Skip to content

Newham · E16

Kitchen worktops in Silvertown

The 1990s village housing has small enclosed kitchens of about 2.4m that owners open into the dining room for a peninsula, while the newer dockside apartments have open-plan kitchens with an island of 1.6m to 2m facing the water. Warehouse-style conversions have exposed structure and a kitchen set out as a free-standing run.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

The housing stock

What we are usually working with in Silvertown

1990s Britannia Village housingconverted industrial buildingrecent dockside apartment block

The 1990s village housing has small enclosed kitchens of about 2.4m that owners open into the dining room for a peninsula, while the newer dockside apartments have open-plan kitchens with an island of 1.6m to 2m facing the water.

The catch is that new blocks are gated with limited visitor access and single-lift cores, and some plots are only reachable via a long one-way loop round the dock. Warehouse-style conversions have exposed structure and a kitchen set out as a free-standing run.

Vehicle access is easy but the buildings are not, so the constraint shifts from the street to the lift and the flat's entrance door.

Roads here are wide, industrial in character and largely unrestricted, so a large van can get right up to most buildings, which is unusual for the Docklands.

The stock behind these kitchens runs to 1990s Britannia Village housing, converted industrial building and recent dockside apartment block. A quote that ignores which one you have is guessing.

Developer carcasses are thin cam-lock chipboard, which is entirely adequate under laminate and wants bracing before stone. Old top out in the morning, new stone down and sealed the same afternoon, with a plumber either side of us. Stone is far heavier than what is coming off.

A riverside block is a managed building with a booked goods lift, a loading bay and a concierge, and all three have to line up on the same day. If the diagonal is short we either split the run with a planned join or, on lower floors, carry up the stairwell, which needs the half-landing turn checking as well. Walked, measured, protected, then lifted.

The room is genuinely square and the units are plumb, so the visit is more about the building than about the kitchen. The lift is measured before the piece is loaded, and once inside the flat the fitting is quick by comparison. That is the shape of the day.

An island is a single visible piece with four finished edges and no wall to hide against, so it is the piece the whole kitchen is judged on. A layout that has been packed and levelled run by run instead of to one datum shows as a step where two pieces meet. Dry-lay first, always.

Access. Roads here are wide, industrial in character and largely unrestricted, so a large van can get right up to most buildings, which is unusual for the Docklands. The catch is that new blocks are gated with limited visitor access and single-lift cores, and some plots are only reachable via a long one-way loop round the dock.

At a glance

Borough
Newham
Postcodes
E16
Covered on
our east London run
Lead time
3–7 working days from template

There is nothing to visit in Silvertown. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.

Questions

Working in Silvertown

Do you fit kitchen worktops in Silvertown?

Yes. The 1990s village housing has small enclosed kitchens of about 2.4m that owners open into the dining room for a peninsula, while the newer dockside apartments have open-plan kitchens with an island of 1.6m to 2m facing the water. Warehouse-style conversions have exposed structure and a kitchen set out as a free-standing run. Where the van can pull up level with the gate the pieces are handled the fewest times, which is what actually protects them. The fitting slot is set around it, which is why we ask about it when the date is booked and not before we leave the yard. It is why the arrival time is what it is.

What kind of kitchens do you usually work on in Silvertown?

1990s Britannia Village housing, converted industrial building and recent dockside apartment block. Floor-to-ceiling glazing lights the worktop from one side all day, which shows every ripple in a polished surface and every gap at a scribe. Everything comes up in the lift, so we measure the lift car's internal diagonal before the piece is loaded, because a car that takes 2.4m on the diagonal will not take a 3m worktop no matter how you stand it. The slow parts are slow for a reason.

Is access difficult in Silvertown?

Roads here are wide, industrial in character and largely unrestricted, so a large van can get right up to most buildings, which is unusual for the Docklands. The catch is that new blocks are gated with limited visitor access and single-lift cores, and some plots are only reachable via a long one-way loop round the dock. Where the lift will not take the longest run we design a join in rather than gamble, because a piece that will not go up has to go back on the van. The fitting day is planned backwards from that point, before anything comes off the van. That is what the morning is planned around.

What do you get asked for most in Silvertown?

Worktop installation, worktop templating and worktop replacement, in that order. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. The template visit is booked once the units are genuinely in, not when they are nearly in. Units fitted, fixed and level first. Vehicle access is easy but the buildings are not, so the constraint shifts from the street to the lift and the flat's entrance door.

What decides the price of a worktop in Silvertown?

If the island is a few hundred millimetres longer than the usable length of a slab, a second slab gets bought to gain that overhang, and the whole slab is paid for rather than the part used. On the day that means dry-laying the whole layout first and only then pulling and bonding the joins. Dry-lay first, always. Dot-and-dab plasterboard sounds solid and is hollow behind, so anything fixed through it has to hit a dab or a batten rather than a void. One measurement never describes it, which is why a tape reading taken before the visit rarely matches the template. Plotted, not estimated. Material runs from £110 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines rather than rolled into one figure.

Do you work in flats and leasehold properties in Silvertown?

A street with houses in single occupation next to the same houses cut into flats produces two completely different jobs from the same elevation. The template happens when the units are in, fixed and level, whoever is fitting them. No stone is cut from a plan. Tell us the building when you book and the lift, the stair turn and any freeholder notice get built into the day rather than found on it.

Next step

Get your Silvertown kitchen priced

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489