Skip to content

Kensington and Chelsea · SW7

Kitchen worktops in South Kensington

The Thurloe and Onslow estate houses run to five or six storeys with a full basement, and the kitchen sits at basement level under the front pavement vault, often with a light well at the front and a dining room behind. Runs of 3.6m plus a substantial island are common, and stone is frequently specified as a full slab splashback behind the range because there is no window on that wall.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

The housing stock

What we are usually working with in South Kensington

1840s-50s stucco crescent and terraceItalianate garden square houseVictorian mansion blockembassy-scale townhouse

Runs of 3.6m plus a substantial island are common, and stone is frequently specified as a full slab splashback behind the range because there is no window on that wall.

Under-pavement vaults and cellar lids look solid and are not - never set an A-frame down on the flags in front of these houses without seeing what is underneath. Cromwell Road and the museum roads are heavily restricted, and the residents' bays fill early, so an early morning slot is worth having. Most of it is listed or in conservation area with pavement vaults, so you cannot stack slabs on the flags outside without checking the vault below, and the front area steps down to the basement door are the usual route in. The Thurloe and Onslow estate houses run to five or six storeys with a full basement, and the kitchen sits at basement level under the front pavement vault, often with a light well at the front and a dining room behind.

What we are usually templating in is 1840s-50s stucco crescent and terrace, Italianate garden square house, Victorian mansion block and embassy-scale townhouse. Each of those behaves differently once the old top comes off.

The kitchen normally sits in the back addition or a later side return, which puts the run against the oldest and least straight wall in the building. The workshop works to the template drawing and to the measured route, in that order. The drawing decides it before the saw does.

Wider halls make the carry noticeably easier, and that alone can remove a join that a narrower terrace would have forced into the run. The day is planned backwards from the hall. The slow parts are slow for a reason.

The back addition is a narrow two-storey outrigger with a single external wall, and the kitchen galley runs the length of it. The day is planned backwards from the hall. Walked, measured, protected, then lifted.

A junction between an original floor and a later extension slab is almost never at the same level, so units carrying a run across it need packing first. It is fabrication time rather than material, so it appears on the fabrication line and not in the square metre figure. Better on the quote than in a variation.

Access. Most of it is listed or in conservation area with pavement vaults, so you cannot stack slabs on the flags outside without checking the vault below, and the front area steps down to the basement door are the usual route in. Cromwell Road and the museum roads are heavily restricted, and the residents' bays fill early, so an early morning slot is worth having.

At a glance

Borough
Kensington and Chelsea
Postcodes
SW7
Covered on
our west London run
Lead time
3–7 working days from template

There is nothing to visit in South Kensington. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.

Questions

Working in South Kensington

Do you fit kitchen worktops in South Kensington?

Yes. The Thurloe and Onslow estate houses run to five or six storeys with a full basement, and the kitchen sits at basement level under the front pavement vault, often with a light well at the front and a dining room behind. Runs of 3.6m plus a substantial island are common, and stone is frequently specified as a full slab splashback behind the range because there is no window on that wall. On a street with no restrictions the constraint is other residents rather than a warden, so it is worth putting a cone or a car out early. It sits in the fitting line as time on site rather than as anything to do with the stone. Nothing here is added after the fact.

What kind of kitchens do you usually work on in South Kensington?

1840s-50s stucco crescent and terrace, Italianate garden square house, Victorian mansion block and embassy-scale townhouse. Half-landings mean the back of the house sits at a slightly different level from the front, and a knocked-through kitchen crosses that line. We measure the front door, the hall width and the turn into the kitchen before anything comes off the van, because a 3m piece has to swing through that corner on edge and stone does not bend to help you. That is the shape of the day.

Is access difficult in South Kensington?

Most of it is listed or in conservation area with pavement vaults, so you cannot stack slabs on the flags outside without checking the vault below, and the front area steps down to the basement door are the usual route in. Cromwell Road and the museum roads are heavily restricted, and the residents' bays fill early, so an early morning slot is worth having. Door width, hall width and the diagonal at the turn are three separate measurements, and it is the diagonal that catches people out. The fitting day is planned backwards from that point, before anything comes off the van. That is what the morning is planned around.

What do you get asked for most in South Kensington?

Worktop design & quotation, worktop fabrication and worktop installation, in that order. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. That changes what the quote should be compared against, because the shape of the job is not the same as a single family kitchen. Itemised, so it can be compared honestly. Under-pavement vaults and cellar lids look solid and are not - never set an A-frame down on the flags in front of these houses without seeing what is underneath.

What decides the price of a worktop in South Kensington?

On a heavily veined stone the island and the run behind it are nested off the same area of slab so the movement relates across the room. On the day that means dry-laying the whole layout first and only then pulling and bonding the joins. Dry-lay first, always. Legs bottoming out on hard concrete or an uneven screed mean the tops of the carcasses are not one plane, and that is picked up at template rather than on fitting day. This is the item most often left out of a cheaper quote, and it comes back as a variation once the templater has been. Priced as fabrication, not as area. Material runs from £110 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines rather than rolled into one figure.

Do you work in flats and leasehold properties in South Kensington?

Mixed ownership means the decision-maker is not always the person who lets us in, so it is worth being clear early about who signs the quote off. Nothing is payable until we template, so a quote can sit while consents and decisions catch up. Written to be read by whoever is paying. Tell us the building when you book and the lift, the stair turn and any freeholder notice get built into the day rather than found on it.

Next step

Get your South Kensington kitchen priced

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489