Queen's Park kitchens
The kitchens we meet in Queen's Park
A survey is where splashback and upstand work in Queen's Park stops being a guess, because until someone has stood in the kitchen nobody knows what it is going to ask for. Uniform two-storey terraces where nearly every improved house has done the same thing: infill the side return and add a rear extension, producing a wide kitchen-diner with a 4m run along the party wall and a 2.4m island under a roof light. Marble-look quartz on the island with a separate utility in the old lean-to is the recurring brief. We measure the kitchen you have, not the kitchen the plans said you would have. Those two part company often.
Original quarry tile is often still down under two or three later floor coverings, which is why the finished floor height is rarely what anyone expects. Cutting sockets and switch plates into stone is a workshop operation, so the electrics have to be final before the template. Sockets cut in the shop, not on site.
There is a solid base under the old scullery end and suspended timber where the addition meets the house, and the two part company along that joint. Sockets and switches are cut to measured positions with the faceplates off, not to the positions shown on a drawing. A chimney breast breaks the run and the panels follow it.
What the research records here is late Victorian terrace, Edwardian terrace and small purpose-built block. What is behind the plaster is different in each, and it matters at fixing.