Wandsworth · SW18 SW11 SW12

Splashbacks and upstands in Wandsworth Common

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

Wandsworth Common kitchens

The kitchens we meet in Wandsworth Common

People often assume splashback and upstand work in Wandsworth Common is a straight swap, and sometimes it is, though the kitchen usually has an opinion about that. The larger houses on the streets bordering the common support full basement or lower-ground kitchens with a big island, a separate pantry run and often a second sink. Ceiling heights are generous, so tall stone splashback panels behind the range are common. You will get a firm figure for your Wandsworth Common kitchen once it has been templated, and that figure does not move afterwards.

There is usually a step down into the back addition, so the kitchen floor and the hall floor are not the same level and neither of them is flat. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. The extractor position is measured before the panel is drawn.

The closet wing is a narrow projection at the back with windows on two sides, which leaves very little continuous wall for a run. A full-height panel in a chimney recess is templated as a trapezium, since that recess is square in neither direction. Old plaster rarely gives you a flat metre.

What we are measuring in, mostly, is Large Victorian villa, Edwardian detached and semi and Mansion flat. The template reads them differently even where the layout looks identical.

Polished stone edge profile close up
  • Large Victorian villa
  • Edwardian detached and semi
  • Mansion flat

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Upstands are small pieces, so they usually come out of the offcut the worktop leaves.
  • Dekton and sintered stone are stable in heat and daylight, which is why they suit a wall behind a hob.
  • A wide wall takes more than one piece, because slab width is finite.
Borough
Wandsworth
Postcodes
SW18, SW11, SW12
Covered on
our south west London run
Fitted
5–10 working days from template

The place

Why Wandsworth Common is its own job

We measure and fit in Wandsworth Common often enough to know what to ask about before anyone agrees a date. Many of these houses have a lower-ground entrance via a front lightwell with a steep flight of steps and a tight turn at the bottom, the worst carry in the area. On-street parking is permit-controlled with limited visitor bays. Getting stone down a lightwell stair is the constraint here, not the room, measure the stair headroom and the turn radius before agreeing any single-piece island top. Templating in the room after the units are level takes the guesswork out of all of it.

The work

What worktop splashbacks & upstands involves

The pieces are made to the wall they will stand against, so they are not stock items and cannot be ordered from a size. Each one is drawn for its own stretch of wall. Nothing is trimmed on site. The openings and the returns are machined at the workshop, so the drawing has to carry every dimension the wall is going to demand of the piece. You end up with a joint that stays closed. It is siliconed rather than filled hard, so the wall and the surface can move against each other without opening a crack.

Upstands and splashbacks are drawn, priced and made as their own piece of work, not thrown in as an offcut at the end of a worktop order. Panels are offered up dry before any adhesive goes near them, and the scribe comes off the piece, never off the plaster. A rear extension often puts the sink under a window whose sill is barely clear of the surface, and that settles the height before anyone gets a say. One sheet, two seams, nothing to reseal.

Edge profiles See the options

The money

What it costs in Wandsworth Common

Cutting from the same slab run as the worktop is what keeps the colour matched, and ordering the two together is cheaper than ordering them apart. An island is a yield question before it is a design one: it either comes out of the same slab as the perimeter or it needs a second. The stone itself is £110 to £550 per square metre supply only; everything done to it is priced separately and shown separately. The cut-outs are counted, not estimated.

period detached houses and villas

What Wandsworth Common asks for

Honestly, this is not what we do most on this patch. Worktop fabrication come up more often. That is a statement about the local housing rather than about the work, and nothing about how it is quoted, cut or fitted changes because of it.

period detached houses and villas

Wandsworth Common in the housing figures

Across Wandsworth Common, most of what is standing went up before 1919. A tall panel exposes what an upstand covers, so the wall has to be made good first. Templated after the top is in, never before.

period detached houses and villas

The carry, and what it rules out

Where the household has used up the visitor permits it gets for the year, the remaining options are a suspension or a paid bay and both belong on the quote. Where the carry is long the panels come in on edge, two hands on them and nothing else in the way. Two hands and a clear route, or it waits on the van.

Access

Getting stone into a Wandsworth Common kitchen

On-street parking is permit-controlled with limited visitor bays.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South west London patch

Wandsworth Common is covered on our south west London run, along with the rest of Wandsworth.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Wandsworth Common

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Are you set up to work in Wandsworth Common, or is it a subcontractor?

Yes. Wandsworth Common is on the patch, and the postcodes we work here are SW18, SW11, SW12. It is worked on our south west London run, along with the rest of Wandsworth. Estate roads inside a controlled zone are sometimes managed privately rather than by the council, which changes who has to be asked. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. The longer the walk, the fewer the panels per trip. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

02

What is different about worktop splashbacks & upstands in Wandsworth Common?

Original panelling and shutter boxes stand out from the structural wall, so the face the units meet is joinery rather than plaster. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. The wall gets made good first or the gap shows. A room can be out of square in both directions at once, so the wall that leans is also the wall that runs downhill, and one scribe cannot answer both. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Upstands sit tight because both edges are cut.

03

Is access a problem in Wandsworth Common?

Communal stairs get boarded and the handrail padded, and we walk the route with a tape before the first piece leaves the van. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. They stand upright in the van and stay upright until they are on the wall. A controlled parking zone means either a visitor permit sorted in advance or a suspended bay, and a suspension is applied for days ahead rather than on the morning. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. A narrow gap between parked cars decides how a panel turns.

04

Would you call Wandsworth Common a worktop splashbacks & upstands area?

Not really, and there is no sense dressing it up. What the research on this patch actually lists is worktop fabrication. That is a statement about the local housing rather than about the work. It gets quoted, cut and fitted exactly as it would anywhere else on the patch. Where an annexe has been built or converted, its floor and its walls are newer than the main house and behave differently under the same run. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Cut with the tops while the batch is open. Extended households run kitchens hard, and that pushes the specification towards granite or sintered stone rather than a light quartz. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Cut as a set, so one can replace another.

05

What makes one Wandsworth Common kitchen dearer than the next?

It is the heaviest single piece in the kitchen, so the number of hands needed on the day and the route in are worked out from that piece rather than from the runs. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. A peninsula end takes a panel on both faces. Material sits between £110 and £550 per square metre supply only, and templating, fabrication and fitting are quoted line by line.

06

What holds a template up more often than anything else?

Plaster thickness varies over the height of a wall, so the line at worktop height is not the line at skirting level, and the units decide which one matters. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. A breast return is scribed on three edges. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. Two flats with an identical layout can want entirely different things from the same run of worktop, which is why the quote follows the run rather than the address. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. A second visit needs a second permission.

07

Is templating a separate visit from fitting?

Templating and fitting are two visits, not one, and the gap between them is when the stone is actually cut. Upstands and splashbacks are templated after the worktop is down and settled, so they are a separate visit. No payment is due before the template. Sash windows sit low in the rear wall, and the sill often lands below the height a worktop wants to run past. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Behind the hob is where full height earns its cost.

08

Is the quote a fixed price or an estimate?

No installed price per square metre is published, because it is not a real number. The design and quotation visit is free and carries no obligation, so a figure exists before any commitment. Ask for the lines rather than the total. One number for a kitchen tells you nothing you can check. Two walls each a degree out give an internal corner two degrees out, and the whole of that error lands in the mitre. It decides whether the run gets one continuous piece or a set of separate lengths with a joint at every obstruction. Set it proud on a subframe and the gap becomes deliberate.

09

Do you take the old worktop away?

On a replacement the old top comes off in the morning and the new stone is down and sealed the same day. Take the old tops off yourself if you would rather, and the quote simply carries one line fewer. An old stone top is heavier coming out than the new one is going in, and leaves in sections. Permit hours are what matters, not the permit itself, because a bay that frees up at six in the evening is no use for a template at ten. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. These travel flat and get carried on edge, and both want room.

10

Can I have grooves instead of a separate drainer in Wandsworth Common?

On a porous stone the grooved area is sealed with the rest, and it gets wet more than anything else. Which side of the bowl they go is about how you stand at the sink, and it is settled before cutting. The bowl position has to be settled before templating, since the grooves are set out from it. The side return was an outside toilet and a coal store before it was ever a kitchen, and the walls left over from that are half a brick thick. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Panel joints land over a unit line, never mid-span.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Nice work from worktop worx. Highly recommended”
Rasika KumarageGoogle review
★★★★★
“Lovely team, business and quality motivated, prompt delivery with installation. Affordable prices. Wide range of worktops available. High recommendation”
Loreta SkalisieneGoogle review
★★★★★
“Great service. Super quick and easy communication. I love my new worktop 🥹🥹”
Sara ArghirGoogle review

Next step

Splashbacks and upstands in Wandsworth Common, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.