City of Westminster · WC2R WC2N

Splashbacks and upstands in Strand

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Capri White island with a brass bridge tap over the sink, the range cooker and lantern pendants beyond, dressed with eucalyptus

Strand kitchens

The kitchens we meet in Strand

Most of the splashback jobs we do in Strand land in one of a few kinds of kitchen, and which one you have changes the job long before the stone is ordered. Barely any family housing - the stone work here is tea points, staff kitchens and small serviced apartment kitchenettes in office and hotel buildings. Standard job is a 2m to 3m counter with an undermount bowl, a boiling tap cut-out and a matching upstand, repeated across several floors. You do not have to work out which of those you have. We will look at it with you when we come to Strand.

Lath and plaster, a settled floor and a hall with a turn in it are the three things that decide how this job runs. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. An upstand asks less of old plaster than a panel does.

Rear rooms of this date have a wide sash or a pair of garden doors, so a good deal of the wall the run wants is glass. Sockets and switches are cut to measured positions with the faceplates off, not to the positions shown on a drawing. Old plaster rarely gives you a flat metre.

What the research records here is Victorian commercial block, Edwardian chambers and hotel and office building. They are not interchangeable, and a worktop finds the differences quickly.

Mitred waterfall edge detail on a quartz island
  • Victorian commercial block
  • Edwardian chambers
  • hotel and office building

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • The same fitters who install the worktop put the stone on the wall.
  • Wall pieces are priced by the square metre like everything else, from £110 upwards.
  • Edges are polished on every side that shows, including the top edge of an upstand.
Borough
City of Westminster
Postcodes
WC2R, WC2N
Covered on
our central London run
Fitted
5–10 working days from template

The place

Why Strand is its own job

Working in Strand regularly means we plan for what catches people out here rather than finding it on the day. Red route with no stopping along the Strand itself and constant event and works closures around Aldwych and Trafalgar Square. Access is via a basement loading bay with a height restriction, a booked goods lift, and building security requiring method statements in advance. Repeat tea points across floors look identical on the drawing but never are - template each floor separately, the risers and boxings move. Have a look at the itemised quote and you can see what the building is costing and what the stone is costing.

The work

What worktop splashbacks & upstands involves

The choice is not all or nothing. A kitchen can take slim upstands along the run and a taller piece behind the hob alone, and the two are priced as separate items. These are templated after the worktop is fitted and settled, never before, so they scribe to the wall the worktop actually meets. Socket and switch positions need to be final first. You end up with sockets and switches sitting in openings machined for them, which is the difference between a panel made for the wall and one cut to clear whatever was on it.

Fitting them is a couple of hours with no water, gas or electricity touched, which is why it usually comes back as a short return visit. Openings in a tall sheet are given a radiused internal corner rather than a square one, because a sharp internal corner in thin material is where a crack begins. In a house this old the wall behind the run has been skimmed over lath in one bay and dot-and-dabbed onto brick in the next, and a tall sheet finds both. One sheet, two seams, nothing to reseal.

Waterfall ends See the options

The money

What it costs in Strand

A full-height splashback costs more than an upstand for the obvious reason and one less obvious one: there is more to scribe and more to machine around. Short lengths nest well and waste little, so the material line is usually the kindest part of a galley quote. The stone itself is £110 to £550 per square metre supply only; everything done to it is priced separately and shown separately. Same slab run, and the quote says so.

Victorian and Edwardian terraces

The carry, and what it rules out

A car that takes 2.4m on the diagonal will not take a three-metre worktop however it is stood, and there is no trimming it on the landing. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. It decides panel size before anything is cut.

Victorian and Edwardian terraces

What Strand asks for

The research on this patch does not put this among the three commonest jobs. Worktop fabrication and worktop installation do. That changes how often we are here, not how the work is done.

Victorian and Edwardian terraces

Strand in the housing figures

Taken across Strand and the roads either side of it, this is high-band housing on the council tax measure. The lift car is part of the specification here. Splashbacks are cut from the same slab run as the tops, so the decision has to be made before fabrication starts. Set out around the sockets as they actually are.

Access

Getting stone into a Strand kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

Central London patch

Strand is covered on our central London run, along with the rest of Westminster.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Strand

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do you cover Strand?

Yes. Strand is on the patch, and the postcodes we work here are WC2R, WC2N. It is worked on our central London run, along with the rest of Westminster. The realistic answer on a main road is an early slot, a spotter on the van and pieces staged in one movement rather than several trips. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. The crate stays on the van until the route in is clear. There is nothing to drive to and nothing to pick up, because both visits are to the property itself.

02

What do the kitchens in Strand do to worktop splashbacks & upstands?

Internal walls are lath on timber studs while the flank walls are brick, so two walls in the same kitchen take a fixing completely differently. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. The wall gets made good first or the gap shows. Anything that has to stay accessible, a stopcock, a gas meter, a riser panel, is marked on the template so the stone is cut around it instead of over it. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. The sill caps the upstand before anything else does.

03

Do you have trouble getting long pieces into Strand kitchens?

The lift has to be booked and blanketed before anything moves, and that booking needs to cover the old tops coming out as well as the new stone going in. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. That is agreed at template, not on fitting day. A single red line has hours and a double red line does not, and the difference decides whether an early start is a plan or a penalty. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Distance from tail lift to door is the whole risk here.

04

Do you get much worktop splashbacks & upstands work in Strand?

Honestly, no, though it would be easy to claim otherwise. What the research on this patch actually lists is worktop fabrication and worktop installation. That says something about the housing round here, not about the work. Quote, cut and fit are the same here as on any other part of the patch. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. The annexe gets the same panel as the main run. Extension work runs late far more often than it runs early, and the worktop is close to the last thing in, so the date agreed at the start is rarely the date that happens. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. A repeated spec needs a repeatable splashback.

05

What decides the price of a worktop in Strand?

A tall bank of housings at one end takes a chunk out of the working run, so the usable length of that side is always less than the length of the wall behind it. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Scribe to the wall rather than stretch the panel. Reckon on £110 to £550 per square metre for the material supply only, with templating, fabrication and fitting itemised separately.

06

What do I need to sort out first?

A notch around a boxed stack is machined with a radius at the internal corner, because a square inside corner there is exactly where a top will crack. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. A downstand sets the panel height, not the wall units. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. Because the money comes out of a household rather than a maintenance budget, phasing is common: tops now, island or splashbacks later, quoted so the second visit still matches the first. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. The wall has to be ready.

07

Will you fit stone onto units that are not level?

Packing takes up small variation. It is not there to hide something that belongs in the units. Units have to be fitted, fixed and level before templating, and it is better to hear that at the template than on the fitting day. Levelling belongs in the carcasses, on their own legs and packers. A live soil stack cannot be chased back into the wall, so the depth it steals is permanent and the run is planned around it rather than through it. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. Behind the boxing it becomes two pieces.

08

What happens between the template and the fitting day?

Nothing is measured until the sink, the tap and the hob are in the room to measure against. Templating and fitting are two visits, not one, and the gap between them is when the stone is actually cut. A template on a normal kitchen takes two to three hours in the room. A hundred and forty years of alterations sit under the current kitchen, and the worktop is what has to sit flat on top of all of it. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Window reveals decide where the run of stone stops.

09

Does a stone worktop need sealing?

Quartz carries resin, so a hot pan wants a trivet, while granite and sintered stone will take one without complaint. Granite tells you when the seal wants topping up: water stops beading on the surface and starts darkening it instead. Granite is porous to varying degrees, so it is sealed when we fit it and topped up over the life of the worktop. Many were built with a solid sub-floor to the rear rooms, so the kitchen floor is concrete and level while the front of the house is suspended timber. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. Solid plaster on brick takes a panel; a hollow wall wants thought.

10

Can the sink be undermounted rather than sat on top?

If the sink or hob changes after the template, the drawing changes first and nothing is cut meanwhile. A tap under a window board still needs room for its handle to lift, which is checked at the template. Nothing is cut out in the kitchen. Cutting a bowl on site is how worktops get cracked. A full-depth tall unit projects past the worktop line, and the run has to be scribed against its side panel instead of carrying on past it. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. Tall panels are what push a job into a second slab.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Lovely team, business and quality motivated, prompt delivery with installation. Affordable prices. Wide range of worktops available. High recommendation”
Loreta SkalisieneGoogle review
★★★★★
“Great service. Super quick and easy communication. I love my new worktop 🥹🥹”
Sara ArghirGoogle review
★★★★★
“Professional, polite and friendly service. Very pleased with finished product.”
costas andrewsGoogle review

Next step

Splashbacks and upstands in Strand, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.