Bexley · DA15

Splashbacks and upstands in Blackfen

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Capri White island beside the belfast sink, tulips on a brass tray and a wooden stool tucked under the overhang

Blackfen kitchens

The kitchens we meet in Blackfen

People ring us about splashback and upstand work in Blackfen at the point where they have a kitchen in mind and no idea what their own walls are going to do to it. Textbook 1930s suburbia: bay-fronted semis with a rear kitchen, larder and separate dining room. The volume of work is knock-throughs and new 3.5m runs, with rear extensions on the longer gardens toward the park. Send through a photograph or two and the rough run length. We will tell you what you are probably dealing with.

Where the side return has been filled in, one side of the new room is old brick and the other is new blockwork, and the two do not behave alike. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Siliconed to the top, never grouted.

The chimney breast in the corner has usually been left in place, so the run gains a return and two scribed ends. These kitchens are nearly always retiled at least twice, and stripping the old tiles takes the bottom course of plaster with it because the original laminate top ran underneath the tiles rather than up to them. A chimney breast breaks the run and the panels follow it.

The building stock is 1930s semi, interwar parade flats and postwar infill. Two of those can sit on the same street and quote a long way apart.

Undermounted sink cut-out in a quartz worktop
  • 1930s semi
  • interwar parade flats
  • postwar infill

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.
Borough
Bexley
Postcodes
DA15
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Blackfen is its own job

Every area has its own complications, and in Blackfen these are the ones that decide the day. Wide roads with verges, drives and dropped kerbs almost everywhere; the shopping parade is the only stretch with waiting restrictions. The original larder recess is usually where the tall units end up, plan the return around it rather than losing 400mm of run. Everything above is looked at on the free design visit, and none of it is charged for until the template.

The work

What worktop splashbacks & upstands involves

The work carries the same five year workmanship guarantee as the worktop and is done by the same installers, which is why it is booked as part of the same job. These are templated after the worktop is fitted and settled, never before, so they scribe to the wall the worktop actually meets. Socket and switch positions need to be final first. You end up with the room finished. The wall was the last thing outstanding, so once these pieces are on there is nothing left waiting on another visit or another trade.

Behind a hob the choice of material stops being about looks: a resin-based surface will mark under sustained heat where a sintered one will not. The exposed edge of an upstand is polished and eased the same way as the front of the worktop, because it sits at eye level and gets looked at more. These kitchens were pushed into the side return at some point, and the seam between original brickwork and newer plaster falls exactly where a tall sheet wants to sit. One sheet, two seams, nothing to reseal.

Sink cut-outs See the options

The money

What it costs in Blackfen

Cutting from the same slab run as the worktop is what keeps the colour matched, and ordering the two together is cheaper than ordering them apart. Short lengths nest well and waste little, so the material line is usually the kindest part of a galley quote. Supply is £110 to £550 per square metre, and it is the least interesting line on the quote, because the operations listed underneath it are what separate one job from another. Same slab run, and the quote says so.

1930s and inter-war semis

Blackfen in the housing figures

On the Blackfen streets we cover, most of the stock dates from the building boom of the twenties and thirties. The same wall build-up comes up again and again, so what works on one holds for the next. Cut around the electrics as they are, not as drawn.

1930s and inter-war semis

What Blackfen asks for

Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. The offcuts finish the room.

Not typical work for this area. Worktop installation and worktop replacement are what the housing asks for. The process is unchanged; only how often we are on the street differs.

Access

Getting stone into a Blackfen kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Blackfen is covered on our south east London run, along with the rest of Bexley.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Blackfen

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Are you set up to work in Blackfen, or is it a subcontractor?

Yes. Blackfen is on the patch, and the postcodes we work here are DA15. It is worked on our south east London run, along with the rest of Bexley. A dropped kerb wide enough for a car is not always wide enough for a long-wheelbase van, and the width of the crossing decides the rest. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. Distance from tail lift to door is the whole risk here. Your part of it happens entirely at home, with nothing to travel to and nothing to bring back.

02

What do the kitchens in Blackfen do to worktop splashbacks & upstands?

These kitchens have been retiled at least twice, and stripping the tiles takes the bottom band of plaster with them because the old laminate ran underneath rather than up to them. That leaves a ragged band right where the upstand has to sit, which is fine for a 100mm upstand that covers it, but a full-height splashback needs the wall made good first or it will rock on the high spots. Where the plaster undulates, the shorter piece wins. The returns into a breast recess are the tightest scribes in the room, and they are eased in rather than forced. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Scribe the top edge too or it stands off.

03

Do you have trouble getting long pieces into Blackfen kitchens?

A level threshold with hard standing outside it is the one arrangement where a full run goes in without a single re-grip. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. A panel that would need turning indoors is turned outside instead. Where a car has to come off the drive first, it is worth knowing whose car it is and whether the keys are in the house on the morning. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. A long carry turns a light piece into an awkward one.

04

Do you get much worktop splashbacks & upstands work in Blackfen?

No, not particularly, and it would be easy to say otherwise. What the research on this patch actually lists is worktop installation and worktop replacement. That is the local housing talking rather than anything about the job. It is priced, cut and fitted no differently here than anywhere else we cover. Extension work runs late far more often than it runs early, and the worktop is close to the last thing in, so the date agreed at the start is rarely the date that happens. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Less to clean, for whoever cleans it. Where a family has been living around a building site for months, the finish date carries more weight than any other part of the specification. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Panels for every unit, cut in one go.

05

What decides the price of a worktop in Blackfen?

A dishwasher door on one side and an oven door on the other cannot both stand open in a narrow aisle, so which appliance goes where matters more in this shape than in any other. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. External corners are mitred, not butted. The supply-only figure for material runs £110 to £550 per square metre, and templating, fabrication and fitting are lines of their own.

06

What do I need to sort out first?

An alcove is commonly wider at the back than at the front, so a piece cut to the opening drops in and then stands off the rear wall. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. The sill caps the upstand before anything else does. The old tiling must be off and the wall made good and dry before templating, not on fitting day. The householder is normally on site at template, and that is the right time to settle sink position, tap centres and overhang rather than agree them by email. Full-height panels need the wall made good first, which is another trade and another timescale. Full height is decided before fabrication, not after.

07

Do I have to get rid of the old tops myself in Blackfen?

The sink and hob are lifted out with the old top and kept aside if you are reusing them. Disposal means it goes in the van, not into the garden to wait for a collection. Carcasses stay. Surface changes. That is the whole of it. A gate post set narrower than the opening looks generous from the road and stops a wide piece a metre in. Full-height panels are the awkward thing to move, light enough to lift and long enough to flex on the way. Panels come across in one pass with the route already cleared.

08

What happens if a piece is damaged on the fitting day?

Most breakages happen on the carry, which is why the route is walked and measured before anything comes off the van. A remake goes back through the same cutting and polishing, so it is a return visit rather than a patch. Floors and units are protected before anything comes through the door. The tail lift is still the pinch point, because the piece has to be walked off it onto the trolley while it is sitting at chest height. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. What can be got into the room decides the height above the worktop.

09

Will you fit stone onto units that are not level?

Packing takes up small variation. It is not there to hide something that belongs in the units. Variation past what packing can take up has to be corrected in the carcasses before we cut, because the template records the units as they stand. An island is where this usually shows, standing free with no wall to level against. The face of a breast is rarely flat, and a top returning onto it picks up that bow across the last few hundred millimetres of its length. It decides whether the run gets one continuous piece or a set of separate lengths with a joint at every obstruction. A downstand sets the panel height, not the wall units.

10

Can you fit stone I have already bought for a Blackfen kitchen?

Delivery to the workshop has to be arranged and dated, since nothing is nested until it is there. Sinks, taps and hobs are yours to buy in any case, and they only have to be in the room for the template. Stone cut to somebody else’s drawing cannot usefully be re-cut to yours. An open-plan extension puts the worktop in the middle of the living space, so it is looked at from the sofa as well as worked on. Upstands are the cheapest way to finish several kitchens consistently, and they come out of the offcuts the tops leave behind. A spare panel is cheaper now than next year.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Perfect service,the best on this job”
Kleant IstrefiGoogle review
★★★★★
“I recently had my kitchen worktop and splashback done by Karem from Worktop WorX and i am very pleased with the result. From the initial consultation and measurements to the final installation, the whole process was smooth and professional. The attention for details and the quality made the difference and everything was finished to a high standard. I definitely recommend Worktop WorX to anyone looking for reliable and high quality kitchen work”
Alexandru BalintGoogle review
★★★★★
“Really impressed with the quality and finish of these worktops. Great range of materials, precise fabrication, and smooth communication throughout. The whole process was easy and the final result looks fantastic. Highly recommend!”
Nastasia DragoGoogle review

Next step

Splashbacks and upstands in Blackfen, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.