Skip to content

Bromley · BR6

Worktop templating in Pratts Bottom

A digital template plotting the room as it really is, taken once your units are fitted, fixed and level.

Pratts Bottom kitchens

What the kitchens here are actually like

semi-rural detached1930s cottageconverted outbuildingpost-war bungalow

Wide doors, generous rooms and somewhere to park mean the joins that go in are the ones we choose, not the ones the building forces. The template records what the building actually did, not what the plan intended, and the gap between those two is what this visit is for. Units fitted, fixed and level first.

Small hamlet stock with kitchens that are usually part of a rear extension or an old outbuilding brought into the house, so ceiling heights change mid-run and there is often a step down into the kitchen. Oil or LPG range cookers are more common here than in the suburbs.

Off the A21 down single-track lanes with passing places and blind bends, and driveways that turn sharply off the lane, so a long wheelbase van has to reverse in.

A period cottage has low ceilings, thick rubble-filled walls and a floor that has never been level, and the worktop is the thing that has to look straight. The island is templated for its overhang, its support and the position of the hob or sink within it, with sockets and any pop-up left where they will genuinely be. No stone is ever cut from a plan.

What we are usually templating in is semi-rural detached, 1930s cottage, converted outbuilding and post-war bungalow. Each of those behaves differently once the old top comes off.

True everywhere

Worktop templating, in short

  • Two to three hours on site for a typical kitchen.
  • Units must be fitted, fixed and level first. No stone is ever cut from a plan.
  • Sink, tap and hob must be physically on site, not just ordered.
  • A Belfast or butler sink must be installed and at its final height.

Covered from the New Malden patch. Fitted 3–7 working days from template.

period detached houses and villas

Getting stone into the room

Gravel and block paving both look like hard standing and neither takes a loaded trolley, so the run from tail lift to door gets boarded. It is noted on the job sheet at template so the fitting crew inherit the answer rather than rediscovering it. It goes on the job sheet for the fitting crew.

period detached houses and villas

What gets asked for here

Of everything we do around here, this is the one that comes up most, with worktop installation and worktop fabrication behind it.

period detached houses and villas

The building, and what it does to the job

Where there is a step down into an old outbuilding kitchen the cabinet plinths get packed, so we set datum from the units and not the floor.

Access

Getting stone into a Pratts Bottom kitchen

Off the A21 down single-track lanes with passing places and blind bends, and driveways that turn sharply off the lane, so a long wheelbase van has to reverse in.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

New Malden patch

Pratts Bottom is worked from our New Malden run, covering South West London & Surrey.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop templating in Pratts Bottom

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Is Pratts Bottom on your patch?

Yes. Pratts Bottom is on the patch, and the postcodes we work here are BR6. It is run from the New Malden side, covering South West London & Surrey. Gravel and block paving both look like hard standing and neither takes a loaded trolley, so the run from tail lift to door gets boarded. It is noted on the job sheet at template so the fitting crew inherit the answer rather than rediscovering it. Two hours is the realistic figure. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Why would worktop templating in Pratts Bottom be any different from anywhere else?

Doorways are low and narrow, which is a genuine constraint on piece length before anything else is considered. One datum for the whole room, because a floor that falls end to end shows as a step between island and perimeter. No stone is ever cut from a plan. Where there is a step down into an old outbuilding kitchen the cabinet plinths get packed, so we set datum from the units and not the floor.

How would you get a worktop into a property in Pratts Bottom?

Off the A21 down single-track lanes with passing places and blind bends, and driveways that turn sharply off the lane, so a long wheelbase van has to reverse in. Where the van stands level with the front of the house a piece gets handled twice instead of five times, and stone breaks on handling rather than on the road. The templater measures that route on the same visit, so the drawing leaves site already knowing the maximum piece. The laser records it along with everything else. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.

Is worktop templating the job you do most in Pratts Bottom?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop installation and worktop fabrication. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Two to three hours on site, with the sink, tap and hob physically present. Appliances on site, not on order. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Two to three hours on site, with the sink, tap and hob physically present. The room as it is, not as it was drawn.

What moves the number on a quote around here?

Galley runs are usually short enough to come out of a single slab, so the material band you choose does more to the total than the room shape does. Join positions and vein direction are marked on the template drawing before it leaves site. Real angles, not plan angles. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What needs to be ready before you come to Pratts Bottom?

Legs bottoming out on hard concrete or an uneven screed mean the tops of the carcasses are not one plane, and that is picked up at template rather than on fitting day. The laser plots it as it is, at the exact height the worktop will sit, and the drawing carries that through. Measured at worktop height, nowhere else. All runs and the island carcass fixed down and levelled to one datum, with the sink, tap and hob on site - an island cannot be templated while it is still loose or sitting on packers. Owner-occupied kitchens are usually being done once, which is why the edge profile, the vein direction and where a join falls are worth the conversation. A template booked hopefully around another trade is the commonest cause of a wasted visit. Fitted, fixed and level, then we come.

Next step

Worktop templating in Pratts Bottom, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7479 194398