The housing stock
What we are usually working with in Canning Town
There is nearly always a boxed soil stack or a service riser in a corner of the run, and it is rarely mentioned at enquiry. Levelling is done under the units and not under the stone, so anything out is corrected before a piece is lifted in. The join is polished flat before we call it done.
New blocks require the managing agent to sign off a delivery slot, and lift dimensions vary a lot between phases of the same development. The area is carved up by flyovers, the tunnel approach and red routes, so the practical unloading point is often inside an estate or a development service yard rather than the nearest road.
The skim over dense block is thin and dishes out round a hole, so a fixing wants a hammer drill and the dust travels through the flat. A short band of wall over the sink is often better filled by one panel than by an upstand and a strip of tile above it. A hundred millimetres covers more than it looks.
The building types here are post-war council estate, 1980s low-rise and 2010s onwards regeneration apartment block. Which one you have changes the order of the day more than the design does.
There is nothing to visit in Canning Town. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.