Bromley · BR6

Kitchen worktops in Green Street Green

Post-war detached and link-detached with integral garages, so the kitchen usually backs onto the garage and the utility is a converted garage corner with a second worktop run. Kitchens are moderate size, typically an L plus a peninsula, and clients often want the garage side made into a proper laundry.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

The housing stock

What we are usually working with in Green Street Green

Blockwork with a hard render that has been patched over decades looks modern and behaves nothing like it. The fitting day is planned backwards from all of it, before the first piece comes off the van. One visit, our own installers.

Base units from the seventies and eighties are often only 500mm deep, so a 600mm stone top overhangs at the front and the doors want checking against it. Dry-laying comes first even where the walls look modern, because a skim patched over decades is not a straight line. The shell has the last word on fitting day.

The stock behind these kitchens runs to 1960s detached, 1970s link-detached, 1980s cul-de-sac housing and bungalow. Which of those you have decides most of what follows.

Access. Cul-de-sac layouts with turning heads, so the van can get right to the door, but garage-side entrances have a step and a fire door that limits swing.

There is nothing to visit in Green Street Green. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.

Borough
Bromley
Postcodes
BR6
Covered on
our south east London run
Lead time
5–10 working days from template

Get a fixed quote Free samples

  • 1960s detached
  • 1970s link-detached
  • 1980s cul-de-sac housing
  • bungalow

Bromley

The building, and what it does to the job

Handover kitchens are fitted with the cheapest carcass the specification allowed, and cam-lock chipboard boxes are what a stone top has to sit on. Cam-lock carcasses are pulled up square and screwed together properly before stone is bonded across them. The slow parts are slow for a reason.

Utility runs in converted garages sit on a different floor level to the kitchen, so we template the two areas as separate jobs even when it is one continuous cabinet line on the drawing.

Getting stone into the room

A loading bay or a red route puts a clock on the unload, so the pieces come off in the order they will be fitted rather than the order they were loaded. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. That is agreed before a plumber is booked.

Green Street Green in the housing figures

Around here the stock is houses, with hardly a block among them. No two kitchens are set out alike. We plan the strip-out and the carry as one movement so the kitchen is out of use for a day rather than a week. Out in the morning, sealed by the afternoon.

Corners and joins See the options

Nearby

We also work around Green Street Green

Green Street Green is one of 29 places we cover in Bromley. Our Bromley coverage

The whole New Malden patch

Questions

Working in Green Street Green

01

Is Green Street Green somewhere you actually work?

Yes. Post-war detached and link-detached with integral garages, so the kitchen usually backs onto the garage and the utility is a converted garage corner with a second worktop run. Kitchens are moderate size, typically an L plus a peninsula, and clients often want the garage side made into a proper laundry. Having the van on the drive means the load can be staged, so the heavy pieces come off last and go straight in instead of standing outside. The fitting slot is set around it, which is why we ask about it when the date is booked and not before we leave the yard. The van does not stay on a main road once it is empty.

02

What do Green Street Green kitchens tend to look like?

1960s detached, 1970s link-detached, 1980s cul-de-sac housing and bungalow. The kitchen is at the front or the back depending on the plan, and which it is decides whether there is a rear door on the route at all. Access is generally through the front door and a short straight hall into the kitchen, which is a good deal kinder than a Victorian terrace, though rear access through a back garden or shared path is often the better route if it exists. Old fabric gets handled as old fabric.

03

Is access difficult in Green Street Green?

Cul-de-sac layouts with turning heads, so the van can get right to the door, but garage-side entrances have a step and a fire door that limits swing. The van gets close to the door and the stone comes off the tail lift onto a trolley, which is about the shortest carry we ever get. With no room to turn, the old top gets cut up in the kitchen instead, which is dusty work and needs the room emptied first. The way out is measured with the way in.

04

Which jobs come up most often in Green Street Green?

Worktop installation and worktop replacement, in that order. Studio and one-bed conversions put the whole kitchen against a single wall, so the job is one run and everything depends on that one length. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. A builder-finish kitchen upgrades in a morning. Utility runs in converted garages sit on a different floor level to the kitchen, so we template the two areas as separate jobs even when it is one continuous cabinet line on the drawing.

05

What sets the figure on a Green Street Green quote?

An L can be mitred at the corner for a continuous look or butt-jointed over the gable, and the two are different money and different risk. On the day that means dry-laying the whole layout first and only then pulling and bonding the joins. A corner that will not close is never forced. Floors settle, and once base units are packed and levelled properly the stone sits true while everything else in the room admits it is not. This is the commonest reason a replacement turns out to need more than a straight swap. Levels get corrected before the new top is measured. Material is from £110 per square metre supply only, and the templating, the fabrication and the fitting are each quoted on their own line.

06

Do you handle managed buildings in Green Street Green?

Because the money comes out of a household rather than a maintenance budget, phasing is common: tops now, island or splashbacks later, quoted so the second visit still matches the first. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Two visits mean two people taking a day off. If we know the building when you book, the lift, the stair turn and any freeholder notice are worked into the day rather than found on it.

07

When do I pay for a Green Street Green worktop?

Two kitchens the same length can be far apart, because material, edge and cut-outs move independently of size. The quote is written from the template drawing. Before that it works from what you have described. No installed price per square metre is published, because it is not a real number. A junction between an original floor and a later extension slab is almost never at the same level, so units carrying a run across it need packing first. We would rather find it at template than on the morning, which is why the templater looks behind the units. Same footprint, different tolerances.

08

Does a stone worktop need sealing?

Upkeep is settled when the slab is chosen, since it belongs to the material rather than the fabrication. Topping a seal up is a wipe-on job with a cloth. Bleach and limescale remover harm a polished finish rather than clean it, whichever material is on the units. These were built on a solid ground floor slab, so nothing bounces and nothing can be packed down, only up. The fitting itself is about squaring up to walls that look modern and are not: block or breeze walls with a skim that has been patched over decades, so we still dry-lay and scribe rather than trust the template edge. Lath and plaster is not a fixing, and is treated accordingly.

09

Where will the joins be?

A mitred join at a corner is a different job from a butt join along a run, and they are not priced the same. Each join is an item on the drawing, so the layout and the figure move together. An island often runs in one piece where a wall run cannot. Where the return runs into a wall that is out of square, the corner is templated as the angle it really is rather than as ninety degrees. A layout that has been packed and levelled run by run instead of to one datum shows as a step where two pieces meet. Pieces are carried in the order they are laid.

10

Can the sink be undermounted rather than sat on top?

The tap hole is drilled in the workshop too, and its position depends on how far the tap has to swing. If the sink or hob changes after the template, the drawing changes first and nothing is cut meanwhile. A boiling tap needs a hole of its own and a cupboard below for the tank, so the units change too. A mitred corner is cut and dressed as a matched pair, and if either leg shifts by a millimetre on site the joint opens along its whole length rather than at one end. Joins are pulled with suction clamps and finished flush, then colour-matched, which is the last thing done rather than the first. The return is offered up last.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Lovely team, business and quality motivated, prompt delivery with installation. Affordable prices. Wide range of worktops available. High recommendation”
Loreta SkalisieneGoogle review
★★★★★
“Great service. Super quick and easy communication. I love my new worktop 🥹🥹”
Sara ArghirGoogle review
★★★★★
“Professional, polite and friendly service. Very pleased with finished product.”
costas andrewsGoogle review

Next step

Get your Green Street Green kitchen priced

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.