The housing stock
What we are usually working with in Gloucester Road
Permitted working hours, a porter and a booked lift set a hard finish time on the day whatever stage the fit has reached. Almost everything that makes a fitting day hard is a property of the building rather than of the stone. Silicone finishes the job; it does not rescue it.
The lifts are old, often around 1000mm by 1300mm internally with a low car ceiling, which caps a stood-on-edge slab at roughly 2.2-2.4m unless the stairs are used instead.
The flats are stacked identically, so the kitchen above sits directly over this one and its waste passes through the same boxing. The lift is boarded and blanketed before the first piece leaves the van, and the porter is told the sequence. Movement joints in the shell stay movement joints.
What the job sheets keep listing is red-brick and terracotta mansion block, stucco garden square terrace, hotel and serviced apartment conversion and 1930s purpose-built flats. Each carries its own carry problem before it carries a worktop.
Access. Blocks here have a front porter's desk and a separate tradesman's entrance round the side, and materials go in the service lift only, with protective blankets on the walls.
There is nothing to visit in Gloucester Road. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.