How would you get a worktop into a property in Portsoken?

Estate blocks with controlled entry, communal stairs and a single lift per core, and the surrounding streets have market trading and heavy pedestrian flow around Middlesex Street on trading days. There is no meaningful visitor parking, so the van works a short loading window and the crew does a long push across a courtyard to the block door. The lift has to be booked and blanketed before anything moves, and that booking needs to cover the old tops coming out as well as the new stone going in. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. That is agreed at template, not on fitting day. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.

Is worktop splashbacks & upstands common in Portsoken?

It is one of the three we do most here, behind worktop replacement. Same template visit, same workshop, same installers either way. A kitchen carved out of a larger room sits under whatever the original plan left behind, so the run frequently ends at a blocked doorway or a boxed-in service. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Sockets final before template. Conversions put kitchens where the services could be made to reach rather than where they belong, so runs are short and interrupted. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Same batch, same run, same day.

What moves the number on a quote around here?

A galley puts the sink on one side and the hob on the other, which spreads the cut-outs across two pieces instead of weakening one. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. The joint to the worktop is siliconed, never grouted. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What needs to be ready before you come to Portsoken?

A boxed soil stack or service riser in the corner of a run eats into the worktop depth and has to be scribed around rather than cut square. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Make the wall good first, or accept the detail. Boiler position, flue and any pipework drops must be settled and the wall skimmed level before templating the splashback run. These kitchens tend to be compact and reasonably square, so the fixed template, fabrication and fitting lines are a larger share of the total than the stone is. Full-height panels need the wall made good first, which is another trade and another timescale. Same slab run as the tops.

Next step

Splashbacks and upstands in Portsoken, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7479 194398