Bexley · DA14 DA15

Splashbacks and upstands in Sidcup

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Capri White island beside the belfast sink, tulips on a brass tray and a wooden stool tucked under the overhang

Sidcup kitchens

The kitchens we meet in Sidcup

The reason splashback and upstand work in Sidcup is quoted per kitchen rather than per metre comes down to the range of rooms these worktops end up in. A wider range than the rest of Bexley: Edwardian and interwar detached houses with large kitchen-breakfast rooms and islands, plus town-centre and retirement flats with compact 2.4m runs. The bigger houses take 4m-plus runs and a separate utility. If you are not sure which of those describes your kitchen, that is normal, and it is exactly what the template visit settles.

These were built with a coal store and an outside lavatory off the back, and where those got absorbed into the kitchen the walls around them are thinner and later. Cutting sockets and switch plates into stone is a workshop operation, so the electrics have to be final before the template. A return into a reveal is its own scribed piece.

The rear wall now carries french or folding doors across most of its width, so a whole side of the room opens and a long piece comes straight in off the garden. Where a full-height panel is wanted, the wall is made good first or the panel rocks on the high spots. Where the plaster undulates, the shorter piece wins.

The mix here is Edwardian villa, 1930s semi and detached, 1960s flats and 2010s town-centre apartment block. That is why the same worktop costs differently two doors apart.

Undermounted sink cut-out in a quartz worktop
  • Edwardian villa
  • 1930s semi and detached
  • 1960s flats
  • 2010s town-centre apartment block

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • The joint to the worktop is siliconed, never grouted.
  • Upstands are small pieces, so they usually come out of the offcut the worktop leaves.
  • Dekton and sintered stone are stable in heat and daylight, which is why they suit a wall behind a hob.
Borough
Bexley
Postcodes
DA14, DA15
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Sidcup is its own job

Before we quote a length in Sidcup we want to know how the stone gets in and what it will be sitting against. The High Street and the main road junction are congested with limited loading, but the residential roads have generous drives; the apartment blocks near the station have controlled parking and a lift. Two different jobs in one postcode, a detached-house island in one piece, and a lift-restricted flat run in three. Three to seven working days sit between the template and the fit, and everything difficult gets solved in that gap.

The work

What worktop splashbacks & upstands involves

The pieces are made to the wall they will stand against, so they are not stock items and cannot be ordered from a size. Each one is drawn for its own stretch of wall. The wall is read for how flat and how plumb it is before anything is drawn, because a panel that stands off a bowed wall at one end shows it along its whole length. You end up with a continuous run of stone from the worktop up, cut from the same slab batch so the colour matches where the two pieces meet.

Upstands and splashbacks are drawn, priced and made as their own piece of work, not thrown in as an offcut at the end of a worktop order. A window sill sitting lower than the surface settles the argument on its own: the strip runs into the reveal, returns, and the wall above is left alone. The old larder wall in these houses is a single skin with a bow through it, and a hand's width of stone hides what a tall sheet would advertise. Cut from the slab the worktop came out of.

Sink cut-outs See the options

The money

What it costs in Sidcup

Cutting from the same slab run as the worktop is what keeps the colour matched, and ordering the two together is cheaper than ordering them apart. Overhangs, a waterfall end and seating all add machining, and an island is where those decisions cluster. Across the catalogue the supply-only rate is £110 to £550 per square metre, before any of the work that turns a slab into a worktop. Ordered with the worktop, and cheaper for it.

period detached houses and villas

What Sidcup asks for

The housing on this patch does not throw up much of this. It throws up worktop installation. When it does come up, it gets the same template, the same bench and the same crew.

period detached houses and villas

The shape of the run

Waterfall ends are cut in sequence off the length either side of the top so the vein carries down the leg, and that sequence is gone the moment a piece has to be recut. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Panel widths answer to the slab before the wall.

period detached houses and villas

Sidcup in the housing figures

Across this patch the post-war share is among the larger ones in the capital. Socket and switch positions have to be final before the panel is templated. Cut from the same batch as the surface below.

Access

Getting stone into a Sidcup kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Sidcup is covered on our south east London run, along with the rest of Bexley.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Sidcup

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you cover Sidcup?

Yes. Sidcup is on the patch, and the postcodes we work here are DA14, DA15. It is worked on our south east London run, along with the rest of Bexley. Where the permit is a digital session rather than a paper one, somebody in the house has to start it at the hour the van actually arrives. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. A tall panel and a timed bay is the worst combination here. The work comes to you. We template in your kitchen and fit in your kitchen, with nothing to visit or collect.

02

What should I expect from worktop splashbacks & upstands in a Sidcup kitchen?

The room is wide enough that an island turns up in nearly every scheme, and how far the drainage can be taken is what fixes where it sits. These kitchens are nearly always retiled at least twice, and stripping the old tiles takes the bottom course of plaster with it because the original laminate top ran underneath the tiles rather than up to them. The tile bed comes off before anything is measured. A chimney breast left in place splits a wall into two alcoves, and the two are rarely the same width and rarely parallel to each other. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Height follows the sill, not the plan.

03

How would you get a worktop into a property in Sidcup?

Car depth is the number that settles it wherever a piece cannot be stood upright, and most residential cars are shallower than the run they are serving. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Joint positions follow from that. A resident bay and a shared-use bay can sit on the same street under different rules, and it is usually the shared one a visitor permit or a ticket touches. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. They go in with the first load where the stop is short.

04

Does Sidcup actually ask for worktop splashbacks & upstands?

No, not particularly, and it would be easy to say otherwise. What the research on this patch actually lists is worktop installation. That is the local housing talking rather than anything about the job. It is priced, cut and fitted no differently here than anywhere else we cover. Extension budgets are usually well spent by the time the worktop is ordered, which is where the choice between quartz and a thinner sintered stone actually gets made. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Full height behind the hob is less for a tenant to scrub. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Grout lines are the first thing to fail in a let.

05

What moves the number on a quote around here?

Everything on an island is fed from underneath, extraction, a socket run, a hob and sometimes a waste, and each of them wants its hole before the top is bonded down. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Vein direction carries up from the top below. The material band is £110 to £550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

06

What state does a Sidcup kitchen have to be in before you template?

Alcove pieces get cut oversize on both scribe edges, with the true wall angles carried on the template drawing rather than assumed. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. Scribed along the top edge as well. The old tiling must be off and the wall made good and dry before templating, not on fitting day. Because the money comes out of a household rather than a maintenance budget, phasing is common: tops now, island or splashbacks later, quoted so the second visit still matches the first. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Whoever specifies it signs the drawing.

07

What if the stone cannot get up the stairs in a Sidcup flat?

Every piece goes in by hand and stone does not bend, so the tightest turn on the route sets the longest piece. What decides it is not the width of the stairwell but the length of piece that can be turned in it. A car ceiling at 2.2m sets the tallest thing that will stand in it, and the trap panel and light fitting take a slice off even that. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. It decides panel size before anything is cut.

08

What do you need from me for the sink and hob cut-outs?

The tap hole is drilled in the workshop too, and its position depends on how far the tap has to swing. Where the hob lands is set out against the units and the wall behind, not off the kitchen plan. Nothing is cut out in the kitchen. Cutting a bowl on site is how worktops get cracked. Island units are rarely fixed to anything at first fix, so they get screwed to the floor and levelled against the perimeter run before the stone is measured at all. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. Behind an island there is no wall to hide against.

09

How much upkeep is a stone worktop?

Upkeep is settled when the slab is chosen, since it belongs to the material rather than the fabrication. Granite tells you when the seal wants topping up: water stops beading on the surface and starts darkening it instead. No maintenance visit is built into the job. Soap, water, and on the porous stones a seal. The boiler has usually been moved out to the garage or the utility, leaving a capped flue and a run of dead pipework in the kitchen wall. That leaves a ragged band right where the upstand has to sit, which is fine for a 100mm upstand that covers it, but a full-height splashback needs the wall made good first or it will rock on the high spots. Panels expose a wall; upstands forgive one.

10

Can you machine drainer grooves into the stone?

Grooves and an undermounted bowl are usually specified together, since the grooves are run to the bowl edge. Machining is permanent. If a later kitchen moves the sink, the grooves stay where they were cut. Where there is no room for a separate drainer, grooves are usually what gets specified instead. The extension slab was poured to its own level, so there is a lip or a ramp where the new floor meets the original one. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Panel thickness changes what the sockets need behind them.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“I am really happy with the work! He fitted my kitchen granite worktop really nicely and got the job done on time, just as promised. He was friendly, professional, and made sure everything was done the way I wanted. Would definitely recommend Karam to anyone looking for a great job!”
esther boaduGoogle review · granite
★★★★★
“Nice work from worktop worx. Highly recommended”
Rasika KumarageGoogle review
★★★★★
“Lovely team, business and quality motivated, prompt delivery with installation. Affordable prices. Wide range of worktops available. High recommendation”
Loreta SkalisieneGoogle review

Next step

Splashbacks and upstands in Sidcup, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.